X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146063612003

Well Details

Well ID: 1146063612003
Loading map...
Location: 00/12-36-114-06W6/3
Location Alias: 00/12-36-14-06 W6M
Location Alias 2: 00/12-36-114-06 W6/03
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 36
County/Municipality: Mackenzie County
Well Name: ULSTER ET AL VIRGO 12-36-114-6
Operator Name: Barnwell of Canada, Limited
License Number: 0035789
License Date: 1969-02-11
License Status: Abandoned
Spud Date: 1969-02-14
Final Drill Date: 1969-03-05
Well Total Depth: 1536.20 m
Surface Hole Latitude: 58.945820
Surface Hole Longitude: -118.868473

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-11 Obtained License
1969-03-01 Liner Casing Operation Performed
1969-03-01 Well Log Performed
1969-03-05 Finished Drilling
1969-03-05 Well Mode changed to Drilled and Cased
1980-02-10 Perforation Treatment Performed - Jet Perforation
1980-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-13 Perforation Treatment Performed - Jet Perforation
1982-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-07 Perforation Treatment Performed - Jet Perforation
1996-04-07 Well Log Performed
1996-04-08 Well Log Performed
1996-04-16 Perforation Treatment Performed - Jet Perforation
1996-04-16 Perforation Treatment Performed - Remedial Casing
1996-04-16 Well Log Performed
1996-04-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
1996-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-26 Perforation Treatment Performed - Casing Patch (Over Perfs)
1996-04-26 Well Log Performed
1999-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-09 Plug Back Performed
2017-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-07 Perforation Treatment Performed - Jet Perforation
2017-03-07 Plug Back Performed
2017-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-09 Perforation Treatment Performed - Cement Squeeze
2017-03-09 Plug Back Performed
2017-03-10 Perforation Treatment Performed - Jet Perforation
2017-03-16 Perforation Treatment Performed - Cement Squeeze
2017-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-19 Perforation Treatment Performed - Jet Perforation
2017-03-19 Plug Back Performed
2017-03-19 Well Mode changed to Abandoned Zone
2017-03-22 Perforation Treatment Performed - Jet Perforation
2017-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-23 Perforation Treatment Performed - Cement Squeeze
2017-03-23 Plug Back Performed
2017-03-25 Perforation Treatment Performed - Cement Squeeze
2017-03-25 Perforation Treatment Performed - Jet Perforation
2017-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-26 Perforation Treatment Performed - Cement Squeeze
2017-03-26 Perforation Treatment Performed - Jet Perforation
2017-03-26 Plug Back Performed
2017-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-27 Plug Back Performed
2018-03-16 Perforation Treatment Performed - Cement Squeeze
2018-03-16 Perforation Treatment Performed - Jet Perforation
2018-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-17 Plug Back Performed
2018-03-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-10 Perforation 1499.60 1501.50 13
1996-04-23 Casing Patch 263.00 263.30 0
1996-04-24 Acid Treatment 1495.30 1501.50 0
1996-04-26 Casing Patch 167.00 167.30 0
1996-04-26 Casing Patch 235.00 235.30 0
1999-12-16 Acid Treatment 1495.30 1501.50 0
2015-03-09 Packing Device Capped w/Cement 1477.00 1485.00 0
2017-03-07 Perforation 667.00 669.00 17
2017-03-07 Packing Device Capped w/Cement 1312.00 1320.00 0
2017-03-09 Packing Device Capped w/Cement 654.00 662.00 0
2017-03-09 Cement Squeeze 667.00 669.00 0
1980-02-11 Acid Treatment 1499.60 1501.50 0
2017-03-10 Perforation 525.00 527.00 17
2017-03-16 Cement Squeeze 525.00 527.00 0
2017-03-19 Perforation 319.00 321.00 17
2017-03-19 Packing Device Capped w/Cement 511.00 519.00 0
2017-03-22 Perforation 266.00 268.00 17
2017-03-23 Packing Device Capped w/Cement 233.60 318.00 0
2017-03-23 Cement Squeeze 319.00 321.00 0
2017-03-25 Cement Squeeze 229.30 231.30 0
2017-03-25 Perforation 229.30 231.30 17
2017-03-26 Cement Squeeze 166.00 168.00 0
1982-11-13 Perforation 1495.30 1497.80 13
2017-03-26 Perforation 166.00 168.00 17
2017-03-26 Packing Device Capped w/Cement 220.00 228.00 0
2017-03-27 Packing Device Capped w/Cement 156.50 164.50 0
2018-03-16 Perforation 148.00 150.00 17
2018-03-16 Cement Squeeze 148.00 150.00 0
2018-03-17 Packing Device Capped w/Cement 138.00 146.00 0
1982-11-15 Acid Treatment 1495.30 1497.80 0
1982-11-16 Acid Treatment 1495.30 1501.30 0
1996-04-07 Perforation 263.00 263.30 72
1996-04-07 Perforation 235.00 235.30 72
1996-04-16 Perforation 167.00 167.30 72
1996-04-16 Remedial Casing Cementing 167.00 235.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-08 No Incident Encountered 0.00 0.00
2017-03-06 No Incident Encountered 0.00 0.00
2018-03-22 No Incident Encountered 0.00 0.00

For data sources see[5]

References