X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206092814000

Well Details

Well ID: 1206092814000
Loading map...
Location: 00/14-28-120-09W6/0
Location Alias: 00/14-28-20-09 W6M
Location Alias 2: 00/14-28-120-09 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 09
Section: 28
County/Municipality: Mackenzie County
Well Name: PEMBINA ET AL SHEKILIE 14-28-120-9
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0100164
License Date: 1983-01-13
License Status: RecCertified
Spud Date: 1983-01-18
Final Drill Date: 1983-02-07
Well Total Depth: 2100.00 m
Surface Hole Latitude: 59.458278
Surface Hole Longitude: -119.486528

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-13 Obtained License
1983-01-18 Lost Circulation Occurred
1983-01-19 Lost Circulation Occurred
1983-02-07 Finished Drilling
1983-02-11 Drill Stem Test Performed
1983-02-13 Drill Stem Test Performed
1983-02-15 Production Casing Operation Performed
1983-02-16 Well Mode changed to Drilled and Cased
1983-03-05 Perforation Treatment Performed - Jet Perforation
1983-03-10 Perforation Treatment Performed - Jet Perforation
1983-03-11 Perforation Treatment Performed - Cement Squeeze
1983-03-14 Perforation Treatment Performed - Cement Squeeze
1983-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-15 Perforation Treatment Performed - Cement Squeeze
1983-03-15 Perforation Treatment Performed - Jet Perforation
1983-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-16 Perforation Treatment Performed - Jet Perforation
1983-03-17 Perforation Treatment Performed - Cement Squeeze
1983-03-20 Perforation Treatment Performed - Jet Perforation
1983-03-21 Perforation Treatment Performed - Jet Perforation
1983-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-04 Plug Back Performed
1989-03-04 Well Mode changed to Abandoned
1989-03-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-05 Perforation 1831.00 1833.50 13
1983-03-15 Cement Squeeze 1828.00 1830.00 0
1983-03-16 Perforation 1779.00 1781.00 7
1983-03-16 Acid Treatment 1779.00 1792.00 0
1983-03-17 Cement Squeeze 1779.00 1792.00 0
1983-03-20 Perforation 1832.00 1833.50 13
1983-03-20 Perforation 1835.50 1839.00 13
1983-03-21 Perforation 1841.00 1845.00 13
1983-03-22 Acid Treatment 1832.00 1845.00 0
1989-03-04 Packing Device Capped w/Cement 1818.00 1825.00 0
1983-03-05 Perforation 1835.50 1839.00 13
1983-03-05 Perforation 1841.00 1843.00 13
1983-03-10 Perforation 1948.00 1950.00 13
1983-03-11 Cement Squeeze 1831.00 1843.00 0
1983-03-14 Cement Squeeze 1948.00 1950.00 0
1983-03-15 Perforation 1790.00 1792.00 7
1983-03-15 Perforation 1828.00 1830.00 7
1983-03-15 Acid Treatment 1828.00 1830.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-01-18 Lost Circulation 5.00 36.00
1983-01-19 Lost Circulation 245.00 271.00

For data sources see[5]

References