Well Details

Well ID: 1106083612000
Loading map...
Location: 00/12-36-110-08W6/0
Location Alias: 00/12-36-10-08 W6M
Location Alias 2: 00/12-36-110-08 W6/00
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 08
Section: 36
County/Municipality: Mackenzie County
Well Name: KR ET AL RAINBOW 12-36-110-8
Operator Name: Phoenix Resources Company
License Number: 0036038
License Date: 1969-03-17
License Status: Re-Entered
Spud Date: 1969-03-23
Final Drill Date: 1969-04-14
Well Total Depth: 1935.50 m
Surface Hole Latitude: 58.596526
Surface Hole Longitude: -119.194179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-17 Obtained License
1969-04-10 Drill Stem Test Performed
1969-04-12 Drill Stem Test Performed
1969-04-14 Finished Drilling
1969-04-14 Well Mode changed to Drilled and Cased
1969-04-15 Drill Stem Test Performed
1969-04-16 Drill Stem Test Performed
1969-04-17 Production Casing Operation Performed
1969-07-12 Perforation Treatment Performed - Jet Perforation
1969-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-07-15 Well Began Production
1969-07-15 Well Fluid changed to Crude Oil
1969-07-15 Well Mode changed to Flowing
1969-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-05 Well Fluid changed to Crude Oil
1970-01-05 Well Mode changed to Suspended
1971-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-11-26 Well Abandoned
1971-11-26 Well Fluid changed to Crude Oil
1971-11-26 Well Mode changed to Abandoned and Re-entered
1993-03-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-12 Perforation 1867.20 1870.30 7
1969-07-13 Acid Treatment 1867.20 1870.30 0
1969-07-14 Acid Treatment 1867.20 1870.30 0
1969-09-09 Acid Treatment 1867.20 1870.30 0
1971-11-26 Packing Device Capped w/Cement 1836.40 1836.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 389 0.0 0.0 0.0

For data sources see[5]