If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-20566 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.88,"lon":-82.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Perry Township | |
Operator Name: DEEP RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: GEORGE & JOSEPHINE BRETTIN {ERP#17} | |
License Status: Active Injection | |
License Date: 1984-08-14 | |
Spud Date: 1951-10-11 | |
Spud Drilling Contractor: P&N DRLG | |
Final Drill Date: 1951-10-29 | |
Well Total Depth: 775.00 ft | |
Configuration: Vertical | |
Latitude: 40.880000 | |
Longitude: -82.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1951-10-10 | 133 QUAKER STATE OIL REF CORP GeoDate 10/10/51 |
Oil and Gas | 1951-10-10 | Issued Date 10/10/51 Expired Date Acres 0080000 Tool Type Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1951-10-11 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Completed | 1951-10-29 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Reached Total Depth | 1951-10-29 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Completion Report Received | 1951-11-29 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
CO | 1984-08-14 | 133 QUAKER STATE OIL REF CORP GeoDate 8/14/84 |
Enhanced Recovery | 1984-08-14 | Issued Date 8/14/84 Expired Date 2/10/85 Acres 0080000 Tool Type CT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
First Injection | 1984-12-06 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Construction Permit Expires | 1985-02-10 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 10/10/51 |
Annulus Pressure Monitoring Approved | 1998-12-03 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Last Compliance Report | 1999-12-21 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
Change of Owner | 2002-02-07 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER |
Change of Owner | 2009-02-04 | Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC |
Record Last Modified | 2017-02-15 | There were 2 wells issued under this permit number (566-1 and 566-2). When the township maps were digitized these wells were not assigned 60,000 numbers. On 1/31/00 Belden applied to plug 566-2, a production well associated with this ERP. We assigned to it Permit # 61645. MM |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-05-23 | 705 | 760 | 0 |
705 | 760 | 0 | |
705 | 760 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 55 Qts | 0 | LOG ATTACHED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | QUAKER STATE OIL REF CORP | 0.00 | 48.00 | 0 |
1985 | QUAKER STATE OIL REF CORP | 0.00 | 100.00 | 365 |
1992 | QUAKER STATE OIL REF CORP | 0.00 | 338.00 | 365 |
1993 | QUAKER STATE OIL REF CORP | 0.00 | 294.00 | 365 |
1999 | BELDEN & BLAKE CORPORATION | 0.00 | 56.00 | 358 |
2000 | BELDEN & BLAKE CORPORATION | 0.00 | 58.00 | 359 |
2001 | BELDEN & BLAKE CORPORATION | 0.00 | 78.00 | 365 |
2002 | BELDEN & BLAKE CORPORATION | 0.00 | 26.00 | 37 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | QUAKER STATE OIL REF CORP | Brine | 0 | 0 |
1985 | QUAKER STATE OIL REF CORP | Brine | 14 | 365 |
1992 | QUAKER STATE OIL REF CORP | Brine | 0 | 365 |
1993 | QUAKER STATE OIL REF CORP | Brine | 0 | 365 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 5 | 358 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 0 | 359 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 0 | 365 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 0 | 37 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1120995290 | 2003-8-14 0:00: | ER | No Violations | |
-112578401 | 2015-11-17 0:00 | WR | No Violations | |
-121530127 | 2017-4-13 0:00: | ER | No Violations | |
-1228462119 | 2012-9-20 0:00: | ER | No Violations | |
-1255347378 | 2011-4-12 0:00: | ER | No Violations | 0.50 |
-1282081289 | 2016-4-19 0:00: | ER | No Violations | |
-1364332789 | 2010-11-26 0:00 | ER | No Violations | 0.50 |
-1416723237 | 2005-2-15 0:00: | ER | No Violations | 0.50 |
-1483692809 | 2009-4-27 0:00: | ER | No Violations | 0.50 |
-1520519661 | 2015-11-24 0:00 | WR | No Violations | |
-1562480434 | 2016-1-4 0:00:0 | ER | No Violations | |
-1585011227 | 2007-11-1 0:00: | ER | No Violations | 0.50 |
-1727491518 | 2009-10-20 0:00 | ER | No Violations | 1.00 |
-1763107058 | 2006-12-13 0:00 | ER | No Violations | 0.50 |
-1884587594 | 2018-4-23 0:00: | ER | No Violations | |
-1986123339 | 2012-5-30 0:00: | ER | No Violations | |
-2077953518 | 2019-1-14 0:00: | ER | No Violations | |
-2124307270 | 2016-7-11 0:00: | ER | No Violations | |
