X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225222115002

Well Details

Well ID: 1225222115002
Loading map...
Location: 00/15-21-122-22W5/2
Location Alias: 00/15-21-22-22 W5M
Location Alias 2: 00/15-21-122-22 W5/02
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 22
Section: 21
County/Municipality: Mackenzie County
Well Name: STRATEGIC MARLOWE 15-21-122-22
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0225922
License Date: 1999-09-01
License Status: Suspension
Spud Date: 2000-01-04
Final Drill Date: 2000-01-11
Well Total Depth: 1513.80 m
Surface Hole Latitude: 59.616352
Surface Hole Longitude: -117.722153

For data sources see[1][2]

Well History

Date Event
1999-09-01 Obtained License
2000-01-11 Finished Drilling
2000-01-13 Production Casing Operation Performed
2000-01-14 Rig Released
2000-01-14 Well Mode changed to Drilled and Cased
2000-01-26 Well Log Performed
2000-01-28 Perforation Treatment Performed - Open-Hole Completion
2000-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-02 Perforation Treatment Performed - Jet Perforation
2000-02-02 Plug Back Performed
2000-02-02 Well Log Performed
2000-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-13 Well Log Performed
2000-03-01 Perforation Treatment Performed - Cement Squeeze
2000-03-04 Perforation Treatment Performed - Jet Perforation
2000-03-04 Well Log Performed
2000-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-06 Well Log Performed
2000-04-15 Well Began Injection
2000-04-15 Well Fluid changed to Acid Gas
2000-04-15 Well Type changed to Disposal
2014-12-01 Well Fluid changed to Acid Gas
2014-12-01 Well Mode changed to Suspended
2014-12-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-28 Open Hole/Barefoot Completion 1475.00 1513.80 0
2000-02-02 Packing Device Capped w/Cement 1454.00 1462.00 0
2000-02-02 Perforation 1219.00 1229.00 13
2000-02-12 Acid Treatment 1219.00 1229.00 0
2000-03-01 Cement Squeeze 1219.00 1229.00 0
2000-03-04 Perforation 1400.00 1409.00 13
2000-03-05 Acid Treatment 1400.00 1409.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

References