If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-28026 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.007638,"lon":-78.654966,"icon":""}]} |
Well Name: Potter Lumber 2 1 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Carrollton | |
Operator Name: Dallas Energy LLC | |
Well Status: Active | |
Spud Date: 2013-01-18 | |
Permit Date: 2012-08-02 | |
Well Completion Date: 2013-04-01 | |
Configuration: Directional | |
Measured Well Depth (ft): 3421 | |
Latitude: 42.007638 | |
Longitude: -78.65496600 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2013 | Dallas Energy LLC | Gas | 632.00 Mcf | 9 Months |
2013 | Dallas Energy LLC | Oil | 383.00 Bbl | 9 Months |
2014 | Dallas Energy LLC | Gas | 598.00 Mcf | 12 Months |
2014 | Dallas Energy LLC | Oil | 347.00 Bbl | 12 Months |
2015 | Dallas Energy LLC | Gas | 0.00 Mcf | 12 Months |
2015 | Dallas Energy LLC | Oil | 0.00 Bbl | 12 Months |
2016 | Dallas Energy LLC | Gas | 125.00 Mcf | 12 Months |
2016 | Dallas Energy LLC | Oil | 0.00 Bbl | 12 Months |
2017 | Dallas Energy LLC | Gas | 398.00 Mcf | 12 Months |
2017 | Dallas Energy LLC | Oil | 76.00 Bbl | 12 Months |
2018 | Dallas Energy LLC | Gas | 295.00 Mcf | 12 Months |
2018 | Dallas Energy LLC | Oil | 75.00 Bbl | 12 Months |
2019 | Dallas Energy LLC | Gas | 7.00 Mcf | 12 Months |
2019 | Dallas Energy LLC | Oil | 0.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2013 | Dallas Energy LLC | WATER | 2865 Bbl | 9 Months |
2014 | Dallas Energy LLC | WATER | 1385 Bbl | 12 Months |
2015 | Dallas Energy LLC | WATER | 262 Bbl | 12 Months |
2016 | Dallas Energy LLC | WATER | 70 Bbl | 12 Months |
2017 | Dallas Energy LLC | WATER | 665 Bbl | 12 Months |
2018 | Dallas Energy LLC | WATER | 176 Bbl | 12 Months |
2019 | Dallas Energy LLC | WATER | 0 Bbl | Unknown |
Event Date | Event Description |
---|---|
2012-08-02 | New Permit Issued. |
2013-01-15 | New Permit Issued. |
2013-01-18 | Spud activity performed with a Vertical slant to a measured depth of 1305. |
2013-04-01 | Spud activity performed with a Horizontal slant to a measured depth of 3421. |
2013-09-11 | Drilling completed |