X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166103105000

Well Details

Well ID: 1166103105000
Loading map...
Location: 00/05-31-116-10W6/0
Location Alias: 00/05-31-16-10 W6M
Location Alias 2: 00/05-31-116-10 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 10
Section: 31
County/Municipality: Mackenzie County
Well Name: RIDGEBACK TOOGA 5-31-116-10
Operator Name: Ridgeback Resources Inc.
License Number: 0101021
License Date: 1983-03-16
License Status: Abandoned
Spud Date: 1983-03-19
Final Drill Date: 1983-04-08
Well Total Depth: 1940.00 m
Surface Hole Latitude: 59.117660
Surface Hole Longitude: -119.704299

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-16 Obtained License
1983-04-08 Finished Drilling
1983-04-08 Well Log Performed
1983-04-09 Drill Stem Test Performed
1983-04-09 Well Log Performed
1983-04-11 Production Casing Operation Performed
1983-04-11 Well Mode changed to Drilled and Cased
1984-02-23 Perforation Treatment Performed - Jet Perforation
1984-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-26 Perforation Treatment Performed - Cement Squeeze
1984-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-28 Perforation Treatment Performed - Jet Perforation
1984-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-06 Perforation Treatment Performed - Jet Perforation
1984-03-08 Perforation Treatment Performed - Jet Perforation
1984-03-08 Well Log Performed
1984-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-24 Perforation Treatment Performed - Cement Squeeze
2002-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-28 Perforation Treatment Performed - Cement Squeeze
2002-01-28 Plug Back Performed
2002-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-29 Perforation Treatment Performed - Cement Squeeze
2002-01-29 Perforation Treatment Performed - Jet Perforation
2002-01-29 Perforation Treatment Performed - Remedial Casing
2002-01-29 Plug Back Performed
2002-01-29 Well Mode changed to Abandoned Zone
2002-02-03 Well Abandoned
2002-02-03 Well Mode changed to Abandoned
2013-01-23 Well Log Performed
2013-01-24 Well Log Performed
2013-02-01 Perforation Treatment Performed - Jet Perforation
2013-02-03 Perforation Treatment Performed - Remedial Casing
2013-02-10 Perforation Treatment Performed - Jet Perforation
2013-02-10 Well Log Performed
2013-02-11 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2013-02-13 Perforation Treatment Performed - Remedial Casing
2013-02-20 Perforation Treatment Performed - Jet Perforation
2013-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-21 Well Log Performed
2013-02-22 Perforation Treatment Performed - Remedial Casing
2013-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-26 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-23 Perforation 1776.50 1778.50 6
1984-03-06 Acid Treatment 1756.50 1759.50 0
1984-03-08 Perforation 1768.00 1773.00 7
1984-03-09 Acid Treatment 1768.00 1773.00 0
2002-01-24 Cement Squeeze 888.00 933.00 0
2002-01-28 Cement Squeeze 1739.50 1741.50 0
2002-01-28 Cement Squeeze 1715.00 1716.60 0
2002-01-28 Cement Squeeze 1709.00 1710.20 0
2002-01-28 Packing Device Capped w/Cement 1750.00 1752.00 0
2002-01-29 Cement Squeeze 1739.50 1741.50 0
2002-01-29 Perforation 425.00 425.60 80
1984-02-24 Acid Treatment 1776.50 1778.50 0
2002-01-29 Remedial Casing Cementing 425.00 425.60 0
2002-01-29 Packing Device Capped w/Cement 1621.00 1705.00 0
2013-02-01 Perforation 343.00 345.00 17
2013-02-03 Remedial Casing Cementing 343.00 345.00 0
2013-02-10 Perforation 452.50 454.50 17
2013-02-11 Packing Dev Cpd w/Res-Gyp Cem 437.00 445.00 0
2013-02-13 Remedial Casing Cementing 452.50 454.50 0
2013-02-20 Perforation 72.00 75.00 17
2013-02-21 Acid Treatment 72.00 75.00 0
2013-02-22 Remedial Casing Cementing 72.00 75.00 0
1984-02-26 Cement Squeeze 1776.50 1778.50 0
2013-02-26 Packing Device Capped w/Cement 61.00 69.00 0
1984-02-27 Packing Device Capped w/Cement 1773.00 1775.00 0
1984-02-28 Perforation 1750.20 1752.00 7
1984-02-28 Perforation 1739.50 1741.00 7
1984-02-28 Perforation 1715.00 1716.50 7
1984-02-29 Acid Treatment 1739.50 1741.00 0
1984-03-06 Perforation 1756.50 1759.50 7

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-07 No Incident Encountered 0.00 0.00

For data sources see[5]

References