X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-005-23600

Well Details

Well ID: 34-005-23600
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Perry Township
Operator Name: DEEP RESOURCES LLC
Well Pad ID:
Farm/Lease Name: SMALLEY ELLEN (ERP #16)
License Status: Active Injection
License Date: 1983-06-07
Spud Date: 1983-06-22
Spud Drilling Contractor: WALTZ BROS DRLG
Final Drill Date: 1983-06-27
Well Total Depth: 720.00 ft
Configuration: Vertical
Latitude: 40.880000
Longitude: -82.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Enhanced Recovery 1983-06-07 Issued Date 6/7/83 Expired Date 12/4/83 Acres 0081510 Tool Type RTAF Proposed Formation BEREA Proposed Depth 00720 Proposed Drill Depth 00720
Original Spud 1983-06-22 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Completed 1983-06-27 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Reached Total Depth 1983-06-27 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
CO 1983-10-07 133 QUAKER STATE OIL REF CORP GeoDate 6/7/83
First Injection 1983-10-07 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Completion Report Received 1983-10-24 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Construction Permit Expires 1983-12-04 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
CO 1995-10-18 182 BELDEN & BLAKE CO GeoDate 6/7/83
Annulus Pressure Monitoring Approved 1999-02-03 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Change of Owner 2002-02-07 Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER
Change of Owner 2008-04-24 Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC
Last Compliance Report 2012-05-10 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83
Record Last Modified 2017-02-15 LAST INJECTION OCCURRED IN 1998 CHG IN TOOL 6-18-83

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-23 612 662 0
612 662 0
612 662 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 100 Qts 0 100 QTS NITRO; 612-662

