X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1126051206000

Well Details

Well ID: 1126051206000
Loading map...
Location: 00/06-12-112-05W6/0
Location Alias: 00/06-12-12-05 W6M
Location Alias 2: 00/06-12-112-05 W6/00
Country: Canada
Province: Alberta
Township: 112
Meridian: 6
Range: 05
Section: 12
County/Municipality: Hay Lake 209
Well Name: IOE PEX ET AL SOUSA 6-12-112-5
Operator Name: Imperial Oil Resources Limited
License Number: 0025511
License Date: 1964-01-14
License Status: RecCertified
Spud Date: 1964-01-21
Final Drill Date: 1964-03-02
Well Total Depth: 1814.50 m
Surface Hole Latitude: 58.708270
Surface Hole Longitude: -118.695873

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-01-14 Obtained License
1964-02-04 Drill Stem Test Performed
1964-02-06 Drill Stem Test Performed
1964-02-09 Drill Stem Test Performed
1964-02-13 Drill Stem Test Performed
1964-02-15 Drill Stem Test Performed
1964-03-02 Finished Drilling
1964-03-03 Drill Stem Test Performed
1964-03-04 Production Casing Operation Performed
1964-03-06 Perforation Treatment Performed - Bullet Perforation
1964-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-09 Perforation Treatment Performed - Bullet Perforation
1964-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-18 Perforation Treatment Performed - Bullet Perforation
1964-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-04-03 Well Mode changed to Drilled and Cased
1991-03-14 Perforation Treatment Performed - Bullet Perforation
1991-03-15 Well Log Performed
1991-03-16 Perforation Treatment Performed - Cement Squeeze
1991-03-16 Perforation Treatment Performed - Jet Perforation
1991-03-16 Plug Back Performed
1991-03-17 Perforation Treatment Performed - Remedial Casing
1991-03-17 Well Abandoned
1991-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-03-06 Bullet Perforation 1268.00 1270.40 3
1964-03-18 Bullet Perforation 1300.00 1304.80 3
1964-03-18 Bullet Perforation 1307.30 1309.70 3
1964-03-18 Bullet Perforation 1286.60 1296.90 3
1964-03-18 Acid Treatment 1286.60 1319.80 0
1964-03-20 Packing Device Capped w/Cement 1226.80 1319.80 0
1991-03-14 Bullet Perforation 1268.00 1270.40 3
1991-03-14 Bullet Perforation 1286.60 1296.90 3
1991-03-14 Bullet Perforation 1300.00 1304.80 3
1991-03-14 Bullet Perforation 1307.30 1309.70 3
1991-03-14 Bullet Perforation 1319.20 1319.80 3
1964-03-07 Acid Treatment 1268.00 1270.40 0
1991-03-14 Bullet Perforation 1333.80 1335.00 3
1991-03-14 Bullet Perforation 1351.80 1353.00 3
1991-03-14 Bullet Perforation 1354.80 1355.40 3
1991-03-14 Bullet Perforation 1356.70 1357.30 3
1991-03-16 Cement Squeeze 1268.00 1357.30 0
1991-03-16 Perforation 200.00 201.00 13
1991-03-17 Remedial Casing Cementing 200.00 201.00 0
1964-03-09 Bullet Perforation 1351.80 1353.00 3
1964-03-09 Bullet Perforation 1354.80 1355.40 3
1964-03-09 Bullet Perforation 1356.70 1357.30 3
1964-03-09 Acid Treatment 1351.80 1357.30 0
1964-03-17 Packing Device Capped w/Cement 1350.30 1357.30 0
1964-03-18 Bullet Perforation 1333.80 1335.00 3
1964-03-18 Bullet Perforation 1319.20 1319.80 3

For data sources see[4]



References