If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-005-23046 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89,"lon":-82.15,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashland | |
| Municipality: Perry Township | |
| Operator Name: DEEP RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HASTINGS HAROLD & GLADYS | |
| License Status: Active Injection | |
| License Date: 1976-02-05 | |
| Spud Date: 1976-06-09 | |
| Spud Drilling Contractor: SHORTS DRLG | |
| Final Drill Date: 1976-07-03 | |
| Well Total Depth: 752.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.890000 | |
| Longitude: -82.150000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1976-02-05 | 133 QUAKER STATE OIL REF CORP GeoDate 2/5/76 |
| Enhanced Recovery | 1976-02-05 | Issued Date 2/5/76 Expired Date Acres 0000000 Tool Type RTAF Proposed Formation BEDFORD Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1976-06-09 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| Completed | 1976-07-03 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| Reached Total Depth | 1976-07-03 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| Completion Report Received | 1977-03-04 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 2/5/76 |
| Annulus Pressure Monitoring Approved | 1999-03-16 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| Last Compliance Report | 1999-10-18 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
| Change of Owner | 2002-02-07 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER |
| Change of Owner | 2008-04-24 | Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC |
| Record Last Modified | 2017-02-15 | REV. LOC. 4-7-76, RE-ISSUE 4-23-75, R.I. & S. REC. 2-11-76 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 550 | 578 | 0 |
| 2000-05-22 | 586 | 627 | 0 |
| 586 | 627 | 0 | |
| 550 | 578 | 0 | |
| 550 | 578 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| NITR | 0 | 136 Qts | 0 |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1074731200 | 2007-11-1 0:00: | ER | No Violations | 0.50 |
| -1178698736 | 2003-11-13 0:00 | ER | No Violations | |
| -1272731611 | 2007-12-20 0:00 | ER | No Violations | 2.00 |
| -1294154847 | 2005-12-1 0:00: | ER | No Violations | 0.50 |
| -1361437952 | 2006-4-27 0:00: | ER | No Violations | 0.50 |
| -1400102826 | 2012-5-24 0:00: | ER | No Violations | |
| -1436736186 | 2014-7-17 0:00: | ER | No Violations | |
| -1485683768 | 2019-4-18 0:00: | ER | No Violations | |
| -1525937525 | 2018-1-3 0:00:0 | ER | No Violations | |
| -1549820 | 2004-4-21 0:00: | ER | No Violations | |
| -1775741398 | 2006-11-28 0:00 | ER | No Violations | 0.50 |
| -1793383724 | 2015-3-19 0:00: | ER | No Violations | |
| -1824743305 | 2010-4-5 0:00:0 | ER | No Violations | 0.50 |
| -1882485311 | 2020-8-19 0:00: | ER | No Violations | |
| -1973279830 | 2008-4-2 0:00:0 | ER | No Violations | 1.00 |
| -2048661865 | 2015-5-21 0:00: | ER | No Violations | |
| -2109663363 | 2011-4-14 0:00: | ER | No Violations | 0.50 |
| -273809247 | 2004-4-22 0:00: | ER | No Violations | |
| -280631456 | 2019-7-23 0:00: | ER | No Violations | |
| -307793467 | 2010-12-2 0:00: | ER | No Violations | 0.50 |
| -324772128 | 2019-11-18 0:00 | ER | No Violations | |
| -441406118 | 2009-4-24 0:00: | ER | No Violations | 0.50 |
| -653004524 | 2012-12-4 0:00: | ER | No Violations | |
| -738226921 | 2016-1-4 0:00:0 | ER | No Violations | |
| -765332833 | 2019-1-14 0:00: | ER | No Violations | |
| -792809735 | 2014-3-18 0:00: | ER | No Violations | |
| -838012087 | 2014-10-28 0:00 | ER | No Violations | |
| -855945184 | 2015-10-26 0:00 | ER | No Violations | |
| 0001549820 | 2004-04-21 | Enhanced Recovery Project | No Violations | ERP# 12 injection pressure test. |
| 0010274187 | 2012-09-20 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
| 0047652450 | 2018-05-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0158959456 | 2018-10-01 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0265727312 | 2017-04-24 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0273809247 | 2004-04-22 | Enhanced Recovery Project | No Violations | Injection pressure test. Annular pressure at 0psi. Advised Len Rex to repressure annulus and send resultsto Tom Tomastik. |
| 0307793467 | 2010-12-02 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0345685041 | 2013-04-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Conduct fifteen minute pressure test on well. Passed test. |