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1152314088 2010-3-30 0:00: ER No Violations 0.50
-1175433980 2011-1-19 0:00: ER No Violations 1.00
-1216747908 2011-4-12 0:00: ER No Violations
-149790919 2012-9-20 0:00: ER No Violations
-1529221645 2016-11-2 0:00: ER No Violations
-1658190069 2009-10-20 0:00 ER No Violations 0.50
-1723958165 2017-11-15 0:00 ER No Violations
-1755810035 2016-1-5 0:00:0 ER No Violations
-1858315147 2020-4-22 0:00: ER No Violations
-1947717474 2015-8-31 0:00: ER No Violations
-1995026062 2019-4-11 0:00: ER No Violations
-2015799536 2012-11-27 0:00 ER No Violations
-224439299 2014-5-6 0:00:0 ER No Violations
-328089546 2005-11-29 0:00 ER No Violations 0.50
-366631079 2019-11-18 0:00 ER No Violations
-423048198 2006-12-13 0:00 ER No Violations 0.50
-428417343 2004-4-22 0:00: ER No Violations
-479472723 2017-1-9 0:00:0 ER No Violations
-516618950 2020-7-8 0:00:0 ER No Violations
-526391650 2010-11-26 0:00 ER No Violations 0.50
-541197836 2008-12-10 0:00 ER No Violations 0.50
-546031033 2018-8-13 0:00: ER No Violations
-552318970 2014-10-29 0:00 ER No Violations
-598135649 2018-5-2 0:00:0 ER No Violations
-681586151 2018-1-8 0:00:0 ER No Violations
-813125881 2014-7-17 0:00: ER No Violations
0069880297 2018-05-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0149790919 2012-09-20 Enhanced Recovery Project No Violations Inspect Well. Site ok.
0172445936 2008-02-20 Enhanced Recovery Project No Violations Annulus and injection pressure test.
0224439299 2014-05-06 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0238519724 2013-05-22 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0301601868 2007-10-30 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0311957230 2015-10-30 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The well head is in good condition.
0328089546 2005-11-29 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0423048198 2006-12-13 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0428417343 2004-04-22 Enhanced Recovery Project No Violations Injection pressure test. Advised Len Rex to pressure up annulus and re-test in 30 days. Report to Tom Tomastick.
0479472723 2017-01-09 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0498603276 2015-05-20 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The injection line tubing is heavily corroded.
0518413375 2014-03-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0526391650 2010-11-26 Enhanced Recovery Project No Violations Injection and annulus pressure test. Injection tubing needs a test valve installed.
0533694244 2017-04-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0538616780 2017-07-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0541197836 2008-12-10 Enhanced Recovery Project No Violations Mini test on annulus. Pumped to 200 psi and 0 psi decline in 15 minutes.
0546031033 2018-08-13 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0552318970 2014-10-29 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0598135649 2018-05-02 Enhanced Recovery Project No Violations Inspect well with operator to preform monthly pressure test of the annulus on the well.
0615912127 2013-12-04 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Pump shut down during inspection.
0681586151 2018-01-08 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0813125881 2014-07-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0895150071 2003-08-14 Enhanced Recovery Project No Violations
0960857031 2016-04-19 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The nipple at the injection line shut off is in poor condition.
1004578388 2009-04-23 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1035627219 2011-04-13 Enhanced Recovery Project No Violations Injection and annulus pressure test. Pumped annular side to 380 psi with inhibitor. 0 psi decline in 15 minutes.
1049287087 2011-10-17 Enhanced Recovery Project No Violations Inspect well.
1100874482 2012-05-24 Enhanced Recovery Project No Violations Inspect Well.
1129054241 2016-07-08 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The well head fittings have been repaired recently.
1152314088 2010-03-30 Enhanced Recovery Project No Violations Injection and annulus pressure test. 0 psi on annulus.
1175433980 2011-01-19 Enhanced Recovery Project No Violations Injection and annulus pressure test. Topped off annulus between 2 3/8 and surface casing with 45 sacks of Class A cement. 320 to surface. 1-17-2011.
1216747908 2011-04-12 Enhanced Recovery Project Violations Noted Injection and annulus pressure test. Pressures are equal @ 320 psi. Reset packer and test.
1296579775 2011-02-01 Enhanced Recovery Project No Violations Replaced injection valve on top of injection tubing. Replaced injection packer with a Butler Larkin compression packer. Tested annulus at 400 psi for 15 minutes.
1304786325 2012-02-27 Enhanced Recovery Project No Violations Inspect Well. Broke in. shut in well.
1337002824 2012-04-12 Enhanced Recovery Project No Violations Service tubing replace packer. Hole in tubing located. Run tubing and packer. Circulate inhibitor. Pressure annulus up, test, and pass.
1415423628 2005-04-27 Enhanced Recovery Project No Violations Injection wll test.
1516433508 2004-11-18 Enhanced Recovery Project No Violations Injection pressure test.
1529221645 2016-11-02 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The union and flow line fittings have been replaced recently.
1618714903 2011-07-12 Enhanced Recovery Project No Violations Inspect well. Initial pressure zero, conduct mini test, ok.
1657095703 2013-03-04 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1657206879 2018-10-10 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1658190069 2009-10-20 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1683497140 2015-03-31 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1723958165 2017-11-15 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
172445936 2008-2-20 0:00: ER No Violations 1.00
1755810035 2016-01-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1780875067 2012-04-11 Enhanced Recovery Project No Violations Inspect well. Service tubing. Run tubing into well with new packer. Pump inhibitor, flow on back side of tubing. Pull tubing and test each section. Hole located in pipe.
1883507350 2010-04-02 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1909403227 2008-12-02 Enhanced Recovery Project Violations Noted Injection and annulus pressure test. Annular side needs pumped to 200 psi and tested.
1917675192 2019-1-10 0:00: ER No Violations
1931036288 2007-04-03 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1947717474 2015-08-31 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
2015799536 2012-11-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
2028563936 2006-04-13 Enhanced Recovery Project No Violations Injection and annulus pressure test. Constructed with 2 tubing cemented at Berea cap and 1 tubing on apacker used for injection.
238519724 2013-5-22 0:00: ER No Violations
301601868 2007-10-30 0:00 ER No Violations 0.50
311957230 2015-10-30 0:00 ER No Violations
498603276 2015-5-20 0:00: ER No Violations
518413375 2014-3-17 0:00: ER No Violations
533694244 2017-4-27 0:00: ER No Violations
538616780 2017-7-18 0:00: ER No Violations
615912127 2013-12-4 0:00: ER No Violations
650548611 2020-1-23 0:00: ER No Violations
69880297 2018-5-1 0:00:0 ER No Violations
780402595 2019-7-10 0:00: ER No Violations
895150071 2003-8-14 0:00: ER No Violations
960857031 2016-4-19 0:00: ER No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1216747908 US-OH-105669 2011-04-12 Failure to conduct or pass mech. integrity test
1909403227 US-OH-119209 2008-11-26 Failure to conduct or pass mech. integrity test

For data sources see[5]

References