If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096060606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.433209,"lon":-118.995245,"icon":""}]} |
Location: 00/06-06-109-06W6/2 | |
Location Alias: 00/06-06-09-06 W6M | |
Location Alias 2: 00/06-06-109-06 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 06 | |
Section: 06 | |
County/Municipality: Mackenzie County | |
Well Name: HUBER ET AL RAINBOW 6-6-109-6 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0035563 | |
License Date: 1969-01-06 | |
License Status: RecCertified | |
Spud Date: 1969-01-26 | |
Final Drill Date: 1969-02-11 | |
Well Total Depth: 1937.00 m | |
Surface Hole Latitude: 58.433209 | |
Surface Hole Longitude: -118.995245 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-01-06 | Obtained License |
1969-02-11 | Finished Drilling |
1969-02-11 | Well Log Performed |
1969-02-13 | Production Casing Operation Performed |
1969-02-19 | Perforation Treatment Performed - Jet Perforation |
1973-01-05 | Perforation Treatment Performed - Cement Squeeze |
1973-01-05 | Perforation Treatment Performed - Jet Perforation |
1976-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-12-02 | Perforation Treatment Performed - Jet Perforation |
1976-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-12-09 | Perforation Treatment Performed - Cement Squeeze |
1976-12-13 | Perforation Treatment Performed - Cement Squeeze |
1976-12-19 | Perforation Treatment Performed - Jet Perforation |
1976-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-01-01 | Well Mode changed to Drilled and Cased |
1977-10-01 | Well Began Production |
1977-10-01 | Well Fluid changed to Crude Oil |
1977-10-01 | Well Mode changed to Pumping |
1985-06-02 | Perforation Treatment Performed - Fractured |
1990-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-06-11 | Perforation Treatment Performed - Cement Plug |
1990-06-11 | Perforation Treatment Performed - Cement Squeeze |
1990-06-11 | Plug Back Performed |
1990-06-11 | Well Fluid changed to Crude Oil |
1990-06-11 | Well Mode changed to Abandoned |
1990-06-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-02-19 | Perforation | 1829.40 | 1832.50 | 7 |
1976-12-19 | Perforation | 1666.00 | 1668.50 | 7 |
1976-12-19 | Perforation | 1674.60 | 1677.60 | 7 |
1976-12-22 | Acid Treatment | 1666.00 | 1677.60 | 0 |
1985-06-02 | Fracture | 1666.00 | 1677.60 | 0 |
1990-06-11 | Cement Squeeze | 1666.00 | 1677.60 | 0 |
1990-06-11 | Packing Device Capped w/Cement | 1520.00 | 1643.00 | 0 |
1990-06-11 | Cement Plug | 360.00 | 761.00 | 0 |
1973-01-05 | Perforation | 1845.30 | 1846.50 | 13 |
1973-01-05 | Cement Squeeze | 1845.30 | 1846.50 | 0 |
1976-08-10 | Packing Device Capped w/Cement | 1813.60 | 1822.70 | 0 |
1976-12-02 | Perforation | 1666.00 | 1670.00 | 7 |
1976-12-02 | Perforation | 1674.60 | 1677.60 | 7 |
1976-12-04 | Acid Treatment | 1666.00 | 1677.60 | 0 |
1976-12-09 | Cement Squeeze | 1666.00 | 1677.60 | 0 |
1976-12-13 | Cement Squeeze | 1666.00 | 1677.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 1703 | 0.0 | 0.0 | 0.0 |
1978 | 4396 | 0.0 | 0.0 | 0.0 |
1979 | 4533 | 0.0 | 0.0 | 0.0 |
1980 | 5865 | 0.0 | 0.0 | 0.0 |
1981 | 7712 | 0.0 | 0.0 | 0.0 |
1982 | 7541 | 0.0 | 0.0 | 0.0 |
1983 | 5955 | 0.0 | 0.0 | 0.0 |
1984 | 8147 | 0.0 | 0.0 | 0.0 |
1985 | 6923 | 0.0 | 0.0 | 0.0 |
1986 | 8506 | 0.0 | 0.0 | 0.0 |
1987 | 8324 | 0.0 | 0.0 | 0.0 |
1988 | 8134 | 0.0 | 0.0 | 0.0 |
1989 | 7845 | 0.0 | 0.0 | 0.0 |
1990 | 1616 | 0.0 | 0.0 | 0.0 |
For data sources see[5]