X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1265181611000

Well Details

Well ID: 1265181611000
Loading map...
Location: 00/11-16-126-18W5/0
Location Alias: 00/11-16-26-18 W5M
Location Alias 2: 00/11-16-126-18 W5/00
Country: Canada
Province: Alberta
Township: 126
Meridian: 5
Range: 18
Section: 16
County/Municipality: Mackenzie County
Well Name: STRATEGIC RATZ 11-16-126-18
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0230039
License Date: 1999-12-09
License Status: Abandoned
Spud Date: 2000-01-07
Final Drill Date: 2000-01-15
Well Total Depth: 986.00 m
Surface Hole Latitude: 59.949116
Surface Hole Longitude: -117.068374

For data sources see[1][2]

Well History

Date Event
1999-12-09 Obtained License
2000-01-09 Surface Casing Operation Performed
2000-01-15 Finished Drilling
2000-01-15 Well Log Performed
2000-01-17 Production Casing Operation Performed
2000-01-17 Rig Released
2000-01-17 Well Mode changed to Drilled and Cased
2000-02-09 Well Log Performed
2000-02-15 Perforation Treatment Performed - Jet Perforation
2000-02-15 Well Log Performed
2000-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-08 Perforation Treatment Performed - Jet Perforation
2000-03-08 Well Log Performed
2000-03-08 Well Mode changed to Drilled and Cased
2002-05-17 Well Began Production
2002-05-17 Well Fluid changed to Gas
2002-05-17 Well Mode changed to Flowing
2003-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-19 Plug Back Performed
2003-03-19 Well Fluid changed to Gas
2003-03-19 Well Mode changed to Abandoned Zone
2003-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-22 Perforation Treatment Performed - Jet Perforation
2003-03-22 Plug Back Performed
2003-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-23 Plug Back Performed
2019-03-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-15 Perforation 946.00 949.00 17
2003-03-22 Packing Device Capped w/Cement 807.00 815.00 0
2003-03-22 Perforation 758.00 762.00 17
2003-03-28 Acid Treatment 758.00 762.00 0
2019-01-23 Packing Device Capped w/Cement 735.00 745.00 0
2000-02-15 Perforation 935.00 938.00 17
2000-02-15 Perforation 924.00 929.00 17
2000-02-19 Acid Treatment 924.00 949.00 0
2000-03-08 Perforation 828.00 830.00 17
2000-03-08 Perforation 824.00 825.00 17
2000-03-08 Perforation 822.00 824.50 17
2003-03-19 Packing Device Capped w/Cement 908.00 919.00 0
2003-03-20 Acid Treatment 822.00 830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1882 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References