If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 31-101-26496 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.084946,"lon":-77.729555,"icon":""}]} |
| Well Name: Edlind 26 | |
| Country: United States | |
| State: New York | |
| County: Steuben | |
| Municipality: West Union | |
| Operator Name: Yahn & Yahn Inc. | |
| Well Status: Active | |
| Spud Date: 2012-04-06 | |
| Permit Date: 2012-02-15 | |
| Well Completion Date: 2012-05-02 | |
| Configuration: Vertical | |
| Measured Well Depth (ft): 1800 | |
| Latitude: 42.084946000 | |
| Longitude: -77.72955500 |
For data sources see[1]
| Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
|---|---|---|---|---|
| 2012 | Yahn & Yahn Inc. | Gas | 2021.00 Mcf | 12 Months |
| 2012 | Yahn & Yahn Inc. | Oil | 600.00 Bbl | 12 Months |
| 2013 | Yahn & Yahn Inc. | Gas | 2402.00 Mcf | 12 Months |
| 2013 | Yahn & Yahn Inc. | Oil | 450.00 Bbl | 12 Months |
| 2014 | Yahn & Yahn Inc. | Gas | 1357.00 Mcf | 12 Months |
| 2014 | Yahn & Yahn Inc. | Oil | 110.00 Bbl | 12 Months |
| 2015 | Yahn & Yahn Inc. | Gas | 612.00 Mcf | 12 Months |
| 2015 | Yahn & Yahn Inc. | Oil | 36.00 Bbl | 12 Months |
| 2016 | Yahn & Yahn Inc. | Gas | 230.00 Mcf | 12 Months |
| 2016 | Yahn & Yahn Inc. | Oil | 74.00 Bbl | 12 Months |
| 2017 | Yahn & Yahn Inc. | Gas | 450.00 Mcf | 12 Months |
| 2017 | Yahn & Yahn Inc. | Oil | 63.00 Bbl | 12 Months |
| 2019 | Yahn & Yahn Inc. | Gas | 192.00 Mcf | 12 Months |
| 2019 | Yahn & Yahn Inc. | Oil | 33.00 Bbl | 12 Months |
| Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
|---|---|---|---|---|
| 2012 | Yahn & Yahn Inc. | WATER | 60 Bbl | 12 Months |
| 2013 | Yahn & Yahn Inc. | WATER | 100 Bbl | 12 Months |
| 2014 | Yahn & Yahn Inc. | WATER | 65 Bbl | 12 Months |
| 2015 | Yahn & Yahn Inc. | WATER | 7 Bbl | 12 Months |
| 2016 | Yahn & Yahn Inc. | WATER | 8 Bbl | 12 Months |
| 2017 | Yahn & Yahn Inc. | WATER | 6 Bbl | 12 Months |
| 2019 | Yahn & Yahn Inc. | WATER | 5 Bbl | Unknown |
| Event Date | Event Description |
|---|---|
| 2012-02-15 | New Permit Issued. |
| 2012-04-06 | Drilling started |
| 2012-05-02 | Drilling completed |