If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-23497 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.76,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Mohican Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: AUSTIN HB & HE | |
License Status: Producing | |
License Date: 2009-07-10 | |
Spud Date: 1982-04-21 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-06-01 | |
Well Total Depth: 630.00 ft | |
Configuration: Vertical | |
Latitude: 40.760000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-03-17 | Issued Date 3/18/82 Expired Date 9/14/82 Acres 0075000 Tool Type CT Proposed Formation BEREA Proposed Depth 00630 Proposed Drill Depth 00630 |
Original Spud | 1982-05-01 | IPN. OIL - 1/2 BBL. |
Completed | 1982-06-01 | IPN. OIL - 1/2 BBL. |
Reached Total Depth | 1982-06-01 | IPN. OIL - 1/2 BBL. |
CO | 1982-06-10 | 270 SHORTS RALPH E DRILLING GeoDate 3/17/82 |
Completion Report Received | 1986-04-29 | IPN. OIL - 1/2 BBL. |
APP | 2009-07-10 | Proposed Formations:BEREA, Issued Date:7/10/2009, Expired Date:7/10/2010 6:00:00 AM, Drilling unit acres:75, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2010-06-29 | Operator changed from 270, SHORTS RALPH E DRILLING to 337, HARLEY DRILLING & PRODUCI |
Construction Permit Expires | 2010-07-10 | IPN. OIL - 1/2 BBL. |
Record Last Modified | 2017-02-15 | IPN. OIL - 1/2 BBL. |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 120 Qts | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-914520643 | 2016-2-4 0:00:0 | AM | No Violations | 0.50 |
000CEN1066 | 1995-07-11 | Production Wells | No Violations | 1509.03 |
000VER1418 | 1997-02-06 | Production Wells | No Violations | |
0914520643 | 2016-02-04 | Administrative Inspection | No Violations | Harley submitted a timeframe for his plans for this well. He indicated that he would return the well to production 90 days from January 21, 2016. The operators plans are approved. |
1460131605 | 2016-04-08 | Production Wells | No Violations | The operator has installed a pump jack, rods and tubing in the well. New flow line has been installed. The well is capable of production. The compliance notice is resolved. The tenant in the farm house said she wants disturbed ground around the tank battery and other wells on the property smoothed up so she can mow her lawn. Harley said he will fix the lawn when he is finished working on the property and the ground is dry enough to smooth the ruts out. The tenant also stated that there is a leak within the tank battery. An old steel line was previously found between the tanks leaking. Harley uncovered the line. He stated the line is not his and is not in use by his equipment. The line is old 1 inch steel. Harley has new 2 inch plastic line connected to the tanks. The line is dry at this time and no gas was coming from it. Harley has installed new berming around the tank battery. |
1580614953 | 2016-03-15 | Production Wells | No Violations | The operator has installed rods and tubing in the well. The pumper stated they are going to be running new flowline to the well. They have to cross the Gatherco line on the property to do so. |
1589551393 | 2015-12-22 | Production Wells | Violations Noted | There is open surface casing in the well. Rods and tubing have been stripped from the well. There is no pump jack or flowline hookup at the location. The well is not capable of production. The resident at the property advised that the well has not produced in her 12 years living there. The well owner/operator shall submit a written plugging schedule to Tom Zacharyasz at 116 East High St, Mt. Vernon, OH 43050 within 30 days, per OAC 1501:9-11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. |
CEN1066 | 1995-7-11 0:00: | PW | No Violations | |
VER1418 | 1997-2-6 0:00:0 | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1589551393 | US-OH-115553 | 2016-05-13 | Well shall be plugged |
For data sources see[8]