If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096062110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.481172,"lon":-118.934708,"icon":""}]} |
Location: 00/10-21-109-06W6/0 | |
Location Alias: 00/10-21-09-06 W6M | |
Location Alias 2: 00/10-21-109-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 06 | |
Section: 21 | |
County/Municipality: Mackenzie County | |
Well Name: MOBIL RAINBOW 10-21-109-6 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0138045 | |
License Date: 1989-01-10 | |
License Status: Abandoned | |
Spud Date: 1989-03-16 | |
Final Drill Date: 1989-04-03 | |
Well Total Depth: 1882.00 m | |
Surface Hole Latitude: 58.481172 | |
Surface Hole Longitude: -118.934708 |
Date | Event |
---|---|
1989-01-10 | Obtained License |
1989-03-17 | Lost Circulation Occurred |
1989-03-18 | Lost Circulation Occurred |
1989-03-18 | Surface Casing Operation Performed |
1989-04-03 | Finished Drilling |
1989-04-03 | Well Mode changed to Drilled and Cased |
1989-04-04 | Well Log Performed |
1989-04-05 | Production Casing Operation Performed |
1989-04-06 | Rig Released |
1989-09-03 | Well Log Performed |
1989-09-04 | Perforation Treatment Performed - Jet Perforation |
1989-09-04 | Well Log Performed |
1989-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-09-12 | Plug Back Performed |
1989-09-12 | Well Log Performed |
1989-11-20 | Perforation Treatment Performed - Jet Perforation |
1989-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-12-22 | Well Began Production |
1989-12-22 | Well Fluid changed to Crude Oil |
1989-12-22 | Well Mode changed to Pumping |
1990-03-27 | Well Log Performed |
1990-10-01 | Well Fluid changed to Crude Oil |
1990-10-01 | Well Mode changed to Suspended |
2000-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-08-06 | Perforation Treatment Performed - Cement Squeeze |
2000-08-06 | Perforation Treatment Performed - Jet Perforation |
2000-08-06 | Plug Back Performed |
2000-08-06 | Well Fluid changed to Crude Oil |
2000-08-06 | Well Log Performed |
2000-08-06 | Well Mode changed to Abandoned Zone |
2000-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-08-07 | Perforation Treatment Performed - Remedial Casing |
2000-08-07 | Well Log Performed |
2000-08-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-08-08 | Perforation Treatment Performed - Jet Perforation |
2000-08-08 | Perforation Treatment Performed - Remedial Casing |
2002-08-17 | Well Log Performed |
2002-08-18 | Perforation Treatment Performed - Jet Perforation |
2002-08-19 | Well Log Performed |
2002-08-22 | Perforation Treatment Performed - Cement Squeeze |
2003-07-20 | Well Abandoned |
2003-07-20 | Well Fluid changed to Crude Oil |
2003-07-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-09-04 | Perforation | 1719.50 | 1721.00 | 13 |
1989-11-22 | Acid Treatment | 1613.00 | 1623.00 | 0 |
2000-08-06 | Cement Squeeze | 1613.00 | 1623.00 | 0 |
2000-08-06 | Packing Device Capped w/Cement | 1529.00 | 1604.00 | 0 |
2000-08-06 | Perforation | 564.00 | 565.00 | 18 |
2000-08-07 | Acid Treatment | 564.00 | 565.00 | 0 |
2000-08-07 | Remedial Casing Cementing | 564.00 | 565.00 | 0 |
2000-08-07 | Packing Device Capped w/Cement | 480.00 | 555.00 | 0 |
2000-08-08 | Perforation | 400.00 | 401.00 | 18 |
2000-08-08 | Remedial Casing Cementing | 400.00 | 401.00 | 18 |
2000-08-08 | Packing Device Capped w/Cement | 356.00 | 391.00 | 0 |
1989-09-04 | Perforation | 1722.50 | 1725.00 | 13 |
2002-08-18 | Perforation | 565.50 | 566.50 | 13 |
2002-08-22 | Cement Squeeze | 565.50 | 566.50 | 0 |
1989-09-04 | Perforation | 1726.00 | 1729.00 | 13 |
1989-09-04 | Perforation | 1759.50 | 1767.00 | 13 |
1989-09-05 | Acid Treatment | 1726.00 | 1767.00 | 0 |
1989-09-06 | Acid Treatment | 1719.50 | 1725.00 | 0 |
1989-09-12 | Packing Device Capped w/Cement | 1701.50 | 1710.00 | 0 |
1989-11-20 | Perforation | 1613.00 | 1615.00 | 13 |
1989-11-20 | Perforation | 1618.00 | 1623.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 146 | 0.0 | 0.0 | 0.0 |
1990 | 2906 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-03-17 | Lost Circulation | 251.00 | 251.00 |
1989-03-18 | Lost Circulation | 403.00 | 403.00 |
For data sources see[6]