If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-005-22623 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.88,"lon":-82.15,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashland | |
| Municipality: Perry Township | |
| Operator Name: DEEP RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: SMALLEY ELLEN (ERP #16) | |
| License Status: Active Injection | |
| License Date: 1983-06-13 | |
| Spud Date: 1983-08-15 | |
| Spud Drilling Contractor: WALTZ BROS DRLG | |
| Final Drill Date: 1983-09-22 | |
| Well Total Depth: 700.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.880000 | |
| Longitude: -82.150000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1967-09-21 | Issued Date 9/21/67 Expired Date Acres 0080000 Tool Type RTAF Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1968-01-29 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| CO | 1983-06-13 | 133 QUAKER STATE OIL REF CORP GeoDate 6/13/83 |
| Enhanced Recovery | 1983-06-13 | Issued Date 6/13/83 Expired Date 6/12/84 Acres 0080000 Tool Type CT Proposed Formation BEREA Proposed Depth 00700 Proposed Drill Depth 00700 |
| Completed | 1983-09-22 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| Reached Total Depth | 1983-09-22 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| CO | 1983-10-07 | 133 QUAKER STATE OIL REF CORP GeoDate 9/21/67 |
| First Injection | 1983-10-07 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| Completion Report Received | 1983-10-19 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| Construction Permit Expires | 1983-12-10 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 6/13/83 |
| Annulus Pressure Monitoring Approved | 1999-02-03 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| Change of Owner | 2002-02-07 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER |
| Change of Owner | 2008-04-24 | Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC |
| Last Compliance Report | 2012-05-10 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
| Record Last Modified | 2017-02-15 | LAST RECORD OF INJECTION IN 1998. PERMIT EXPIRED. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2000-05-23 | 622 | 665 | 0 |
| 2000-05-23 | 623 | 668 | 0 |
| 623 | 668 | 0 | |
| 675 | 680 | 0 | |
| 622 | 665 | 0 | |
| 622 | 665 | 0 | |
| 2000-05-23 | 675 | 680 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| NITR | 0 | 100 Qts | 0 | FOR PRODUCTION | ||
| NITR | 0 | 43 Qts | 0 | FOR ERP |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1035036965 | 2007-4-3 0:00:0 | ER | No Violations | 0.50 |
| -1083580157 | 2006-12-29 0:00 | ER | No Violations | 0.50 |
| -114767871 | 2008-11-26 0:00 | ER | No Violations | 0.50 |
| -1254354146 | 2011-4-12 0:00: | ER | No Violations | 0.50 |
| -1390155068 | 2020-4-22 0:00: | ER | No Violations | |
| -1418277813 | 2014-7-17 0:00: | ER | No Violations | |
| -1453910823 | 2007-1-18 0:00: | ER | No Violations | 1.00 |
| -1562721642 | 2018-10-10 0:00 | ER | No Violations | |
| -1603774533 | 2006-4-13 0:00: | ER | No Violations | 0.50 |
| -1794214157 | 2006-12-13 0:00 | ER | No Violations | 1.00 |
| -1808513735 | 2010-3-30 0:00: | ER | No Violations | 0.50 |
| -1827579185 | 2004-11-18 0:00 | ER | No Violations | |
| -1940863275 | 2019-4-11 0:00: | ER | No Violations | |
| -1995755843 | 2020-7-8 0:00:0 | ER | No Violations | |
| -2022057183 | 2013-5-22 0:00: | ER | No Violations | |
| -2055492011 | 2012-5-24 0:00: | ER | No Violations | |
| -2064169841 | 2017-4-27 0:00: | ER | No Violations | |
| -2129692623 | 2019-7-10 0:00: | ER | No Violations | |
| -235826017 | 2008-12-10 0:00 | ER | No Violations | 0.50 |
| -269185334 | 2020-1-23 0:00: | ER | No Violations | |
| -276745517 | 2007-10-30 0:00 | ER | No Violations | 1.00 |
| -357782889 | 2005-4-27 0:00: | ER | No Violations | 0.50 |
| -608383685 | 2011-10-17 0:00 | ER | No Violations | |
| -70830944 | 2016-7-8 0:00:0 | ER | No Violations | |
| -720952105 | 2017-7-18 0:00: | ER | No Violations | |
| -761273058 | 2018-8-13 0:00: | ER | No Violations | |
| -783292740 | 2016-1-5 0:00:0 | ER | No Violations | |
| -804814875 | 2018-5-2 0:00:0 | ER | No Violations | |
| -876725796 | 2017-1-9 0:00:0 | ER | No Violations | |
| -920122368 | 2013-3-4 0:00:0 | ER | No Violations | |
| -994419397 | 2005-8-29 0:00: | ER | No Violations | 0.50 |
| 0006199688 | 2005-12-22 | Enhanced Recovery Project | Violations Noted | Test annulus and injection pressure. Test past. NOV in compliance. |
| 0070830944 | 2016-07-08 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0114767871 | 2008-11-26 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure test. Reset packer and test. Pressures are equal. |
| 0138074121 | 2012-02-27 | Enhanced Recovery Project | No Violations | inspect well. Broke in. shut in well. |
| 0235826017 | 2008-12-10 | Enhanced Recovery Project | No Violations | Mini test on annulus. Pressured up to 400 psi |
| 0256903054 | 2003-08-14 | Enhanced Recovery Project | No Violations | |
| 0276745517 | 2007-10-30 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0289176245 | 2011-07-12 | Enhanced Recovery Project | No Violations | inspect well. |
| 0357782889 | 2005-04-27 | Enhanced Recovery Project | No Violations | Injection well test. |
| 0515593131 | 2012-11-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0516489223 | 2018-04-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0608383685 | 2011-10-17 | Enhanced Recovery Project | No Violations | Inspect well. |