-363519666 | 2008-12-2 0:00: | ER | No Violations | 0.50 |
-422005192 | 2020-7-9 0:00:0 | ER | No Violations | |
-470244857 | 2014-5-6 0:00:0 | ER | No Violations | |
-57838005 | 2014-10-28 0:00 | ER | No Violations | |
-737852746 | 2015-5-20 0:00: | ER | No Violations | |
-771978257 | 2019-11-15 0:00 | ER | No Violations | |
-821113199 | 2015-8-28 0:00: | ER | No Violations | |
-931048632 | 2018-1-4 0:00:0 | ER | No Violations | |
0057838005 | 2014-10-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0112578401 | 2015-11-17 | Work Over Reconditioning | No Violations | The operator pulled the tubing and the packer remained in the hole. The nipple at the top of the packer rusted off. The operator installed a collar on the tubing and ran in the hole to successfully retrieve the packer. The well was shut in without the tubing and packer. A replacement packer need to be prepared. |
0121530127 | 2017-04-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0144599116 | 2010-03-30 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0182929273 | 2004-11-18 | Enhanced Recovery Project | No Violations | Injection pressure test. |
0275291000 | 2006-04-06 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. Constructed with 2 tubing cemented at Berea cap . 1tubing set on a packer for injection. |
0347534566 | 2013-05-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0353652842 | 2009-09-23 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure are equalized at 290 psi. |
0363519666 | 2008-12-02 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure test. Pressures are equal at 260 psi. Well needs transferred to Deep Resources LLC. |
0470244857 | 2014-05-06 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0473797361 | 2018-08-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0500227770 | 2015-03-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Pressure has equalized well temporarily shut in until annulus can be pressure tested. |
0578733551 | 2018-10-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0628222170 | 2004-04-22 | Enhanced Recovery Project | No Violations | Injection pressure test. |
0646727635 | 2013-03-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0659810427 | 2014-03-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0671506108 | 2015-10-06 | Enhanced Recovery Project | Violations Noted | Inspect well for integrity and pressure. Notified by the operator that the well head fittings were replaced. The Compliance order for well head fittings was resolved. The annulus pressure was equalized with the injection tubing. Violation issued. |
0737852746 | 2015-05-20 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well is Shut in. |
0767338212 | 2012-02-06 | Enhanced Recovery Project | No Violations | inspect well. |
0821113199 | 2015-08-28 | Enhanced Recovery Project | Violations Noted | Inspect well for integrity and pressure. The well was shut in. The injection shut off valve was leaking. |
0861640189 | 2007-05-31 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0931048632 | 2018-01-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0957885300 | 2017-01-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1021211136 | 2005-11-22 | Enhanced Recovery Project | No Violations | Annular and injection pressure test. |
1034994214 | 2012-11-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Injection line Tee leaking. |
1103265755 | 2016-11-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1120995290 | 2003-08-14 | Enhanced Recovery Project | No Violations | |
1151552121 | 2005-04-28 | Enhanced Recovery Project | No Violations | Injection well test. |
1168205096 | 2013-12-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Pump shut down during inspection. |
1228462119 | 2012-09-20 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
1255347378 | 2011-04-12 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1269491380 | 2014-07-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1282081289 | 2016-04-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1310908117 | 2011-07-12 | Enhanced Recovery Project | No Violations | Inspect well |
1319714816 | 2011-10-17 | Enhanced Recovery Project | No Violations | Inspect well. |
1360273616 | 2011-07-12 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1362580653 FOLLOW UP TO NOV # 1310908117 Inspect well. Resolved corrective action. The report was saved in triplicate on the computer resulting in an unabated NOV. |
