If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 31-101-26459 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.090049999,"lon":-77.73206,"icon":""}]} |
| Well Name: Edlind 2 | |
| Country: United States | |
| State: New York | |
| County: Steuben | |
| Municipality: West Union | |
| Operator Name: Nathan Petroleum Corp. | |
| Well Status: Active | |
| Spud Date: 2010-04-29 | |
| Permit Date: 2010-04-28 | |
| Well Completion Date: 2010-05-19 | |
| Configuration: Vertical | |
| Measured Well Depth (ft): 1825 | |
| Latitude: 42.090049999 | |
| Longitude: -77.73206000 |
For data sources see[1]
| Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
|---|---|---|---|---|
| 2010 | Nathan Petroleum Corp. | Gas | 4211.00 Mcf | 12 Months |
| 2010 | Nathan Petroleum Corp. | Oil | 686.00 Bbl | 12 Months |
| 2011 | Nathan Petroleum Corp. | Gas | 1122.00 Mcf | 12 Months |
| 2011 | Nathan Petroleum Corp. | Oil | 249.00 Bbl | 12 Months |
| 2012 | Nathan Petroleum Corp. | Gas | 376.00 Mcf | 12 Months |
| 2012 | Nathan Petroleum Corp. | Oil | 82.00 Bbl | 12 Months |
| 2013 | Nathan Petroleum Corp. | Gas | 275.00 Mcf | 12 Months |
| 2013 | Nathan Petroleum Corp. | Oil | 56.00 Bbl | 12 Months |
| 2014 | Nathan Petroleum Corp. | Gas | 249.00 Mcf | 12 Months |
| 2014 | Nathan Petroleum Corp. | Oil | 52.00 Bbl | 12 Months |
| 2015 | Nathan Petroleum Corp. | Gas | 241.00 Mcf | 12 Months |
| 2015 | Nathan Petroleum Corp. | Oil | 25.00 Bbl | 12 Months |
| 2016 | Nathan Petroleum Corp. | Gas | 239.00 Mcf | 12 Months |
| 2016 | Nathan Petroleum Corp. | Oil | 24.00 Bbl | 12 Months |
| 2017 | Nathan Petroleum Corp. | Gas | 222.00 Mcf | 12 Months |
| 2017 | Nathan Petroleum Corp. | Oil | 24.00 Bbl | 12 Months |
| 2018 | Nathan Petroleum Corp. | Gas | 627.00 Mcf | 12 Months |
| 2018 | Nathan Petroleum Corp. | Oil | 76.00 Bbl | 12 Months |
| 2019 | Nathan Petroleum Corp. | Gas | 449.00 Mcf | 12 Months |
| 2019 | Nathan Petroleum Corp. | Oil | 40.00 Bbl | 12 Months |
| Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
|---|---|---|---|---|
| 2010 | Nathan Petroleum Corp. | WATER | 119 Bbl | 12 Months |
| 2011 | Nathan Petroleum Corp. | WATER | 19 Bbl | 12 Months |
| 2012 | Nathan Petroleum Corp. | WATER | 5 Bbl | 12 Months |
| 2013 | Nathan Petroleum Corp. | WATER | 4 Bbl | 12 Months |
| 2014 | Nathan Petroleum Corp. | WATER | 2 Bbl | 12 Months |
| 2015 | Nathan Petroleum Corp. | WATER | 2 Bbl | 12 Months |
| 2016 | Nathan Petroleum Corp. | WATER | 2 Bbl | 12 Months |
| 2017 | Nathan Petroleum Corp. | WATER | 2 Bbl | 12 Months |
| 2018 | Nathan Petroleum Corp. | WATER | 3 Bbl | 12 Months |
| 2019 | Nathan Petroleum Corp. | WATER | 2 Bbl | Unknown |
| Event Date | Event Description |
|---|---|
| 2010-04-28 | New Permit Issued. |
| 2010-04-29 | Drilling started |
| 2010-05-19 | Drilling completed |