If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-30024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.005918999,"lon":-78.649021,"icon":""}]} |
Well Name: Potter Lumber 2 # 4 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Carrollton | |
Operator Name: Dallas Energy LLC | |
Well Status: Active | |
Spud Date: 2014-03-29 | |
Permit Date: 2013-10-24 | |
Well Completion Date: 2014-05-08 | |
Configuration: Vertical | |
Measured Well Depth (ft): 2000 | |
Latitude: 42.005918999 | |
Longitude: -78.64902100 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2014 | Dallas Energy LLC | Gas | 530.00 Mcf | 8 Months |
2014 | Dallas Energy LLC | Oil | 677.00 Bbl | 8 Months |
2015 | Dallas Energy LLC | Gas | 294.00 Mcf | 12 Months |
2015 | Dallas Energy LLC | Oil | 494.00 Bbl | 12 Months |
2016 | Dallas Energy LLC | Gas | 638.00 Mcf | 12 Months |
2016 | Dallas Energy LLC | Oil | 266.00 Bbl | 12 Months |
2017 | Dallas Energy LLC | Gas | 891.00 Mcf | 12 Months |
2017 | Dallas Energy LLC | Oil | 153.00 Bbl | 12 Months |
2018 | Dallas Energy LLC | Gas | 443.00 Mcf | 12 Months |
2018 | Dallas Energy LLC | Oil | 135.00 Bbl | 12 Months |
2019 | Dallas Energy LLC | Gas | 333.00 Mcf | 12 Months |
2019 | Dallas Energy LLC | Oil | 186.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2014 | Dallas Energy LLC | WATER | 1450 Bbl | 8 Months |
2015 | Dallas Energy LLC | WATER | 782 Bbl | 12 Months |
2016 | Dallas Energy LLC | WATER | 514 Bbl | 12 Months |
2017 | Dallas Energy LLC | WATER | 398 Bbl | 12 Months |
2018 | Dallas Energy LLC | WATER | 370 Bbl | 12 Months |
2019 | Dallas Energy LLC | WATER | 370 Bbl | Unknown |
Event Date | Event Description |
---|---|
2013-10-24 | New Permit Issued. |
2014-03-29 | Drilling started |
2014-05-08 | Drilling completed |