X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1106071103002

Well Details

Well ID: 1106071103002
Loading map...
Location: 00/03-11-110-07W6/2
Location Alias: 00/03-11-10-07 W6M
Location Alias 2: 00/03-11-110-07 W6/02
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 07
Section: 11
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY RAINBOW 3-11-110-7
Operator Name: Cabot Energy Inc.
License Number: 0030555
License Date: 1966-06-14
License Status: Suspension
Spud Date: 1966-06-19
Final Drill Date: 1987-03-12
Well Total Depth: 1821.10 m
Surface Hole Latitude: 58.530247
Surface Hole Longitude: -119.049558

For data sources see[1][2]

Well History

Date Event
1966-06-14 Obtained License
1987-02-10 Direction Drilling Operation Performed - Horizontal
1987-03-12 Finished Drilling
1987-03-12 Perforation Treatment Performed - Open-Hole Completion
1987-03-12 Well Mode changed to Drilled and Cased
1987-03-14 Rig Released
1987-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-08 Well Began Production
1987-04-08 Well Fluid changed to Crude Oil
1987-04-08 Well Mode changed to Pumping
1987-05-19 Well Log Performed
1990-11-20 Well Log Performed
1993-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-28 Plug Back Performed
1993-03-28 Well Fluid changed to Crude Oil
1993-03-28 Well Mode changed to Abandoned Zone
1993-03-29 Perforation Treatment Performed - Jet Perforation
1993-03-29 Well Log Performed
2012-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-15 Plug Back Performed
2012-02-15 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-02-10 1656.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-03-12 Open Hole/Barefoot Completion 1714.50 1821.10 0
1987-03-16 Acid Treatment 1714.50 1821.10 0
1993-03-28 Packing Device Capped w/Cement 1632.00 1640.00 0
1993-03-29 Perforation 1605.60 1611.70 14
2012-02-15 Packing Device Capped w/Cement 1589.00 1597.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 5845 0.0 0.0 0.0
1988 7625 0.0 0.0 0.0
1989 7649 0.0 0.0 0.0
1990 8419 0.0 0.0 0.0
1991 7980 0.0 0.0 0.0
1992 1479 0.0 0.0 0.0

For data sources see[6]

References