X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1106063111002

Well Details

Well ID: 1106063111002
Loading map...
Location: 00/11-31-110-06W6/2
Location Alias: 00/11-31-10-06 W6M
Location Alias 2: 00/11-31-110-06 W6/02
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 06
Section: 31
County/Municipality: Mackenzie County
Well Name: NUVISTA RAINBOW 11-31-110-6
Operator Name: NuVista Energy Ltd.
License Number: 0106514
License Date: 1984-03-13
License Status: Abandoned
Spud Date: 1984-03-21
Final Drill Date: 1984-04-08
Well Total Depth: 1947.00 m
Surface Hole Latitude: 58.596076
Surface Hole Longitude: -118.994528

For data sources see[1][2]

Well History

Date Event
1984-03-13 Obtained License
1984-03-31 Well Log Performed
1984-04-02 Drill Stem Test Performed
1984-04-03 Production Casing Operation Performed
1984-04-08 Finished Drilling
1984-04-08 Well Log Performed
1984-04-10 Drill Stem Test Performed
1984-11-04 Well Log Performed
1984-11-05 Well Log Performed
1984-11-06 Perforation Treatment Performed - Jet Perforation
1984-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-09 Well Log Performed
1984-11-11 Perforation Treatment Performed - Cement Squeeze
1984-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-12 Perforation Treatment Performed - Jet Perforation
1984-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-03 Well Mode changed to Drilled and Cased
2018-02-10 Well Log Performed
2018-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-11 Plug Back Performed
2018-02-11 Well Log Performed
2018-02-11 Well Mode changed to Abandoned Zone
2018-02-12 Perforation Treatment Performed - Cement Squeeze
2018-02-12 Perforation Treatment Performed - Jet Perforation
2018-02-12 Well Log Performed
2018-02-13 Perforation Treatment Performed - Jet Perforation
2018-02-13 Perforation Treatment Performed - Remedial Casing
2018-02-22 Well Abandoned
2018-02-22 Well Mode changed to Abandoned
2020-01-26 Perforation Treatment Performed - Jet Perforation
2020-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-28 Plug Back Performed
2020-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-29 Perforation Treatment Performed - Jet Perforation
2020-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-31 Perforation Treatment Performed - Remedial Casing
2020-01-31 Plug Back Performed
2020-02-01 Perforation Treatment Performed - Jet Perforation
2020-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-03 Perforation Treatment Performed - Remedial Casing
2020-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-04 Perforation Treatment Performed - Jet Perforation
2020-02-04 Plug Back Performed
2020-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-06 Perforation Treatment Performed - Remedial Casing
2020-02-06 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-06 Perforation 1650.00 1650.50 14
2018-02-13 Perforation 395.00 593.00 20
2018-02-13 Remedial Casing Cementing 395.00 593.00 0
2020-01-26 Perforation 1551.50 1553.50 20
2020-01-27 Acid Treatment 1551.50 1553.50 0
2020-01-28 Packing Device Capped w/Cement 1535.00 1543.00 0
2020-01-29 Perforation 941.00 943.00 20
2020-01-29 Acid Treatment 941.00 943.00 0
2020-01-31 Remedial Casing Cementing 941.00 943.00 0
2020-01-31 Packing Device Capped w/Cement 928.50 937.80 0
2020-02-01 Perforation 797.00 799.00 20
1984-11-07 Acid Treatment 1650.00 1650.50 0
2020-02-02 Acid Treatment 797.00 799.00 0
2020-02-03 Remedial Casing Cementing 797.00 799.00 0
2020-02-04 Packing Device Capped w/Cement 785.50 793.50 0
2020-02-04 Perforation 577.00 579.00 20
2020-02-05 Acid Treatment 577.00 579.00 0
2020-02-06 Remedial Casing Cementing 577.00 579.00 0
2020-02-06 Packing Device Capped w/Cement 418.50 570.00 0
1984-11-11 Cement Squeeze 1650.00 1650.50 0
1984-11-12 Perforation 1644.50 1645.50 14
1984-11-12 Acid Treatment 1644.50 1645.50 0
1984-11-17 Acid Treatment 1644.50 1645.50 0
2018-02-11 Packing Device Capped w/Cement 1632.00 1640.00 0
2018-02-12 Perforation 577.00 579.00 40
2018-02-12 Cement Squeeze 577.00 579.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-14 No Incident Encountered 0.00 0.00
2020-02-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References