X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166030712000

Well Details

Well ID: 1166030712000
Loading map...
Location: 00/12-07-116-03W6/0
Location Alias: 00/12-07-16-03 W6M
Location Alias 2: 00/12-07-116-03 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 03
Section: 07
County/Municipality: Mackenzie County
Well Name: PPRL LARNE 12-7-116-3
Operator Name: Phillips Petroleum Resources, Ltd.
License Number: 0035953
License Date: 1969-03-05
License Status: Re-Entered
Spud Date: 1969-03-16
Final Drill Date: 1969-04-13
Well Total Depth: 1453.90 m
Surface Hole Latitude: 59.060629
Surface Hole Longitude: -118.506338

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-05 Obtained License
1969-04-08 Drill Stem Test Performed
1969-04-10 Production Casing Operation Performed
1969-04-13 Finished Drilling
1969-04-13 Perforation Treatment Performed - Open-Hole Completion
1969-04-13 Well Log Performed
1969-04-13 Well Mode changed to Drilled and Cased
1969-06-25 Perforation Treatment Performed - Acid Wash - No Pressure
1969-06-27 Well Began Production
1969-06-27 Well Fluid changed to Crude Oil
1969-06-27 Well Mode changed to Flowing
1974-06-05 Well Fluid changed to Crude Oil
1974-06-05 Well Mode changed to Pumping
1979-09-01 Well Fluid changed to Crude Oil
1979-09-01 Well Mode changed to Suspended
1987-11-10 Well Fluid changed to Crude Oil
1987-11-10 Well Mode changed to Pumping
1990-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-20 Plug Back Performed
1993-06-20 Well Fluid changed to Crude Oil
1993-06-20 Well Log Performed
1993-06-20 Well Mode changed to Abandoned and Re-entered
1993-06-24 Perforation Treatment Performed - Jet Perforation
1993-06-25 Perforation Treatment Performed - Remedial Casing
1993-07-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-04-13 Open Hole/Barefoot Completion 1368.60 1453.90 0
1969-06-25 Acid Wash 1368.60 1453.90 0
1990-03-30 Acid Treatment 1368.60 1453.90 0
1993-06-20 Packing Device Capped w/Cement 1341.00 1349.00 0
1993-06-24 Perforation 250.00 250.30 72
1993-06-25 Remedial Casing Cementing 250.00 250.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3122 0.0 0.0 0.0
1970 4021 0.0 0.0 0.0
1971 1870 0.0 0.0 0.0
1972 2688 0.0 0.0 0.0
1973 8219 0.0 0.0 0.0
1974 4003 0.0 0.0 0.0
1975 4174 0.0 0.0 0.0
1976 6024 0.0 0.0 0.0
1977 7667 0.0 0.0 0.0
1978 3863 0.0 0.0 0.0
1987 1464 0.0 0.0 0.0
1988 6702 0.0 0.0 0.0
1989 7475 0.0 0.0 0.0
1990 1854 0.0 0.0 0.0

For data sources see[5]

References