If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-037-23911 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.96591,"lon":-78.28689,"icon":""}]} |
Well Name: Brown D&P 1 | |
Country: United States | |
State: New York | |
County: Genesee | |
Municipality: Batavia | |
Operator Name: United States Gypsum Company | |
Well Status: Active | |
Spud Date: 2006-10-10 | |
Permit Date: 2006-09-28 | |
Well Completion Date: 2006-11-01 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1317 | |
Latitude: 42.965910000 | |
Longitude: -78.28689 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2006 | United States Gypsum Company | Gas | 42.00 Mcf | 1 Months |
2006 | United States Gypsum Company | Oil | 0.00 Bbl | 1 Months |
2007 | United States Gypsum Company | Gas | 1824.00 Mcf | 12 Months |
2007 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2008 | United States Gypsum Company | Gas | 1530.00 Mcf | 12 Months |
2008 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2009 | United States Gypsum Company | Gas | 1171.00 Mcf | 12 Months |
2009 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2010 | United States Gypsum Company | Gas | 1290.00 Mcf | 12 Months |
2010 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2011 | United States Gypsum Company | Gas | 1132.00 Mcf | 12 Months |
2012 | United States Gypsum Company | Gas | 1084.00 Mcf | 11 Months |
2013 | United States Gypsum Company | Gas | 875.00 Mcf | 9 Months |
2013 | United States Gypsum Company | Oil | 0.00 Bbl | 9 Months |
2014 | United States Gypsum Company | Gas | 941.00 Mcf | 12 Months |
2014 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2015 | United States Gypsum Company | Gas | 830.00 Mcf | 12 Months |
2015 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2016 | United States Gypsum Company | Gas | 873.00 Mcf | 12 Months |
2016 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2017 | United States Gypsum Company | Gas | 859.00 Mcf | 12 Months |
2017 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2018 | United States Gypsum Company | Gas | 852.00 Mcf | 12 Months |
2018 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
2019 | United States Gypsum Company | Gas | 780.00 Mcf | 12 Months |
2019 | United States Gypsum Company | Oil | 0.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2006 | United States Gypsum Company | WATER | 0 Bbl | 1 Months |
2007 | United States Gypsum Company | WATER | 20 Bbl | 12 Months |
2008 | United States Gypsum Company | WATER | 40 Bbl | 12 Months |
2009 | United States Gypsum Company | WATER | 0 Bbl | 12 Months |
2010 | United States Gypsum Company | WATER | 0 Bbl | 12 Months |
2011 | United States Gypsum Company | WATER | 40 Bbl | 12 Months |
2012 | United States Gypsum Company | WATER | 1 Bbl | 11 Months |
2013 | United States Gypsum Company | WATER | 2 Bbl | 9 Months |
2014 | United States Gypsum Company | WATER | 16 Bbl | 12 Months |
2015 | United States Gypsum Company | WATER | 22 Bbl | 12 Months |
2016 | United States Gypsum Company | WATER | 2 Bbl | 12 Months |
2017 | United States Gypsum Company | WATER | 2 Bbl | 12 Months |
2018 | United States Gypsum Company | WATER | 17 Bbl | 12 Months |
2019 | United States Gypsum Company | WATER | 0 Bbl | Unknown |
Event Date | Event Description |
---|---|
2006-09-28 | New Permit Issued. |
2006-10-10 | Drilling started |
2006-11-01 | Drilling completed |