If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-037-19435 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":43.01917,"lon":-78.27199,"icon":""}]} |
Well Name: Kiefer 1 | |
Country: United States | |
State: New York | |
County: Genesee | |
Municipality: Batavia | |
Operator Name: United States Gypsum Company | |
Well Status: Plugged And Abandoned | |
Spud Date: 1985-05-07 | |
Permit Date: 1985-03-21 | |
Well Completion Date: 1985-05-24 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1128 | |
Latitude: 43.019170000 | |
Longitude: -78.27199000 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
1985 | United States Gypsum Company | Gas | 104.00 Mcf | 1 Months |
1986 | United States Gypsum Company | Gas | 195.00 Mcf | 12 Months |
1987 | United States Gypsum Company | Gas | 26.00 Mcf | 7 Months |
1988 | United States Gypsum Company | Gas | 6.00 Mcf | 1 Months |
1989 | United States Gypsum Company | Gas | 25.00 Mcf | 4 Months |
1990 | United States Gypsum Company | Gas | 2.00 Mcf | 2 Months |
1991 | United States Gypsum Company | Gas | 0.00 Mcf | 0 Months |
1992 | United States Gypsum Company | Gas | 0.00 Mcf | 0 Months |
For data sources see[2]
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
1985 | United States Gypsum Company | WATER | 0 Bbl | 1 Months |
1986 | United States Gypsum Company | WATER | 65 Bbl | 12 Months |
1987 | United States Gypsum Company | WATER | 27 Bbl | 7 Months |
1988 | United States Gypsum Company | WATER | 0 Bbl | 1 Months |
1989 | United States Gypsum Company | WATER | 0 Bbl | 4 Months |
1990 | United States Gypsum Company | WATER | 0 Bbl | 2 Months |
1991 | United States Gypsum Company | WATER | 0 Bbl | 0 Months |
1992 | United States Gypsum Company | WATER | 0 Bbl | 0 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
1985-03-21 | New Permit Issued. |
1985-05-07 | Drilling started |
1985-05-24 | Drilling completed |
1992-06-12 | Well Plugged |
Effective Date | Old Operator Name | New Operator Name |
---|---|---|
1991-09-23 | Gypsum Energy Management Co. | United States Gypsum Company |
For data sources see[3]