If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 31-101-26376 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.08113,"lon":-77.73221999,"icon":""}]} |
| Well Name: Schultz 5A | |
| Country: United States | |
| State: New York | |
| County: Steuben | |
| Municipality: West Union | |
| Operator Name: Yahn & Yahn Inc. | |
| Well Status: Active | |
| Spud Date: 2009-07-13 | |
| Permit Date: 2009-06-30 | |
| Well Completion Date: 2009-07-28 | |
| Configuration: Vertical | |
| Measured Well Depth (ft): 1798 | |
| Latitude: 42.081130000 | |
| Longitude: -77.73221999 |
For data sources see[1]
| Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
|---|---|---|---|---|
| 2009 | Yahn & Yahn Inc. | Gas | 558.00 Mcf | 12 Months |
| 2009 | Yahn & Yahn Inc. | Oil | 107.00 Bbl | 12 Months |
| 2010 | Yahn & Yahn Inc. | Gas | 998.00 Mcf | 12 Months |
| 2010 | Yahn & Yahn Inc. | Oil | 133.00 Bbl | 12 Months |
| 2011 | Yahn & Yahn Inc. | Gas | 288.00 Mcf | 12 Months |
| 2011 | Yahn & Yahn Inc. | Oil | 200.00 Bbl | 12 Months |
| 2012 | Yahn & Yahn Inc. | Gas | 417.00 Mcf | 12 Months |
| 2012 | Yahn & Yahn Inc. | Oil | 88.00 Bbl | 12 Months |
| 2013 | Yahn & Yahn Inc. | Gas | 546.00 Mcf | 12 Months |
| 2013 | Yahn & Yahn Inc. | Oil | 81.00 Bbl | 12 Months |
| 2014 | Yahn & Yahn Inc. | Gas | 5.00 Mcf | 12 Months |
| 2014 | Yahn & Yahn Inc. | Oil | 0.00 Bbl | 12 Months |
| 2015 | Yahn & Yahn Inc. | Gas | 377.00 Mcf | 12 Months |
| 2015 | Yahn & Yahn Inc. | Oil | 53.00 Bbl | 12 Months |
| 2016 | Yahn & Yahn Inc. | Gas | 124.00 Mcf | 12 Months |
| 2016 | Yahn & Yahn Inc. | Oil | 40.00 Bbl | 12 Months |
| 2017 | Yahn & Yahn Inc. | Gas | 329.00 Mcf | 12 Months |
| 2017 | Yahn & Yahn Inc. | Oil | 30.00 Bbl | 12 Months |
| 2019 | Yahn & Yahn Inc. | Gas | 202.00 Mcf | 12 Months |
| 2019 | Yahn & Yahn Inc. | Oil | 17.00 Bbl | 12 Months |
| Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
|---|---|---|---|---|
| 2009 | Yahn & Yahn Inc. | WATER | 10 Bbl | 12 Months |
| 2010 | Yahn & Yahn Inc. | WATER | 20 Bbl | 12 Months |
| 2011 | Yahn & Yahn Inc. | WATER | 30 Bbl | 12 Months |
| 2012 | Yahn & Yahn Inc. | WATER | 22 Bbl | 12 Months |
| 2013 | Yahn & Yahn Inc. | WATER | 18 Bbl | 12 Months |
| 2014 | Yahn & Yahn Inc. | WATER | 10 Bbl | 12 Months |
| 2015 | Yahn & Yahn Inc. | WATER | 5 Bbl | 12 Months |
| 2016 | Yahn & Yahn Inc. | WATER | 10 Bbl | 12 Months |
| 2017 | Yahn & Yahn Inc. | WATER | 4 Bbl | 12 Months |
| 2019 | Yahn & Yahn Inc. | WATER | 4 Bbl | Unknown |
| Event Date | Event Description |
|---|---|
| 2009-06-30 | New Permit Issued. |
| 2009-07-13 | Drilling started |
| 2009-07-28 | Drilling completed |