| 0423987525 | 2018-08-14 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0441406118 | 2009-04-24 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0459198496 | 2017-01-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0504345697 | 2017-07-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0540127480 | 2017-11-14 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0650486965 | 2018-02-28 | Enhanced Recovery Project | No Violations | Re-Inspect well for integrity. Well head fittings were frozen during previous inspection. |
| 0653004524 | 2012-12-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0681756825 | 2007-05-22 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0690863890 | 2016-10-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0738226921 | 2016-01-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The nipple at the union and the Tee had a slow leak. Notified operator and Well head fitting were replaced. |
| 0792809735 | 2014-03-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0838012087 | 2014-10-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 0849967773 | 2015-11-23 | Enhanced Recovery Project | No Violations | Operator reports this well is shut in due to the Hastings W-30 due to flexible flow line leaks. Both wells are on the same supply line. |
| 0855945184 | 2015-10-26 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well head was shut in. Well head is in fair condition. |
| 0906591184 | 2008-12-18 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 0981271558 | 2016-07-07 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 10274187 | 2012-9-20 0:00: | ER | No Violations | |
| 1074731200 | 2007-11-01 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. 0 psi on annular side. |
| 1178698736 | 2003-11-13 | Enhanced Recovery Project | No Violations | |
| 1272731611 | 2007-12-20 | Enhanced Recovery Project | No Violations | Pressured up on annulus to 220 psi and tested for 15 minutes. 5 psi decline. NOV in compliance. |
| 1294154847 | 2005-12-01 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1359321154 | 2016-04-25 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1361437952 | 2006-04-27 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1400102826 | 2012-05-24 | Enhanced Recovery Project | No Violations | Inspect Well. |
| 1404525674 | 2014-05-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1417994389 | 2020-4-16 0:00: | ER | No Violations | |
| 1436736186 | 2014-07-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1525937525 | 2018-01-03 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The annulus fittings were frozen during this inspection. The fittings were not successfully thawed out. |
| 158959456 | 2018-10-1 0:00: | ER | No Violations | |
| 1599870210 | 2012-02-27 | Enhanced Recovery Project | No Violations | inspect well. |
| 1614841105 | 2013-03-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 1635162482 | 2020-1-30 0:00: | ER | No Violations | |
| 1758261752 | 2009-09-30 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1775741398 | 2006-11-28 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1793383724 | 2015-03-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The wells are shut in due to flow line leak requiring repair. The location is inaccessible due to muddy field conditions. |
| 1824743305 | 2010-04-05 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 1860953088 | 2011-11-17 | Enhanced Recovery Project | No Violations | Inspect well. |
| 1893548325 | 2004-11-17 | Enhanced Recovery Project | No Violations | Injection pressure test. |
| 1973279830 | 2008-04-02 | Enhanced Recovery Project | No Violations | Annulus and injection pressure test. |
| 1980877075 | 2013-10-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
| 2048661865 | 2015-05-21 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Not enough room to install guage. |
| 2058315793 | 2011-07-11 | Enhanced Recovery Project | No Violations | inspect well. |
| 2109663363 | 2011-04-14 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
| 265727312 | 2017-4-24 0:00: | ER | No Violations | |
| 345685041 | 2013-4-4 0:00:0 | ER | No Violations | |
| 423987525 | 2018-8-14 0:00: | ER | No Violations | |
| 459198496 | 2017-1-5 0:00:0 | ER | No Violations | |
| 47652450 | 2018-5-2 0:00:0 | ER | No Violations | |
| 504345697 | 2017-7-18 0:00: | ER | No Violations | |
| 540127480 | 2017-11-14 0:00 | ER | No Violations | |
| 650486965 | 2018-2-28 0:00: | ER | No Violations | |
| 681756825 | 2007-5-22 0:00: | ER | No Violations | 1.00 |
| 690863890 | 2016-10-19 0:00 | ER | No Violations | |
| 849967773 | 2015-11-23 0:00 | ER | No Violations | |
| 906591184 | 2008-12-18 0:00 | ER | No Violations | 0.50 |
| 981271558 | 2016-7-7 0:00:0 | ER | No Violations |
For data sources see[5]