If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-101-26493 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.09214,"lon":-77.72929,"icon":""}]} |
Well Name: Edlind 16 | |
Country: United States | |
State: New York | |
County: Steuben | |
Municipality: West Union | |
Operator Name: Nathan Petroleum Corp. | |
Well Status: Active | |
Spud Date: 2011-11-10 | |
Permit Date: 2011-08-04 | |
Well Completion Date: 2012-04-27 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1775 | |
Latitude: 42.092140000 | |
Longitude: -77.72929000 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2011 | Nathan Petroleum Corp. | Gas | 0.00 Mcf | 0 Months |
2011 | Nathan Petroleum Corp. | Oil | 0.00 Bbl | 0 Months |
2012 | Nathan Petroleum Corp. | Gas | 3293.00 Mcf | 12 Months |
2012 | Nathan Petroleum Corp. | Oil | 653.00 Bbl | 12 Months |
2013 | Nathan Petroleum Corp. | Gas | 1940.00 Mcf | 12 Months |
2013 | Nathan Petroleum Corp. | Oil | 287.00 Bbl | 12 Months |
2014 | Nathan Petroleum Corp. | Gas | 879.00 Mcf | 12 Months |
2014 | Nathan Petroleum Corp. | Oil | 185.00 Bbl | 12 Months |
2015 | Nathan Petroleum Corp. | Gas | 611.00 Mcf | 12 Months |
2015 | Nathan Petroleum Corp. | Oil | 59.00 Bbl | 12 Months |
2016 | Nathan Petroleum Corp. | Gas | 440.00 Mcf | 12 Months |
2016 | Nathan Petroleum Corp. | Oil | 60.00 Bbl | 12 Months |
2017 | Nathan Petroleum Corp. | Gas | 562.00 Mcf | 12 Months |
2017 | Nathan Petroleum Corp. | Oil | 61.00 Bbl | 12 Months |
2018 | Nathan Petroleum Corp. | Gas | 831.00 Mcf | 12 Months |
2018 | Nathan Petroleum Corp. | Oil | 123.00 Bbl | 12 Months |
2019 | Nathan Petroleum Corp. | Gas | 670.00 Mcf | 12 Months |
2019 | Nathan Petroleum Corp. | Oil | 84.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2011 | Nathan Petroleum Corp. | WATER | 0 Bbl | 0 Months |
2012 | Nathan Petroleum Corp. | WATER | 121 Bbl | 12 Months |
2013 | Nathan Petroleum Corp. | WATER | 23 Bbl | 12 Months |
2014 | Nathan Petroleum Corp. | WATER | 11 Bbl | 12 Months |
2015 | Nathan Petroleum Corp. | WATER | 9 Bbl | 12 Months |
2016 | Nathan Petroleum Corp. | WATER | 10 Bbl | 12 Months |
2017 | Nathan Petroleum Corp. | WATER | 9 Bbl | 12 Months |
2018 | Nathan Petroleum Corp. | WATER | 12 Bbl | 12 Months |
2019 | Nathan Petroleum Corp. | WATER | 6 Bbl | Unknown |
Event Date | Event Description |
---|---|
2011-08-04 | New Permit Issued. |
2011-11-10 | Drilling started |
2012-04-27 | Drilling completed |