If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1106082305002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.56288,"lon":-119.224637,"icon":""}]} |
Location: 00/05-23-110-08W6/2 | |
Location Alias: 00/05-23-10-08 W6M | |
Location Alias 2: 00/05-23-110-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 110 | |
Meridian: 6 | |
Range: 08 | |
Section: 23 | |
County/Municipality: Mackenzie County | |
Well Name: NUVISTA RAINBOW 5-23-110-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0031811 | |
License Date: 1967-02-21 | |
License Status: Suspension | |
Spud Date: 1967-02-25 | |
Final Drill Date: 1967-04-29 | |
Well Total Depth: 2105.90 m | |
Surface Hole Latitude: 58.562880 | |
Surface Hole Longitude: -119.224637 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-02-21 | Obtained License |
1967-03-13 | Drill Stem Test Performed |
1967-03-16 | Drill Stem Test Performed |
1967-03-20 | Drill Stem Test Performed |
1967-04-20 | Lost Circulation Occurred |
1967-04-25 | Lost Circulation Occurred |
1967-04-29 | Finished Drilling |
1967-04-29 | Well Mode changed to Drilled and Cased |
1967-05-03 | Drill Stem Test Performed |
1967-05-04 | Drill Stem Test Performed |
1967-05-06 | Drill Stem Test Performed |
1967-05-08 | Liner Casing Operation Performed |
1967-05-19 | Perforation Treatment Performed - Jet Perforation |
1967-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-07-24 | Perforation Treatment Performed - Cement Squeeze |
1983-07-24 | Perforation Treatment Performed - Jet Perforation |
1983-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-03-29 | Plug Back Performed |
1989-02-17 | Perforation Treatment Performed - Jet Perforation |
1989-03-01 | Well Began Production |
1989-03-01 | Well Fluid changed to Gas |
1989-03-01 | Well Mode changed to Flowing |
1989-03-05 | Well Fluid changed to Gas |
1989-03-05 | Well Mode changed to Suspended |
1991-12-16 | Well Fluid changed to Gas |
1991-12-16 | Well Mode changed to Flowing |
1993-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-02-06 | Plug Back Performed |
1993-02-06 | Well Fluid changed to Gas |
1993-02-06 | Well Log Performed |
1993-02-06 | Well Mode changed to Abandoned Zone |
1993-02-10 | Perforation Treatment Performed - Jet Perforation |
1993-02-10 | Well Log Performed |
1993-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-05-19 | Perforation | 1865.40 | 1866.60 | 7 |
1993-02-11 | Acid Treatment | 1714.20 | 1722.70 | 0 |
1993-02-14 | Acid Treatment | 1714.20 | 1722.70 | 0 |
1967-05-20 | Acid Treatment | 1865.40 | 1866.60 | 0 |
1983-07-24 | Cement Squeeze | 1865.40 | 1866.60 | 0 |
1983-07-24 | Perforation | 1853.80 | 1855.00 | 13 |
1983-07-25 | Acid Treatment | 1853.80 | 1855.00 | 0 |
1984-03-29 | Packing Device Capped w/Cement | 1837.00 | 1845.00 | 0 |
1989-02-17 | Perforation | 1801.40 | 1806.20 | 13 |
1993-02-06 | Packing Device Capped w/Cement | 1762.00 | 1770.00 | 0 |
1993-02-10 | Perforation | 1714.20 | 1722.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 107 | 0.0 | 0.0 | 0.0 |
1991 | 58 | 0.0 | 0.0 | 0.0 |
1992 | 101 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1967-04-20 | Lost Circulation | 1809.90 | 1809.90 |
1967-04-25 | Lost Circulation | 2066.50 | 2105.80 |
For data sources see[6]