| 0638698654 | 2016-04-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0720952105 | 2017-07-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0761273058 | 2018-08-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0779558640 | 2009-10-20 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0783292740 | 2016-01-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0804814875 | 2018-05-02 | Enhanced Recovery Project | No Violations | Inspect well with operator to preform monthly pressure test of the annulus on the well. |
| 0876725796 | 2017-01-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0884148818 | 2017-11-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0919436743 | 2010-11-26 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0920122368 | 2013-03-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0994419397 | 2005-08-29 | Enhanced Recovery Project | Violations Noted | Brine leak in line has been repaired. NOV in compliance. Cloudy, 70 degrees. |
| 1015551240 | 2013-12-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Pump shut down during inspection. |
| 1035036965 | 2007-04-03 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1054028033 | 2015-05-20 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1081704915 | 2014-10-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1083068864 | 2004-04-22 | Enhanced Recovery Project | No Violations | Injection pressure test. |
| 1083580157 | 2006-12-29 | Enhanced Recovery Project | No Violations | NOV followup. Ran mni test on annulus. Pressures equalized at 330 psi. One inch packer needs reset. |
| 1122298990 | 2005-07-25 | Enhanced Recovery Project | Violations Noted | Wet area around injection well box. Tested water with Quantab and readings are 2700 ppm chlorides. Advised Matt Miller to find leak and repair by 7-30-2005. |
| 1170258128 | 2007-01-31 | Enhanced Recovery Project | No Violations | Pulled tension on 1 packer and tested. No decline in pressure for 15 minutes. NOV in compliance. |
| 1203519755 | 2008-02-20 | Enhanced Recovery Project | No Violations | Annulus and injection pressure test. |
| 1211715369 | 2005-11-29 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressures have equalized. |
| 1212466338 | 2009-04-23 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1254354146 | 2011-04-12 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1339082884 | 2012-04-12 | Enhanced Recovery Project | No Violations | Run packer and tubing in hole. Set packer, circulate water with inhibitor. Pressure up and test for 15 minutes. Test passes. |
| 138074121 | 2012-2-27 0:00: | ER | No Violations | |
| 1418277813 | 2014-07-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1453910823 | 2007-01-18 | Enhanced Recovery Project | Violations Noted | Screwed pressure gauge in annulus side and pressure was 200psi. Turned on 1 injection tubing and pressure increased to 350 psi on annulus side. 1 packer has failed. Pull tubing and packer and inspect. |
| 1503996865 | 2015-10-30 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1532329021 | 2018-01-08 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1562721642 | 2018-10-10 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1603774533 | 2006-04-13 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. Constructed with 2 cemented at Berea cap and 1 tubing on a packer used for injection. |
| 1665892090 | 2016-11-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1680748694 | 2015-03-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1794214157 | 2006-12-13 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressures are equalized. |
| 1808513735 | 2010-03-30 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1827579185 | 2004-11-18 | Enhanced Recovery Project | No Violations | Injection pressure test. |
| 1992455096 | 2019-11-18 0:00 | ER | No Violations | |
| 2004997912 | 2012-09-20 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
| 2022057183 | 2013-05-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 2030668942 | 2014-05-06 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 2055492011 | 2012-05-24 | Enhanced Recovery Project | No Violations | Inspect Well. |
| 2064169841 | 2017-04-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 2084678569 | 2012-04-11 | Enhanced Recovery Project | No Violations | Service tubing and packer. Run tubing and rebuilt packer. Circulate inhibitor, set packer, pressure up annulus, test and pass at 430 psi. |
| 2131740808 | 2014-03-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 256903054 | 2003-8-14 0:00: | ER | No Violations | |
| 289176245 | 2011-7-12 0:00: | ER | No Violations | |
| 515593131 | 2012-11-27 0:00 | ER | No Violations | |
| 516489223 | 2018-4-27 0:00: | ER | No Violations | |
| 6199688 | 2005-12-22 0:00 | ER | No Violations | 0.50 |
| 638698654 | 2016-4-19 0:00: | ER | No Violations | |
| 779558640 | 2009-10-20 0:00 | ER | No Violations | 0.50 |
| 833278707 | 2019-1-10 0:00: | ER | No Violations | |
| 884148818 | 2017-11-15 0:00 | ER | No Violations | |
| 919436743 | 2010-11-26 0:00 | ER | No Violations | 0.50 |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0006199688 | US-OH-126909 | 2005-11-30 | Mechanical failure/contamination | |
| 0114767871 | US-OH-103831 | 2008-11-26 | Failure to conduct or pass mech. integrity test | |
| 0994419397 | US-OH-131412 | 2005-07-25 | Pollution/Contamination | |
| 1122298990 | US-OH-103086 | 2005-07-25 | Pollution/Contamination | |
| 1211715369 | US-OH-105544 | 2005-11-30 | Mechanical failure/contamination | |
| 1453910823 | US-OH-113132 | 2007-01-18 | Failure to conduct or pass mech. integrity test | |
| 1794214157 | US-OH-117915 | 2006-12-13 | Failure to conduct or pass mech. integrity test |
For data sources see[5]