If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096050704020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.443143,"lon":-118.832781,"icon":""}]} |
Location: 02/04-07-109-05W6/0 | |
Location Alias: 02/04-07-09-05 W6M | |
Location Alias 2: 02/04-07-109-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 05 | |
Section: 07 | |
County/Municipality: Mackenzie County | |
Well Name: NUVISTA RAINBOW 4-7-109-5 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0197422 | |
License Date: 1997-01-31 | |
License Status: Abandoned | |
Spud Date: 1997-03-10 | |
Final Drill Date: 1997-03-21 | |
Well Total Depth: 1762.00 m | |
Surface Hole Latitude: 58.443143 | |
Surface Hole Longitude: -118.832781 |
Date | Event |
---|---|
1997-01-31 | Obtained License |
1997-03-13 | Surface Casing Operation Performed |
1997-03-16 | Direction Drilling Operation Performed - Deviate |
1997-03-21 | Finished Drilling |
1997-03-21 | Well Mode changed to Drilled and Cased |
1997-03-22 | Production Casing Operation Performed |
1997-03-23 | Rig Released |
1997-03-26 | Perforation Treatment Performed - Open-Hole Completion |
1997-03-26 | Well Log Performed |
1997-03-27 | Well Log Performed |
1997-03-28 | Well Log Performed |
1997-03-30 | Well Log Performed |
1997-04-04 | Well Began Production |
1997-04-04 | Well Fluid changed to Crude Oil |
1997-04-04 | Well Mode changed to Pumping |
1997-04-08 | Well Log Performed |
2010-05-01 | Well Fluid changed to Crude Oil |
2010-05-01 | Well Mode changed to Suspended |
2012-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-09 | Plug Back Performed |
2012-01-09 | Well Fluid changed to Crude Oil |
2012-01-09 | Well Mode changed to Abandoned Zone |
2012-02-14 | Perforation Treatment Performed - Jet Perforation |
2012-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-15 | Perforation Treatment Performed - Jet Perforation |
2012-02-16 | Perforation Treatment Performed - Remedial Casing |
2012-02-17 | Perforation Treatment Performed - Jet Perforation |
2012-02-18 | Perforation Treatment Performed - Remedial Casing |
2012-02-19 | Perforation Treatment Performed - Jet Perforation |
2012-02-20 | Perforation Treatment Performed - Remedial Casing |
2012-02-21 | Perforation Treatment Performed - Jet Perforation |
2012-02-23 | Perforation Treatment Performed - Remedial Casing |
2012-02-24 | Perforation Treatment Performed - Jet Perforation |
2012-02-26 | Perforation Treatment Performed - Remedial Casing |
2012-03-04 | Well Abandoned |
2012-03-04 | Well Fluid changed to Crude Oil |
2012-03-04 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-03-16 | 1266.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-03-26 | Open Hole/Barefoot Completion | 1744.00 | 1762.00 | 0 |
2012-02-20 | Remedial Casing Cementing | 450.00 | 452.00 | 0 |
2012-02-21 | Perforation | 418.00 | 420.00 | 17 |
2012-02-23 | Remedial Casing Cementing | 418.00 | 420.00 | 0 |
2012-02-24 | Perforation | 400.00 | 402.00 | 17 |
2012-02-26 | Remedial Casing Cementing | 400.00 | 402.00 | 0 |
2012-01-09 | Packing Device Capped w/Cement | 1732.00 | 1740.00 | 0 |
2012-02-14 | Perforation | 938.00 | 940.00 | 17 |
2012-02-15 | Packing Device Capped w/Cement | 924.00 | 932.00 | 0 |
2012-02-15 | Perforation | 590.00 | 592.00 | 17 |
2012-02-16 | Remedial Casing Cementing | 590.00 | 592.00 | 0 |
2012-02-17 | Perforation | 500.00 | 502.00 | 17 |
2012-02-18 | Remedial Casing Cementing | 500.00 | 502.00 | 0 |
2012-02-19 | Perforation | 450.00 | 452.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 6213 | 0.0 | 0.0 | 0.0 |
1998 | 7034 | 0.0 | 0.0 | 0.0 |
1999 | 5774 | 0.0 | 0.0 | 0.0 |
2000 | 7306 | 0.0 | 0.0 | 0.0 |
2001 | 3180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]