X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1116062515002

Well Details

Well ID: 1116062515002
Loading map...
Location: 00/15-25-111-06W6/2
Location Alias: 00/15-25-11-06 W6M
Location Alias 2: 00/15-25-111-06 W6/02
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 06
Section: 25
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY RAINBOW 15-25-111-6
Operator Name: Cabot Energy Inc.
License Number: 0194233
License Date: 1996-11-28
License Status: Suspension
Spud Date: 1996-12-07
Final Drill Date: 1996-12-16
Well Total Depth: 2150.00 m
Surface Hole Latitude: 58.667109
Surface Hole Longitude: -118.853999

For data sources see[1][2]

Well History

Date Event
1996-11-28 Obtained License
1996-12-11 Direction Drilling Operation Performed - Horizontal
1996-12-16 Finished Drilling
1996-12-16 Perforation Treatment Performed - Open-Hole Completion
1996-12-16 Well Log Performed
1996-12-16 Well Mode changed to Drilled and Cased
1996-12-18 Liner Casing Operation Performed
1996-12-19 Rig Released
1997-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-09 Well Began Production
1997-02-09 Well Fluid changed to Crude Oil
1997-02-09 Well Mode changed to Pumping
2001-10-31 Well Fluid changed to Crude Oil
2001-10-31 Well Mode changed to Suspended
2011-01-25 Well Log Performed
2011-02-03 Well Log Performed
2011-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-04 Plug Back Performed
2011-02-04 Well Fluid changed to Crude Oil
2011-02-04 Well Log Performed
2011-02-04 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-12-11 1342.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-16 Open Hole/Barefoot Completion 1513.00 2150.00 0
1997-01-16 Acid Treatment 1513.00 2150.00 0
1997-01-18 Acid Treatment 1513.00 2150.00 0
2011-02-04 Packing Device Capped w/Cement 1310.00 1318.00 0
2011-02-04 Packing Device Capped w/Cement 249.00 257.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1307 0.0 0.0 0.0
1998 5831 0.0 0.0 0.0
1999 5089 0.0 0.0 0.0
2000 792 0.0 0.0 0.0

For data sources see[6]

References