X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156062214000

Well Details

Well ID: 1156062214000
Loading map...
Location: 00/14-22-115-06W6/0
Location Alias: 00/14-22-15-06 W6M
Location Alias 2: 00/14-22-115-06 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 22
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY 02 VIRGO 14-22-115-6
Operator Name: Cabot Energy Inc.
License Number: 0034112
License Date: 1968-05-15
License Status: Suspension
Spud Date: 1968-05-22
Final Drill Date: 1968-06-15
Well Total Depth: 1650.20 m
Surface Hole Latitude: 59.005819
Surface Hole Longitude: -118.931138

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-05-15 Obtained License
1968-06-04 Drill Stem Test Performed
1968-06-06 Well Log Performed
1968-06-07 Liner Casing Operation Performed
1968-06-11 Drill Stem Test Performed
1968-06-12 Drill Stem Test Performed
1968-06-15 Finished Drilling
1968-06-15 Well Log Performed
1968-06-15 Well Mode changed to Drilled and Cased
1968-06-16 Drill Stem Test Performed
1968-06-19 Perforation Treatment Performed - Open-Hole Completion
1968-07-03 Well Began Production
1968-07-03 Well Fluid changed to Crude Oil
1968-07-03 Well Mode changed to Flowing
1969-01-27 Well Fluid changed to Crude Oil
1969-01-27 Well Mode changed to Suspended
1970-05-01 Well Fluid changed to Crude Oil
1970-05-01 Well Mode changed to Pumping
1970-06-23 Perforation Treatment Performed - Cement Squeeze
1970-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-24 Perforation Treatment Performed - Acid Wash - No Pressure
1970-06-24 Perforation Treatment Performed - Jet Perforation
1979-11-01 Well Fluid changed to Crude Oil
1979-11-01 Well Mode changed to Pumping
1985-04-03 Well Log Performed
1987-09-15 Well Fluid changed to Crude Oil
1987-09-15 Well Mode changed to Suspended
1989-04-01 Well Fluid changed to Crude Oil
1989-04-01 Well Mode changed to Pumping
1989-06-02 Well Fluid changed to Crude Oil
1989-06-02 Well Mode changed to Suspended
1991-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-31 Perforation Treatment Performed - Jet Perforation
1991-10-31 Plug Back Performed
1991-10-31 Well Fluid changed to Crude Oil
1991-10-31 Well Mode changed to Abandoned Zone
1997-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-31 Well Log Performed
1997-11-01 Perforation Treatment Performed - Jet Perforation
1997-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-03 Perforation Treatment Performed - Cement Squeeze
2014-03-03 Plug Back Performed
2014-03-07 Perforation Treatment Performed - Jet Perforation
2014-03-09 Perforation Treatment Performed - Cement Squeeze
2014-03-09 Plug Back Performed
2014-03-15 Perforation Treatment Performed - Jet Perforation
2014-03-19 Perforation Treatment Performed - Cement Squeeze
2014-03-19 Perforation Treatment Performed - Jet Perforation
2014-03-19 Plug Back Performed
2014-04-01 Well Fluid changed to Crude Oil
2014-04-01 Well Mode changed to Pumping
2018-01-31 Well Fluid changed to Crude Oil
2018-01-31 Well Mode changed to Suspended
2019-12-23 Well Fluid changed to Crude Oil
2019-12-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-06-19 Open Hole/Barefoot Completion 1577.60 1606.30 0
1970-06-24 Acid Treatment 1577.60 1584.40 0
1970-06-24 Acid Wash 1577.60 1584.40 0
1970-06-24 Acid Treatment 1577.60 1584.40 0
1991-10-31 Packing Device Capped w/Cement 1507.00 1515.00 0
1991-10-31 Perforation 1396.60 1399.00 13
1991-10-31 Perforation 1402.10 1405.70 13
1997-10-31 Packing Device Capped w/Cement 1378.00 1386.00 0
1997-11-01 Perforation 1303.90 1306.40 13
1997-11-01 Perforation 1311.80 1315.50 13
1997-11-02 Acid Treatment 1303.90 1306.40 0
1968-06-19 Open Hole/Barefoot Completion 1523.40 1560.30 0
1997-11-02 Acid Treatment 1311.80 1315.50 0
2014-03-03 Cement Squeeze 1303.90 1315.50 0
2014-03-07 Perforation 1396.60 1405.70 13
2014-03-09 Cement Squeeze 1396.60 1405.70 0
2014-03-15 Perforation 1522.80 1531.30 7
2014-03-19 Cement Squeeze 1522.80 1531.30 0
2014-03-19 Perforation 1582.20 1584.40 7
2014-03-19 Perforation 1577.60 1581.00 7
1970-06-23 Cement Squeeze 1523.40 1606.30 7
1970-06-24 Perforation 1582.20 1584.40 7
1970-06-24 Perforation 1577.60 1581.00 7
1970-06-24 Perforation 1527.00 1531.30 7
1970-06-24 Perforation 1522.80 1524.60 7
1970-06-24 Acid Treatment 1522.80 1531.30 0
1970-06-24 Acid Wash 1577.60 1584.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 2185 0.0 0.0 0.0
1969 2385 0.0 0.0 0.0
1970 1140 0.0 0.0 0.0
1971 1706 0.0 0.0 0.0
1972 2394 0.0 0.0 0.0
1973 5779 0.0 0.0 0.0
1974 4916 0.0 0.0 0.0
1975 3830 0.0 0.0 0.0
1976 3750 0.0 0.0 0.0
1977 4284 0.0 0.0 0.0
1978 3795 0.0 0.0 0.0
1979 6581 0.0 0.0 0.0
1980 8031 0.0 0.0 0.0
1981 7074 0.0 0.0 0.0
1982 6849 0.0 0.0 0.0
1983 7836 0.0 0.0 0.0
1984 7233 0.0 0.0 0.0
1985 4390 0.0 0.0 0.0
1986 708 0.0 0.0 0.0
1989 546 0.0 0.0 0.0
2014 2833 0.0 0.0 0.0
2015 496 0.0 0.0 0.0
2018 24 0.0 0.0 0.0
2019 216 0.0 0.0 0.0
2020 1629 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-30 No Incident Encountered 0.00 0.00
2014-03-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References