If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-003-19861 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Well Name: Duke 2 | |
Country: United States | |
State: New York | |
County: Allegany | |
Municipality: Genesee | |
Operator Name: Dallas Energy LLC | |
Well Status: Plugged And Abandoned | |
Spud Date: 1985-02-03 | |
Permit Date: 1985-01-14 | |
Well Completion Date: 1985-02-04 | |
Configuration: Vertical | |
Measured Well Depth (ft): 200 | |
Latitude: 42.033909999 | |
Longitude: -78.20658000 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2007 | Dallas Energy LLC | Gas | 0.00 Mcf | 0 Months |
2007 | Dallas Energy LLC | Oil | 0.00 Bbl | 0 Months |
2008 | Dallas Energy LLC | Gas | 0.00 Mcf | 0 Months |
2008 | Dallas Energy LLC | Oil | 0.00 Bbl | 0 Months |
For data sources see[2]
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2007 | Dallas Energy LLC | WATER | 0 Bbl | 0 Months |
2008 | Dallas Energy LLC | WATER | 0 Bbl | 0 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
1985-01-14 | New Permit Issued. |
1985-02-03 | Drilling started |
1985-02-04 | Drilling completed |
Effective Date | Old Operator Name | New Operator Name |
---|---|---|
2007-01-09 | Lee Oil Company Inc. | Dallas Energy LLC |
For data sources see[3]