X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146062015000

Well Details

Well ID: 1146062015000
Loading map...
Location: 00/15-20-114-06W6/0
Location Alias: 00/15-20-14-06 W6M
Location Alias 2: 00/15-20-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 20
County/Municipality: Amber River 211
Well Name: BOG VIRGO 15-20-114-6
Operator Name: Bradley Oil & Gas Inc.
License Number: 0116147
License Date: 1985-07-16
License Status: Issued
Spud Date: 1985-08-02
Final Drill Date: 1985-08-19
Well Total Depth: 1702.00 m
Surface Hole Latitude: 58.920584
Surface Hole Longitude: -118.965675

For data sources see[1][2]

Well History

Date Event
1985-07-16 Obtained License
1985-08-03 Surface Casing Operation Performed
1985-08-12 Well Log Performed
1985-08-13 Drill Stem Test Performed
1985-08-15 Intermediate Casing Operation Performed
1985-08-18 Lost Circulation Occurred
1985-08-19 Finished Drilling
1985-08-19 Well Log Performed
1985-08-19 Well Mode changed to Drilled and Cased
1985-08-20 Liner Casing Operation Performed
1985-08-20 Well Log Performed
1985-08-22 Rig Released
1985-09-02 Well Log Performed
1985-09-03 Perforation Treatment Performed - Jet Perforation
1985-09-03 Well Log Performed
1985-09-07 Well Began Production
1985-09-07 Well Fluid changed to Crude Oil
1985-09-07 Well Mode changed to Flowing
1986-08-30 Perforation Treatment Performed - Cement Squeeze
1986-08-30 Well Log Performed
1986-08-31 Perforation Treatment Performed - Jet Perforation
1986-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-28 Well Log Performed
1988-03-24 Well Fluid changed to Crude Oil
1988-03-24 Well Mode changed to Pumping
1989-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-01 Perforation Treatment Performed - Cement Squeeze
1989-09-01 Perforation Treatment Performed - Jet Perforation
1992-06-28 Well Log Performed
1992-06-30 Perforation Treatment Performed - Cement Squeeze
1992-07-03 Well Log Performed
1992-07-04 Perforation Treatment Performed - Jet Perforation
1992-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-01 Well Fluid changed to Crude Oil
1994-06-01 Well Mode changed to Suspended
1995-03-27 Well Log Performed
1995-04-08 Perforation Treatment Performed - Cement Squeeze
1995-04-11 Well Log Performed
1995-04-12 Perforation Treatment Performed - Jet Perforation
1995-04-12 Well Log Performed
1995-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-01 Well Began Injection
1995-05-01 Well Fluid changed to Water
1995-05-01 Well Type changed to Injection
2010-04-01 Well Fluid changed to Water
2010-04-01 Well Mode changed to Suspended
2010-04-01 Well Type changed to Injection
2010-11-01 Well Fluid changed to Water
2010-11-01 Well Type changed to Disposal
2013-01-10 Well Fluid changed to Water
2013-01-10 Well Mode changed to Closed
2013-01-10 Well Type changed to Disposal
2013-07-19 Well Fluid changed to Water
2013-07-19 Well Type changed to Disposal
2014-09-01 Well Fluid changed to Water
2014-09-01 Well Mode changed to Suspended
2014-09-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-03 Perforation 1530.00 1533.50 13
1992-06-30 Cement Squeeze 1507.00 1520.00 0
1992-07-04 Perforation 1521.00 1522.50 14
1992-07-04 Perforation 1523.50 1524.50 14
1992-07-04 Perforation 1525.00 1526.00 14
1992-07-04 Perforation 1527.80 1528.80 14
1992-07-05 Acid Treatment 1527.80 1528.80 0
1992-07-06 Acid Treatment 1521.00 1528.80 0
1995-04-08 Cement Squeeze 1521.00 1528.80 0
1995-04-12 Perforation 1616.00 1619.00 13
1995-04-13 Acid Treatment 1616.00 1619.00 0
1986-08-30 Cement Squeeze 1530.00 1533.50 0
1986-08-31 Perforation 1522.00 1528.00 13
1986-09-01 Acid Treatment 1522.00 1528.00 0
1989-03-04 Acid Treatment 1522.00 1528.00 0
1989-09-01 Cement Squeeze 1522.00 1528.00 0
1989-09-01 Perforation 1507.00 1509.00 13
1989-09-01 Perforation 1510.00 1513.00 13
1989-09-01 Perforation 1518.00 1520.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2493 0.0 0.0 0.0
1986 5101 0.0 0.0 0.0
1987 5845 0.0 0.0 0.0
1988 7053 0.0 0.0 0.0
1989 2606 0.0 0.0 0.0
1990 2945 0.0 0.0 0.0
1991 264 0.0 0.0 0.0
1992 3001 0.0 0.0 0.0
1993 5965 0.0 0.0 0.0
1994 408 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-18 Lost Circulation 1601.00 1601.00

For data sources see[6]

References