X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1215233602002

Well Details

Well ID: 1215233602002
Loading map...
Location: 00/02-36-121-23W5/2
Location Alias: 00/02-36-21-23 W5M
Location Alias 2: 00/02-36-121-23 W5/02
Country: Canada
Province: Alberta
Township: 121
Meridian: 5
Range: 23
Section: 36
County/Municipality: Mackenzie County
Well Name: STRATEGIC MARLOWE 2-36-121-23
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0247547
License Date: 2000-12-19
License Status: Suspension
Spud Date: 2001-01-29
Final Drill Date: 2001-02-07
Well Total Depth: 1395.00 m
Surface Hole Latitude: 59.547945
Surface Hole Longitude: -117.810712

For data sources see[1][2]

Well History

Date Event
2000-12-19 Obtained License
2001-01-30 Surface Casing Operation Performed
2001-02-07 Finished Drilling
2001-02-07 Well Mode changed to Drilled and Cased
2001-02-10 Well Log Performed
2001-02-11 Production Casing Operation Performed
2001-02-12 Rig Released
2001-02-16 Perforation Treatment Performed - Jet Perforation
2001-02-16 Well Log Performed
2001-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-19 Perforation Treatment Performed - Jet Perforation
2001-02-19 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2001-02-19 Plug Back Performed
2001-02-19 Well Log Performed
2001-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-25 Perforation Treatment Performed - Jet Perforation
2001-02-25 Plug Back Performed
2001-02-25 Well Log Performed
2001-02-25 Well Mode changed to Abandoned Zone
2001-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-28 Perforation Treatment Performed - Jet Perforation
2001-02-28 Plug Back Performed
2001-02-28 Well Log Performed
2001-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-01-27 Perforation Treatment Performed - Jet Perforation
2013-01-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-02-16 Perforation 1366.00 1368.00 17
2001-02-25 Packing Device Capped w/Cement 1302.00 1310.20 0
2001-02-25 Perforation 1200.00 1206.00 17
2001-02-26 Acid Treatment 1200.00 1206.00 0
2001-02-28 Packing Device Capped w/Cement 1185.00 1193.00 0
2001-02-28 Perforation 1123.50 1127.50 17
2001-02-28 Perforation 1121.00 1123.50 17
2001-03-01 Acid Treatment 1121.00 1127.50 0
2013-01-27 Perforation 1155.00 1160.00 17
2013-01-30 Fracture 1155.00 1160.00 0
2001-02-16 Perforation 1363.00 1364.00 17
2001-02-16 Perforation 1356.00 1360.50 17
2001-02-17 Acid Treatment 1356.00 1368.00 0
2001-02-19 Packing Dev Cpd w/Res-Gyp Cem 1342.00 1350.00 0
2001-02-19 Perforation 1328.00 1329.00 17
2001-02-19 Perforation 1313.00 1315.00 17
2001-02-23 Acid Treatment 1328.00 1329.00 0
2001-02-23 Acid Treatment 1313.00 1315.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-02-19 No Incident Encountered 0.00 0.00
2013-02-20 No Incident Encountered 0.00 0.00

For data sources see[5]

References