If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-28461 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.045523,"lon":-78.50504999,"icon":""}]} |
Well Name: DC-12 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Allegany | |
Operator Name: Dimes Energy GP Inc. | |
Well Status: Active | |
Spud Date: 2018-09-19 | |
Permit Date: 2018-09-05 | |
Well Completion Date: 2018-12-04 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1730 | |
Latitude: 42.045523000 | |
Longitude: -78.50504999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2018 | Dimes Energy GP Inc. | Gas | 0.00 Mcf | 0 Months |
2018 | Dimes Energy GP Inc. | Oil | 0.00 Bbl | 0 Months |
2019 | Dimes Energy GP Inc. | Gas | 532.00 Mcf | 12 Months |
2019 | Dimes Energy GP Inc. | Oil | 1123.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2018 | Dimes Energy GP Inc. | WATER | 0 Bbl | 0 Months |
2019 | Dimes Energy GP Inc. | WATER | 749 Bbl | Unknown |
Event Date | Event Description |
---|---|
2018-09-05 | New Permit Issued. |
2018-09-19 | Drilling started |
2018-12-04 | Drilling completed |