X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166063311002

Well Details

Well ID: 1166063311002
Loading map...
Location: 00/11-33-116-06W6/2
Location Alias: 00/11-33-16-06 W6M
Location Alias 2: 00/11-33-116-06 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 33
County/Municipality: Mackenzie County
Well Name: CABOT ENERGY ZAMA 11-33-116-6
Operator Name: Cabot Energy Inc.
License Number: 0139801
License Date: 1989-05-15
License Status: Suspension
Spud Date: 1989-06-05
Final Drill Date: 1989-06-16
Well Total Depth: 1620.00 m
Surface Hole Latitude: 59.119354
Surface Hole Longitude: -118.960208

For data sources see[1][2]

Well History

Date Event
1989-05-15 Obtained License
1989-06-06 Surface Casing Operation Performed
1989-06-12 Well Log Performed
1989-06-13 Intermediate Casing Operation Performed
1989-06-15 Lost Circulation Occurred
1989-06-16 Finished Drilling
1989-06-16 Well Log Performed
1989-06-16 Well Mode changed to Drilled and Cased
1989-06-18 Liner Casing Operation Performed
1989-06-18 Rig Released
1989-07-01 Well Log Performed
1989-07-02 Perforation Treatment Performed - Jet Perforation
1989-07-05 Perforation Treatment Performed - Jet Perforation
1989-07-05 Well Log Performed
1989-07-06 Perforation Treatment Performed - Jet Perforation
1989-07-07 Perforation Treatment Performed - Cement Squeeze
1989-07-07 Perforation Treatment Performed - Jet Perforation
1989-07-07 Well Log Performed
1995-09-09 Perforation Treatment Performed - Jet Perforation
2002-03-24 Well Log Performed
2002-03-25 Perforation Treatment Performed - Cement Squeeze
2002-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-27 Perforation Treatment Performed - Jet Perforation
2002-03-27 Well Log Performed
2002-09-21 Well Began Production
2002-09-21 Well Fluid changed to Crude Oil
2002-09-21 Well Mode changed to Flowing
2012-01-20 Well Log Performed
2012-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-24 Plug Back Performed
2012-01-24 Well Fluid changed to Crude Oil
2012-01-24 Well Log Performed
2012-01-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-02 Perforation 1570.00 1571.00 13
2002-03-27 Perforation 1535.00 1540.00 13
2002-03-27 Acid Treatment 1527.00 1530.00 0
2002-03-27 Acid Treatment 1535.00 1540.00 0
2012-01-24 Packing Device Capped w/Cement 1512.00 1520.00 0
2012-01-24 Packing Device Capped w/Cement 1407.00 1415.00 0
1989-07-02 Perforation 1573.00 1575.00 13
1989-07-05 Perforation 1578.00 1579.00 13
1989-07-06 Perforation 1585.50 1586.50 13
1989-07-07 Perforation 1585.50 1587.00 13
1989-07-07 Cement Squeeze 1570.00 1579.00 0
1995-09-09 Perforation 1550.00 1552.00 13
2002-03-25 Cement Squeeze 1550.00 1552.00 0
2002-03-27 Perforation 1527.00 1530.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2099 0.0 0.0 0.0
2003 7141 0.0 0.0 0.0
2004 8695 0.0 0.0 0.0
2005 8163 0.0 0.0 0.0
2006 6965 0.0 0.0 0.0
2007 5105 0.0 0.0 0.0
2008 4391 0.0 0.0 0.0
2009 1338 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-06-15 Lost Circulation 1576.00 1620.00

For data sources see[6]

References