If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1156042511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.016546,"lon":-118.533082,"icon":""}]} |
Location: 00/11-25-115-04W6/0 | |
Location Alias: 00/11-25-15-04 W6M | |
Location Alias 2: 00/11-25-115-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 115 | |
Meridian: 6 | |
Range: 04 | |
Section: 25 | |
County/Municipality: Mackenzie County | |
Well Name: POLARIS ET AL LARNE 11-25-115-4 | |
Operator Name: Enerplus Corporation | |
License Number: 0100033 | |
License Date: 1983-01-04 | |
License Status: Re-Entered | |
Spud Date: 1983-01-06 | |
Final Drill Date: 1983-01-26 | |
Well Total Depth: 1479.00 m | |
Surface Hole Latitude: 59.016546 | |
Surface Hole Longitude: -118.533082 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-01-04 | Obtained License |
1983-01-19 | Drill Stem Test Performed |
1983-01-26 | Finished Drilling |
1983-01-26 | Well Mode changed to Drilled and Cased |
1983-01-27 | Drill Stem Test Performed |
1983-01-28 | Liner Casing Operation Performed |
1983-02-16 | Perforation Treatment Performed - Jet Perforation |
1983-02-21 | Perforation Treatment Performed - Jet Perforation |
1983-03-16 | Well Began Production |
1983-03-16 | Well Fluid changed to Crude Oil |
1983-03-16 | Well Mode changed to Pumping |
1984-02-16 | Perforation Treatment Performed - Cement Squeeze |
1984-02-16 | Plug Back Performed |
1984-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-05-01 | Well Fluid changed to Crude Oil |
1986-05-01 | Well Mode changed to Suspended |
1991-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-11-17 | Plug Back Performed |
1991-11-17 | Well Fluid changed to Crude Oil |
1991-11-17 | Well Mode changed to Abandoned and Re-entered |
1991-11-18 | Well Abandoned |
1995-01-11 | Well Log Performed |
1995-01-13 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-02-16 | Perforation | 1401.00 | 1402.00 | 7 |
1991-11-17 | Packing Device Capped w/Cement | 1388.00 | 1396.00 | 0 |
1983-02-16 | Perforation | 1406.00 | 1410.00 | 7 |
1983-02-16 | Perforation | 1411.00 | 1412.50 | 7 |
1983-02-16 | Perforation | 1416.00 | 1417.50 | 7 |
1983-02-21 | Perforation | 1288.00 | 1289.50 | 7 |
1983-02-21 | Perforation | 1290.00 | 1291.50 | 7 |
1983-02-21 | Perforation | 1292.50 | 1294.00 | 7 |
1984-02-16 | Cement Squeeze | 1288.00 | 1294.00 | 0 |
1984-02-24 | Acid Treatment | 1401.00 | 1417.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 6219 | 0.0 | 0.0 | 0.0 |
1984 | 6480 | 0.0 | 0.0 | 0.0 |
1985 | 5655 | 0.0 | 0.0 | 0.0 |
1986 | 2496 | 0.0 | 0.0 | 0.0 |
For data sources see[5]