X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225212210002

Well Details

Well ID: 1225212210002
Loading map...
Location: 00/10-22-122-21W5/2
Location Alias: 00/10-22-22-21 W5M
Location Alias 2: 00/10-22-122-21 W5/02
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 21
Section: 22
County/Municipality: Mackenzie County
Well Name: STRATEGIC MARLOWE 10-22-122-21
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0265665
License Date: 2002-01-08
License Status: Issued
Spud Date: 2002-01-26
Final Drill Date: 2002-02-04
Well Total Depth: 1155.00 m
Surface Hole Latitude: 59.612469
Surface Hole Longitude: -117.520869

For data sources see[1][2]

Well History

Date Event
2002-01-08 Obtained License
2002-01-27 Surface Casing Operation Performed
2002-02-04 Finished Drilling
2002-02-04 Well Mode changed to Drilled and Cased
2002-02-05 Well Log Performed
2002-02-06 Drill Stem Test Performed
2002-02-07 Production Casing Operation Performed
2002-02-07 Rig Released
2002-02-12 Perforation Treatment Performed - Jet Perforation
2002-02-12 Well Log Performed
2002-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-15 Plug Back Performed
2002-02-15 Well Log Performed
2002-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-16 Perforation Treatment Performed - Jet Perforation
2002-02-16 Well Log Performed
2002-02-18 Perforation Treatment Performed - Jet Perforation
2002-02-18 Well Log Performed
2002-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-21 Perforation Treatment Performed - Jet Perforation
2002-02-21 Plug Back Performed
2002-02-21 Well Log Performed
2002-02-21 Well Mode changed to Abandoned Zone
2002-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-25 Perforation Treatment Performed - Cement Squeeze
2006-03-25 Plug Back Performed
2006-03-29 Perforation Treatment Performed - Jet Perforation
2006-03-30 Perforation Treatment Performed - Cement Squeeze
2006-03-30 Plug Back Performed
2007-10-30 Perforation Treatment Performed - Jet Perforation
2007-10-31 Perforation Treatment Performed - Jet Perforation
2007-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-12 Perforation 1048.50 1052.50 17
2002-02-23 Acid Treatment 828.00 832.00 0
2006-03-25 Cement Squeeze 828.00 832.00 0
2006-03-29 Perforation 894.00 898.00 17
2006-03-29 Perforation 902.50 907.00 17
2006-03-30 Cement Squeeze 894.00 907.00 0
2007-10-30 Perforation 1048.50 1058.50 17
2007-10-31 Perforation 1054.50 1058.50 17
2007-11-01 Acid Treatment 1048.50 1058.50 0
2002-02-13 Acid Treatment 1048.50 1052.50 0
2002-02-15 Packing Device Capped w/Cement 1037.00 1045.00 0
2002-02-16 Perforation 894.00 898.00 17
2002-02-16 Acid Treatment 894.00 898.00 0
2002-02-18 Perforation 902.50 907.00 17
2002-02-19 Acid Treatment 902.50 907.00 0
2002-02-21 Packing Device Capped w/Cement 884.00 892.00 0
2002-02-21 Perforation 828.00 832.00 17

For data sources see[4]



References