If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166062010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.091599,"lon":-118.970245,"icon":""}]} |
| Location: 00/10-20-116-06W6/0 | |
| Location Alias: 00/10-20-16-06 W6M | |
| Location Alias 2: 00/10-20-116-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 20 | |
| County/Municipality: Mackenzie County | |
| Well Name: TOURNEX ZAMA 10-20-116-6 | |
| Operator Name: Raimount Energy Corp. | |
| License Number: 0143007 | |
| License Date: 1990-01-29 | |
| License Status: Suspension | |
| Spud Date: 1990-03-07 | |
| Final Drill Date: 1990-03-27 | |
| Well Total Depth: 1775.00 m | |
| Surface Hole Latitude: 59.091599 | |
| Surface Hole Longitude: -118.970245 |
| Date | Event |
|---|---|
| 1990-01-29 | Obtained License |
| 1990-03-08 | Surface Casing Operation Performed |
| 1990-03-12 | Lost Circulation Occurred |
| 1990-03-13 | Direction Drilling Operation Performed - Deviate |
| 1990-03-20 | Well Log Performed |
| 1990-03-21 | Production Casing Operation Performed |
| 1990-03-27 | Finished Drilling |
| 1990-03-27 | Perforation Treatment Performed - Open-Hole Completion |
| 1990-03-27 | Well Log Performed |
| 1990-03-28 | Well Log Performed |
| 1990-03-30 | Rig Released |
| 1990-04-07 | Well Mode changed to Drilled and Cased |
| 1990-05-02 | Well Log Performed |
| 1991-01-20 | Well Log Performed |
| 1991-02-15 | Well Log Performed |
| 1991-02-24 | Well Log Performed |
| 1991-03-04 | Well Log Performed |
| 1991-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-03-07 | Perforation Treatment Performed - Open-Hole Completion |
| 1991-03-23 | Well Log Performed |
| 1991-03-24 | Perforation Treatment Performed - Jet Perforation |
| 1991-03-30 | Well Log Performed |
| 1991-03-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-01-20 | Well Log Performed |
| 1994-12-14 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-12-15 | Liner Casing Operation Performed |
| 1994-12-15 | Perforation Treatment Performed - Cement Squeeze |
| 1994-12-16 | Well Log Performed |
| 1994-12-17 | Well Log Performed |
| 1994-12-18 | Perforation Treatment Performed - Jet Perforation |
| 1994-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-01-08 | Well Began Production |
| 1995-01-08 | Well Fluid changed to Crude Oil |
| 1995-01-08 | Well Mode changed to Pumping |
| 1996-12-17 | Well Log Performed |
| 1998-04-06 | Perforation Treatment Performed - Jet Perforation |
| 1998-04-06 | Well Log Performed |
| 1998-04-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-04-11 | Well Log Performed |
| 2001-07-24 | Well Log Performed |
| 2001-07-25 | Perforation Treatment Performed - Jet Perforation |
| 2001-07-25 | Well Log Performed |
| 2001-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-08-02 | Well Log Performed |
| 2001-08-03 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-31 | Well Fluid changed to Crude Oil |
| 2005-08-31 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1990-03-13 | 929.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-03-27 | Open Hole/Barefoot Completion | 1499.00 | 1775.00 | 0 |
| 1998-04-06 | Perforation | 1590.50 | 1593.00 | 13 |
| 1998-04-07 | Acid Treatment | 1590.50 | 1593.00 | 0 |
| 2001-07-25 | Perforation | 1574.00 | 1577.00 | 14 |
| 2001-07-26 | Acid Treatment | 1574.00 | 1577.00 | 0 |
| 2001-08-03 | Perforation | 1590.50 | 1593.00 | 14 |
| 1991-03-07 | Packing Device Capped w/Cement | 1594.00 | 1614.00 | 0 |
| 1991-03-07 | Open Hole/Barefoot Completion | 1499.00 | 1595.00 | 0 |
| 1991-03-24 | Perforation | 1591.40 | 1591.80 | 13 |
| 1991-03-31 | Packing Device Capped w/Cement | 1470.00 | 1490.00 | 0 |
| 1994-12-14 | Open Hole/Barefoot Completion | 1499.00 | 1616.80 | 0 |
| 1994-12-15 | Cement Squeeze | 1499.00 | 1616.80 | 0 |
| 1994-12-18 | Perforation | 1597.00 | 1599.00 | 13 |
| 1994-12-23 | Acid Treatment | 1597.00 | 1599.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 8027 | 0.0 | 0.0 | 0.0 |
| 1996 | 8412 | 0.0 | 0.0 | 0.0 |
| 1997 | 6323 | 0.0 | 0.0 | 0.0 |
| 1998 | 6263 | 0.0 | 0.0 | 0.0 |
| 1999 | 4049 | 0.0 | 0.0 | 0.0 |
| 2000 | 4444 | 0.0 | 0.0 | 0.0 |
| 2001 | 4725 | 0.0 | 0.0 | 0.0 |
| 2002 | 5892 | 0.0 | 0.0 | 0.0 |
| 2003 | 3785 | 0.0 | 0.0 | 0.0 |
| 2004 | 432 | 0.0 | 0.0 | 0.0 |
| 2005 | 1956 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1990-03-12 | Lost Circulation | 702.00 | 702.00 |
For data sources see[7]