If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1066082806022 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 02/06-28-106-08W6/2 | |
Location Alias: 02/06-28-06-08 W6M | |
Location Alias 2: 02/06-28-106-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 106 | |
Meridian: 6 | |
Range: 08 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: TEI HARO 6-28-106-8 | |
Operator Name: Tallahassee Exploration Inc. | |
License Number: 0325254 | |
License Date: 2005-01-28 | |
License Status: Issued | |
Spud Date: 2005-02-10 | |
Final Drill Date: 2005-02-12 | |
Well Total Depth: 590.00 m | |
Surface Hole Latitude: 58.228929 | |
Surface Hole Longitude: -119.261074 |
Date | Event |
---|---|
2005-01-28 | Obtained License |
2005-02-11 | Surface Casing Operation Performed |
2005-02-12 | Finished Drilling |
2005-02-12 | Well Mode changed to Drilled and Cased |
2005-02-13 | Production Casing Operation Performed |
2005-02-13 | Rig Released |
2005-02-13 | Well Log Performed |
2005-02-19 | Well Log Performed |
2005-02-20 | Perforation Treatment Performed - Jet Perforation |
2005-02-26 | Perforation Treatment Performed - Jet Perforation |
2005-02-26 | Well Log Performed |
2005-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-03-24 | Well Began Production |
2005-03-24 | Well Fluid changed to Gas |
2005-03-24 | Well Mode changed to Flowing |
2009-06-01 | Well Fluid changed to Gas |
2009-06-01 | Well Mode changed to Suspended |
2010-07-08 | Well Fluid changed to Gas |
2010-07-08 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-20 | Perforation | 551.00 | 555.00 | 17 |
2005-02-20 | Perforation | 547.00 | 549.00 | 17 |
2005-02-26 | Perforation | 536.50 | 542.00 | 17 |
2005-02-26 | Perforation | 530.00 | 534.00 | 17 |
2005-03-06 | Acid Treatment | 536.50 | 542.00 | 0 |
2005-03-06 | Acid Treatment | 530.00 | 534.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 595 | 0.0 | 0.0 | 0.0 |
2006 | 7951 | 0.0 | 0.0 | 0.0 |
2007 | 8112 | 0.0 | 0.0 | 0.0 |
2008 | 8367 | 0.0 | 0.0 | 0.0 |
2009 | 2534 | 0.0 | 0.0 | 0.0 |
2010 | 3593 | 0.0 | 0.0 | 0.0 |
2011 | 7166 | 0.0 | 0.0 | 0.0 |
2012 | 7338 | 0.0 | 0.0 | 0.0 |
2013 | 8288 | 0.0 | 0.0 | 0.0 |
2014 | 8205 | 0.0 | 0.0 | 0.0 |
2015 | 7436 | 0.0 | 0.0 | 0.0 |
2016 | 8175 | 0.0 | 0.0 | 0.0 |
2017 | 8518 | 0.0 | 0.0 | 0.0 |
2018 | 5560 | 0.0 | 0.0 | 0.0 |
2019 | 2208 | 0.0 | 0.0 | 0.0 |
For data sources see[5]