If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1245170610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.746671,"lon":-116.944825,"icon":""}]} |
Location: 00/10-06-124-17W5/0 | |
Location Alias: 00/10-06-24-17 W5M | |
Location Alias 2: 00/10-06-124-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 124 | |
Meridian: 5 | |
Range: 17 | |
Section: 06 | |
County/Municipality: Mackenzie County | |
Well Name: STRATEGIC LESSARD 10-6-124-17 | |
Operator Name: Strategic Oil & Gas Ltd. | |
License Number: 0049229 | |
License Date: 1974-03-04 | |
License Status: Issued | |
Spud Date: 1974-03-18 | |
Final Drill Date: 1974-03-31 | |
Well Total Depth: 1117.70 m | |
Surface Hole Latitude: 59.746671 | |
Surface Hole Longitude: -116.944825 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-03-04 | Obtained License |
1974-03-31 | Drill Stem Test Performed |
1974-03-31 | Finished Drilling |
1974-04-02 | Drill Stem Test Performed |
1974-04-04 | Drill Stem Test Performed |
1974-04-06 | Production Casing Operation Performed |
1974-04-06 | Well Mode changed to Drilled and Cased |
1980-03-06 | Perforation Treatment Performed - Jet Perforation |
1980-03-08 | Well Began Production |
1980-03-08 | Well Fluid changed to Crude Oil |
1980-03-08 | Well Mode changed to Pumping |
1980-03-15 | Well Fluid changed to Crude Oil |
1980-03-15 | Well Mode changed to Suspended |
1982-03-05 | Well Fluid changed to Crude Oil |
1982-03-05 | Well Mode changed to Pumping |
1982-03-16 | Well Fluid changed to Crude Oil |
1982-03-16 | Well Mode changed to Suspended |
1982-12-16 | Well Fluid changed to Crude Oil |
1982-12-16 | Well Mode changed to Pumping |
1983-04-01 | Well Fluid changed to Crude Oil |
1983-04-01 | Well Mode changed to Suspended |
1983-12-21 | Well Fluid changed to Crude Oil |
1983-12-21 | Well Mode changed to Pumping |
1984-03-31 | Well Fluid changed to Crude Oil |
1984-03-31 | Well Mode changed to Suspended |
1984-12-04 | Well Fluid changed to Crude Oil |
1984-12-04 | Well Mode changed to Pumping |
1985-03-31 | Well Fluid changed to Crude Oil |
1985-03-31 | Well Mode changed to Suspended |
1985-12-10 | Well Fluid changed to Crude Oil |
1985-12-10 | Well Mode changed to Pumping |
1986-03-30 | Well Fluid changed to Crude Oil |
1986-03-30 | Well Mode changed to Suspended |
1988-01-01 | Well Fluid changed to Crude Oil |
1988-01-01 | Well Mode changed to Pumping |
1988-04-12 | Well Fluid changed to Crude Oil |
1988-04-12 | Well Mode changed to Suspended |
1989-01-21 | Well Fluid changed to Crude Oil |
1989-01-21 | Well Mode changed to Pumping |
1990-03-31 | Well Fluid changed to Crude Oil |
1990-03-31 | Well Mode changed to Suspended |
1990-12-06 | Well Fluid changed to Crude Oil |
1990-12-06 | Well Mode changed to Pumping |
1991-03-22 | Well Fluid changed to Crude Oil |
1991-03-22 | Well Mode changed to Suspended |
1991-12-04 | Well Fluid changed to Crude Oil |
1991-12-04 | Well Mode changed to Pumping |
1992-04-01 | Well Fluid changed to Crude Oil |
1992-04-01 | Well Mode changed to Suspended |
1999-02-23 | Well Fluid changed to Crude Oil |
1999-02-23 | Well Mode changed to Pumping |
2000-02-23 | Well Fluid changed to Crude Oil |
2000-02-23 | Well Mode changed to Pumping |
2000-04-01 | Well Fluid changed to Crude Oil |
2000-04-01 | Well Mode changed to Suspended |
2004-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-22 | Well Log Performed |
2004-02-23 | Well Log Performed |
2004-02-26 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-06 | Perforation | 971.10 | 985.10 | 13 |
2004-02-22 | Packing Device Capped w/Cement | 969.00 | 977.00 | 0 |
2004-02-26 | Perforation | 795.50 | 799.20 | 17 |
2004-02-26 | Perforation | 801.00 | 804.70 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 136 | 0.0 | 0.0 | 0.0 |
1982 | 633 | 0.0 | 0.0 | 0.0 |
1983 | 2312 | 0.0 | 0.0 | 0.0 |
1984 | 2655 | 0.0 | 0.0 | 0.0 |
1985 | 2536 | 0.0 | 0.0 | 0.0 |
1986 | 1981 | 0.0 | 0.0 | 0.0 |
1988 | 2318 | 0.0 | 0.0 | 0.0 |
1989 | 1865 | 0.0 | 0.0 | 0.0 |
1990 | 2755 | 0.0 | 0.0 | 0.0 |
1991 | 2443 | 0.0 | 0.0 | 0.0 |
1992 | 1380 | 0.0 | 0.0 | 0.0 |
2000 | 384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]