If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-003-28002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Well Name: Hollenbeck H6 | |
Country: United States | |
State: New York | |
County: Allegany | |
Municipality: Andover | |
Operator Name: Hollenbeck Lloyd D. | |
Well Status: Active | |
Spud Date: 2012-05-29 | |
Permit Date: 2012-04-02 | |
Well Completion Date: 2012-12-20 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1934 | |
Latitude: 42.128303000 | |
Longitude: -77.77605499 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2012 | Hollenbeck Lloyd D. | Gas | 0.00 Mcf | 0 Months |
2012 | Hollenbeck Lloyd D. | Oil | 0.00 Bbl | 0 Months |
2013 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 12 Months |
2013 | Hollenbeck Lloyd D. | Oil | 0.00 Bbl | 12 Months |
2014 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 6 Months |
2014 | Hollenbeck Lloyd D. | Oil | 105.00 Bbl | 6 Months |
2015 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 8 Months |
2015 | Hollenbeck Lloyd D. | Oil | 30.00 Bbl | 8 Months |
2016 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 12 Months |
2016 | Hollenbeck Lloyd D. | Oil | 0.00 Bbl | 12 Months |
2017 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 12 Months |
2017 | Hollenbeck Lloyd D. | Oil | 0.00 Bbl | 12 Months |
2018 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 12 Months |
2018 | Hollenbeck Lloyd D. | Oil | 129.00 Bbl | 12 Months |
2019 | Hollenbeck Lloyd D. | Gas | 1.00 Mcf | 12 Months |
2019 | Hollenbeck Lloyd D. | Oil | 32.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2012 | Hollenbeck Lloyd D. | WATER | 0 Bbl | 0 Months |
2013 | Hollenbeck Lloyd D. | WATER | 0 Bbl | 12 Months |
2014 | Hollenbeck Lloyd D. | WATER | 10 Bbl | 6 Months |
2015 | Hollenbeck Lloyd D. | WATER | 3 Bbl | 8 Months |
2016 | Hollenbeck Lloyd D. | WATER | 0 Bbl | 12 Months |
2017 | Hollenbeck Lloyd D. | WATER | 0 Bbl | 12 Months |
2018 | Hollenbeck Lloyd D. | WATER | 21 Bbl | 12 Months |
2019 | Hollenbeck Lloyd D. | WATER | 5 Bbl | Unknown |
Event Date | Event Description |
---|---|
2012-04-02 | New Permit Issued. |
2012-05-29 | Drilling started |
2012-12-20 | Drilling completed |