1364332789 | 2010-11-26 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1416723237 | 2005-02-15 | Enhanced Recovery Project | No Violations | Annulus and injection pressure test. |
144599116 | 2010-3-30 0:00: | ER | No Violations | 0.50 |
1448977419 | 2015-11-25 | Work Over Reconditioning | No Violations | The well was determined to have equalized with the annulus on 10/6/2015, the well was shut in. The operator pulled the tubing and the packer remained in the hole. The nipple at the top of the packer rusted off. The operator installed a collar on the tubing and ran in the hole to successfully retrieve the packer. The well was temporarily shut in without the tubing and packer. The operator ran in the hole with a rebuilt Parmaco style packer and tubing. The packer was constructed with the PVC lined tubing and parts accumulated in the shop. The top most joint of tubing was replaced. Total of 24 joints of PVC lined tubing were installed in the well. An eight inch tail pipe was installed on the packer. The well was loaded with about 300 gallons of fresh water with corrosion inhibitor and circulated to the surface. The annulus was pressured up to 350 psi and the pressure monitored for 15 minutes. There was zero pressure loss over a 15 minute period. The well passed and the operator was notified that the well can be put into production. |
1483145047 | 2017-10-26 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1483692809 | 2009-04-27 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1491673466 | 2019-7-24 0:00: | ER | No Violations | |
1501676746 | 2017-07-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1520519661 | 2015-11-24 | Work Over Reconditioning | No Violations | The packer and tubing were previously removed from the well. The operator ran in the hole with a rebuilt Parmaco style packer and tubing. The packer was constructed with the PVC lined tubing parts accumulated in the shop. The top most joint of tubing was replaced. Total of 24 joints of PVC lined tubing were installed in the well. An eight inch tail pipe was installed on the packer. |
1555683256 | 2019-04-11 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The Pump was off during the inspection for maintenance. |
1562480434 | 2016-01-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Upon inspection the injection valve was partially cracked open. Notified operator and valve was opened completely. |
1581098310 | 2020-1-23 0:00: | ER | No Violations | |
1585011227 | 2007-11-01 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1589938505 | 2008-12-10 | Enhanced Recovery Project | No Violations | Mini test on annulus. Pumped to 400 psi for 15 minutes 0 psi decline. |
1597045448 | 2015-03-13 | Production Wells | No Violations | The well is an injection well on the enhanced recovery waterflood. ID posted. |
1727491518 | 2009-10-20 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. NOV in compliance. |
1763107058 | 2006-12-13 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
182929273 | 2004-11-18 0:00 | ER | No Violations | |
1884587594 | 2018-04-23 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1986123339 | 2012-05-30 | Enhanced Recovery Project | No Violations | Inspect Well. |
2077953518 | 2019-01-14 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
2124307270 | 2016-07-11 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
256262119 | 2020-4-10 0:00: | ER | No Violations | |
275291000 | 2006-4-6 0:00:0 | ER | No Violations | 0.50 |
347534566 | 2013-5-22 0:00: | ER | No Violations | |
353652842 | 2009-9-23 0:00: | ER | No Violations | 1.00 |
473797361 | 2018-8-15 0:00: | ER | No Violations | |
500227770 | 2015-3-31 0:00: | ER | No Violations | |
578733551 | 2018-10-9 0:00: | ER | No Violations | |
628222170 | 2004-4-22 0:00: | ER | No Violations | |
646727635 | 2013-3-5 0:00:0 | ER | No Violations | |
659810427 | 2014-3-18 0:00: | ER | No Violations | |
671506108 | 2015-10-6 0:00: | ER | No Violations | |
767338212 | 2012-2-6 0:00:0 | ER | No Violations | |
861640189 | 2007-5-31 0:00: | ER | No Violations | 0.50 |
957885300 | 2017-1-9 0:00:0 | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0353652842 | US-OH-123716 | 2009-09-23 | Failure to conduct or pass mech. integrity test | |
0363519666 | US-OH-123841 | 2008-12-02 | Failure to conduct or pass mech. integrity test | |
0671506108 | US-OH-127598 | 2015-12-15 | Mechanical failure/contamination | |
0821113199 | US-OH-129369 | 2015-10-07 | Violation of injection tubing/fitting requirements |
For data sources see[9]