X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166050616000

Well Details

Well ID: 1166050616000
Loading map...
Location: 00/16-06-116-05W6/0
Location Alias: 00/16-06-16-05 W6M
Location Alias 2: 00/16-06-116-05 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 06
County/Municipality: Mackenzie County
Well Name: AMOCO ZAMA 16-6-116-5
Operator Name: BP Canada Energy Group ULC
License Number: 0036144
License Date: 1969-05-02
License Status: RecCertified
Spud Date: 1969-05-29
Final Drill Date: 1969-06-16
Well Total Depth: 1561.20 m
Surface Hole Latitude: 59.049888
Surface Hole Longitude: -118.831924

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-02 Obtained License
1969-06-09 Drill Stem Test Performed
1969-06-12 Production Casing Operation Performed
1969-06-16 Finished Drilling
1969-06-16 Well Mode changed to Drilled and Cased
1969-06-17 Perforation Treatment Performed - Open-Hole Completion
1969-06-19 Well Began Production
1969-06-19 Well Fluid changed to Crude Oil
1969-06-19 Well Mode changed to Flowing
1969-07-07 Well Fluid changed to Crude Oil
1969-07-07 Well Mode changed to Pumping
1972-05-01 Well Fluid changed to Crude Oil
1972-05-01 Well Mode changed to Suspended
1976-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-05-17 Perforation Treatment Performed - Jet Perforation
1976-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-18 Well Fluid changed to Crude Oil
1976-05-18 Well Mode changed to Abandoned Zone
1977-05-18 Well Log Performed
1977-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-06-17 Open Hole/Barefoot Completion 1449.60 1503.30 0
1976-05-17 Packing Device Capped w/Cement 1431.00 1438.70 0
1976-05-17 Perforation 1375.60 1377.10 7
1976-05-17 Perforation 1385.30 1387.40 7
1976-05-17 Perforation 1406.30 1413.70 7
1976-05-18 Acid Treatment 1375.60 1413.70 0
1977-06-27 Acid Treatment 1375.60 1377.10 0
1978-10-01 Packing Device Capped w/Cement 1352.40 1360.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3133 0.0 0.0 0.0
1970 8354 0.0 0.0 0.0
1971 5099 0.0 0.0 0.0

For data sources see[5]

References