If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-28394 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.045285999,"lon":-78.529345,"icon":""}]} |
Well Name: VEI 1 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Allegany | |
Operator Name: Vertical Energy Inc. | |
Well Status: Inactive | |
Spud Date: 2017-08-31 | |
Permit Date: 2017-08-09 | |
Well Completion Date: 2018-05-03 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1900 | |
Latitude: 42.045285999 | |
Longitude: -78.52934500 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2018 | Vertical Energy Inc. | Gas | 0.00 Mcf | 0 Months |
2018 | Vertical Energy Inc. | Oil | 0.00 Bbl | 0 Months |
2019 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2019 | Vertical Energy Inc. | Oil | 102.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2018 | Vertical Energy Inc. | WATER | 0 Bbl | 0 Months |
2019 | Vertical Energy Inc. | WATER | 40 Bbl | Unknown |
Event Date | Event Description |
---|---|
2017-08-09 | New Permit Issued. |
2017-08-30 | Drilling started |
2019-08-16 | Drilling completed |