If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-037-17464 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.89331,"lon":-78.28374999,"icon":""}]} |
Well Name: Ober 1 | |
Country: United States | |
State: New York | |
County: Genesee | |
Municipality: Alexander | |
Operator Name: Woodmere Energy 1982 Drilling Program | |
Well Status: Plugged And Abandoned | |
Spud Date: 1983-10-31 | |
Permit Date: 1983-10-12 | |
Well Completion Date: 1983-11-14 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1825 | |
Latitude: 42.89331 | |
Longitude: -78.28374999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
1985 | Woodmere Energy 1982 Drilling Program | Gas | 0.00 Mcf | 0 Months |
1986 | Woodmere Energy 1982 Drilling Program | Gas | 0.00 Mcf | 0 Months |
1988 | Woodmere Energy 1982 Drilling Program | Gas | 0.00 Mcf | 0 Months |
1989 | Woodmere Energy 1982 Drilling Program | Gas | 0.00 Mcf | 0 Months |
1990 | Woodmere Energy 1982 Drilling Program | Gas | 0.00 Mcf | 0 Months |
For data sources see[2]
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
1985 | Woodmere Energy 1982 Drilling Program | WATER | 0 Bbl | 0 Months |
1986 | Woodmere Energy 1982 Drilling Program | WATER | 0 Bbl | 0 Months |
1988 | Woodmere Energy 1982 Drilling Program | WATER | 0 Bbl | 0 Months |
1989 | Woodmere Energy 1982 Drilling Program | WATER | 0 Bbl | 0 Months |
1990 | Woodmere Energy 1982 Drilling Program | WATER | 0 Bbl | 0 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
1983-10-12 | New Permit Issued. |
1983-10-31 | Drilling started |
1983-11-14 | Drilling completed |
1985-06-12 | Well Plugged |
Effective Date | Old Operator Name | New Operator Name |
---|---|---|
1984-01-05 | Wwb Energy Corp. | Woodmere Energy 1982 Drilling Program |
For data sources see[3]