If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1B0.07-09-002-29W1 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Well Name: South Pierson Unit No. 1 WIW | |
Country: Canada | |
Province: Manitoba | |
Township: 002 | |
Meridian: W1 | |
Range: 29 | |
Section: 09 | |
Division: Division No. 5 | |
Subdivision: Two Borders | |
Operator Name: Canadian Natural Resources Limited | |
License Status: Water Injection Well | |
Spud Date: 2005-05-24 | |
License Date: 2005-04-22 | |
Well Total Depth: 1037.00 | |
Latitude: 49.10748367 | |
Longitude: -101.30574676 |
For data sources see[1]
Date | Event |
---|---|
2005-04-22 | Location |
2005-05-30 | Running Casing |
2005-05-30 | Waiting On Service Rig |
2005-06-19 | Completing |
2005-08-02 | Capable Of Oil Production |
2017-12-29 | Water Injection Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2005-05-24 | Ensign Drilling Inc. | 47 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2005-06-20 | HOLLOW STEEL CARRIER | 1023.50 | 1029.50 | 20 | N/A | 2005-09-23 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2005-07-29 | ACID JOB | 15 % HCL | 1.0 | N/A | ||
2005-07-29 | FRAC | N/A | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2005 | Canadian Natural Resources Limited | 1,196.40 | 0 | 0.00 |
2006 | Canadian Natural Resources Limited | 1,492.80 | 0 | 0.00 |
2007 | Canadian Natural Resources Limited | 973.00 | 0 | 0.00 |
2008 | Canadian Natural Resources Limited | 753.30 | 0 | 0.00 |
2009 | Canadian Natural Resources Limited | 852.20 | 0 | 0.00 |
2014 | Canadian Natural Resources Limited | 1,093.60 | 0 | 28.50 |
2015 | Canadian Natural Resources Limited | 1,126.00 | 0 | 50.00 |
2016 | Canadian Natural Resources Limited | 1,110.40 | 0 | 40.90 |
2017 | Canadian Natural Resources Limited | 503.80 | 0 | 6.30 |
2018 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 |
2019 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 |
2020 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2005 | Canadian Natural Resources Limited | 83.20 | 151 | 0.00 | 0 | 0.00 | 0.00 |
2006 | Canadian Natural Resources Limited | 23.30 | 363 | 0.00 | 0 | 0.00 | 0.00 |
2007 | Canadian Natural Resources Limited | 4.00 | 362 | 2.80 | 362 | 0.00 | 0.00 |
2008 | Canadian Natural Resources Limited | 3.50 | 353 | 32.80 | 353 | 0.00 | 0.00 |
2009 | Canadian Natural Resources Limited | 4.10 | 362 | 31.20 | 362 | 0.00 | 0.00 |
2014 | Canadian Natural Resources Limited | 58.30 | 333 | 35.10 | 333 | 0.00 | 0.00 |
2015 | Canadian Natural Resources Limited | 82.20 | 360 | 57.70 | 360 | 0.00 | 0.00 |
2016 | Canadian Natural Resources Limited | 46.30 | 360 | 55.80 | 360 | 0.00 | 0.00 |
2017 | Canadian Natural Resources Limited | 15.60 | 181 | 25.80 | 361 | 0.00 | 0.00 |
2018 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Canadian Natural Resources Limited | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]