If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1146063604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.938339,"lon":-118.870407,"icon":""}]} |
Location: 02/04-36-114-06W6/0 | |
Location Alias: 02/04-36-14-06 W6M | |
Location Alias 2: 02/04-36-114-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 114 | |
Meridian: 6 | |
Range: 06 | |
Section: 36 | |
County/Municipality: Mackenzie County | |
Well Name: DEVON VIRGO 4-36-114-6 | |
Operator Name: Barnwell of Canada, Limited | |
License Number: 0124735 | |
License Date: 1986-12-02 | |
License Status: Suspension | |
Spud Date: 1986-12-17 | |
Final Drill Date: 1987-01-05 | |
Well Total Depth: 1555.00 m | |
Surface Hole Latitude: 58.938339 | |
Surface Hole Longitude: -118.870407 |
Date | Event |
---|---|
1986-12-02 | Obtained License |
1986-12-19 | Surface Casing Operation Performed |
1986-12-28 | Well Log Performed |
1986-12-29 | Intermediate Casing Operation Performed |
1987-01-01 | Well Log Performed |
1987-01-05 | Finished Drilling |
1987-01-05 | Well Log Performed |
1987-01-05 | Well Mode changed to Drilled and Cased |
1987-01-06 | Drill Stem Test Performed |
1987-01-07 | Drill Stem Test Performed |
1987-01-09 | Liner Casing Operation Performed |
1987-01-09 | Rig Released |
1987-01-17 | Perforation Treatment Performed - Jet Perforation |
1987-01-25 | Well Began Production |
1987-01-25 | Well Fluid changed to Crude Oil |
1987-01-25 | Well Mode changed to Flowing |
1987-03-27 | Well Log Performed |
1987-05-25 | Well Fluid changed to Crude Oil |
1987-05-25 | Well Mode changed to Pumping |
1987-05-29 | Perforation Treatment Performed - Jet Perforation |
1987-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-05-21 | Perforation Treatment Performed - Cement Squeeze |
1995-05-24 | Perforation Treatment Performed - Jet Perforation |
1995-05-24 | Well Log Performed |
1995-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-12-31 | Well Fluid changed to Crude Oil |
2008-12-31 | Well Mode changed to Suspended |
2014-02-01 | Well Fluid changed to Crude Oil |
2014-02-01 | Well Mode changed to Pumping |
2015-02-01 | Well Fluid changed to Crude Oil |
2015-02-01 | Well Mode changed to Suspended |
2016-02-01 | Well Fluid changed to Crude Oil |
2016-02-01 | Well Mode changed to Pumping |
2019-07-01 | Well Fluid changed to Crude Oil |
2019-07-01 | Well Mode changed to Suspended |
2020-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-09 | Plug Back Performed |
2020-01-09 | Well Fluid changed to Crude Oil |
2020-01-09 | Well Log Performed |
2020-01-09 | Well Mode changed to Abandoned Zone |
2020-01-10 | Perforation Treatment Performed - Jet Perforation |
2020-01-10 | Well Log Performed |
2020-01-25 | Perforation Treatment Performed - Jet Perforation |
2020-01-25 | Well Log Performed |
2020-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-02 | Perforation Treatment Performed - Cement Squeeze |
2020-03-02 | Plug Back Performed |
2020-03-03 | Perforation Treatment Performed - Jet Perforation |
2020-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-05 | Perforation Treatment Performed - Cement Squeeze |
2020-03-05 | Perforation Treatment Performed - Jet Perforation |
2020-03-05 | Plug Back Performed |
2020-03-06 | Perforation Treatment Performed - Jet Perforation |
2020-03-07 | Perforation Treatment Performed - Cement Squeeze |
2020-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-08 | Perforation Treatment Performed - Jet Perforation |
2020-03-08 | Plug Back Performed |
2020-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-09 | Perforation Treatment Performed - Cement Squeeze |
2020-03-09 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-01-17 | Perforation | 1477.50 | 1481.00 | 13 |
2020-01-09 | Packing Device Capped w/Cement | 1467.00 | 1475.00 | 0 |
2020-01-10 | Perforation | 1120.00 | 1122.00 | 20 |
2020-01-25 | Perforation | 1090.00 | 1092.00 | 20 |
2020-03-02 | Cement Squeeze | 1120.00 | 1122.00 | 0 |
2020-03-02 | Cement Squeeze | 1090.00 | 1092.00 | 0 |
2020-03-02 | Packing Device Capped w/Cement | 1043.00 | 1116.00 | 0 |
2020-03-03 | Perforation | 484.00 | 486.00 | 20 |
2020-03-05 | Cement Squeeze | 484.00 | 486.00 | 0 |
2020-03-05 | Packing Device Capped w/Cement | 466.00 | 480.00 | 0 |
2020-03-05 | Perforation | 254.00 | 256.00 | 20 |
1987-01-17 | Perforation | 1483.00 | 1487.00 | 13 |
2020-03-05 | Cement Squeeze | 254.00 | 256.00 | 0 |
2020-03-05 | Packing Device Capped w/Cement | 241.00 | 250.00 | 0 |
2020-03-06 | Perforation | 214.00 | 216.00 | 20 |
2020-03-07 | Cement Squeeze | 214.00 | 216.00 | 0 |
2020-03-08 | Perforation | 198.00 | 200.00 | 20 |
2020-03-08 | Packing Device Capped w/Cement | 202.00 | 210.00 | 0 |
2020-03-09 | Cement Squeeze | 198.00 | 200.00 | 0 |
2020-03-09 | Packing Device Capped w/Cement | 184.00 | 193.00 | 0 |
1987-01-17 | Perforation | 1488.50 | 1492.50 | 13 |
1987-05-29 | Perforation | 1477.50 | 1492.50 | 13 |
1987-05-30 | Acid Treatment | 1477.50 | 1492.50 | 0 |
1995-05-21 | Cement Squeeze | 1477.50 | 1492.50 | 0 |
1995-05-24 | Perforation | 1479.00 | 1481.00 | 13 |
1995-05-25 | Acid Treatment | 1479.00 | 1481.00 | 0 |
1999-12-16 | Acid Treatment | 1479.00 | 1481.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 6909 | 0.0 | 0.0 | 0.0 |
1988 | 7908 | 0.0 | 0.0 | 0.0 |
1989 | 8096 | 0.0 | 0.0 | 0.0 |
1990 | 8701 | 0.0 | 0.0 | 0.0 |
1991 | 8334 | 0.0 | 0.0 | 0.0 |
1992 | 8030 | 0.0 | 0.0 | 0.0 |
1993 | 7818 | 0.0 | 0.0 | 0.0 |
1994 | 8325 | 0.0 | 0.0 | 0.0 |
1995 | 8356 | 0.0 | 0.0 | 0.0 |
1996 | 8625 | 0.0 | 0.0 | 0.0 |
1997 | 8214 | 0.0 | 0.0 | 0.0 |
1998 | 6063 | 0.0 | 0.0 | 0.0 |
1999 | 8507 | 0.0 | 0.0 | 0.0 |
2000 | 8403 | 0.0 | 0.0 | 0.0 |
2001 | 8055 | 0.0 | 0.0 | 0.0 |
2002 | 3586 | 0.0 | 0.0 | 0.0 |
2014 | 1368 | 0.0 | 0.0 | 0.0 |
2015 | 607 | 0.0 | 0.0 | 0.0 |
2016 | 5596 | 0.0 | 0.0 | 0.0 |
2017 | 7351 | 0.0 | 0.0 | 0.0 |
2018 | 8029 | 0.0 | 0.0 | 0.0 |
2019 | 2435 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-03-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]