X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225221805000

Well Details

Well ID: 1225221805000
Loading map...
Location: 00/05-18-122-22W5/0
Location Alias: 00/05-18-22-22 W5M
Location Alias 2: 00/05-18-122-22 W5/00
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 22
Section: 18
County/Municipality: Mackenzie County
Well Name: CARIBOU MARLOWE 5-18-122-22
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0219999
License Date: 1998-12-17
License Status: Issued
Spud Date: 1999-01-16
Final Drill Date: 1999-02-01
Well Total Depth: 1470.00 m
Surface Hole Latitude: 59.595561
Surface Hole Longitude: -117.792297

For data sources see[1][2]

Well History

Date Event
1998-12-17 Obtained License
1999-01-18 Surface Casing Operation Performed
1999-01-31 Well Log Performed
1999-02-01 Finished Drilling
1999-02-02 Drill Stem Test Performed
1999-02-02 Well Log Performed
1999-02-04 Plug Back Performed
1999-02-04 Production Casing Operation Performed
1999-02-05 Rig Released
1999-02-05 Well Mode changed to Drilled and Cased
1999-02-08 Perforation Treatment Performed - Jet Perforation
1999-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-09 Well Began Production
1999-02-09 Well Fluid changed to Crude Oil
1999-02-09 Well Log Performed
1999-02-09 Well Mode changed to Flowing
1999-03-04 Well Fluid changed to Crude Oil
1999-03-04 Well Mode changed to Suspended
2000-02-28 Perforation Treatment Performed - Jet Perforation
2000-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-02 Well Fluid changed to Crude Oil
2000-03-02 Well Mode changed to Pumping
2000-03-04 Perforation Treatment Performed - Jet Perforation
2000-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-08 Perforation Treatment Performed - Jet Perforation
2000-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-01 Well Fluid changed to Crude Oil
2000-04-01 Well Mode changed to Suspended
2001-01-09 Perforation Treatment Performed - Cement Squeeze
2001-01-27 Well Fluid changed to Crude Oil
2001-01-27 Well Mode changed to Pumping
2020-04-17 Well Fluid changed to Crude Oil
2020-04-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-08 Perforation 1442.00 1445.00 20
2000-03-09 Acid Treatment 1208.00 1214.00 0
2001-01-09 Cement Squeeze 1208.00 1214.00 0
1999-02-09 Acid Treatment 1442.00 1445.00 0
2000-02-28 Perforation 1418.00 1421.50 17
2000-02-28 Perforation 1426.50 1427.50 17
2000-03-02 Acid Treatment 1418.00 1421.50 0
2000-03-02 Acid Treatment 1426.50 1427.50 0
2000-03-04 Perforation 1268.50 1271.00 17
2000-03-05 Acid Treatment 1268.50 1271.00 0
2000-03-08 Perforation 1208.00 1214.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 552 0.0 0.0 0.0
2000 24 0.0 0.0 0.0
2001 1219 0.0 0.0 0.0
2002 7801 0.0 0.0 0.0
2003 7706 0.0 0.0 0.0
2004 7865 0.0 0.0 0.0
2005 8459 0.0 0.0 0.0
2006 5675 0.0 0.0 0.0
2007 6334 0.0 0.0 0.0
2008 3801 0.0 0.0 0.0
2009 7744 0.0 0.0 0.0
2010 6980 0.0 0.0 0.0
2011 4743 0.0 0.0 0.0
2012 6549 0.0 0.0 0.0
2013 5708 0.0 0.0 0.0
2014 8504 0.0 0.0 0.0
2015 8612 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8477 0.0 0.0 0.0

For data sources see[5]

References