If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-23748 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.88,"lon":-82.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Perry Township | |
Operator Name: DEEP RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: BRETTIN | |
License Status: Active Injection | |
License Date: 1984-08-14 | |
Spud Date: 1984-09-14 | |
Spud Drilling Contractor: WALTZ BROS DRLG | |
Final Drill Date: 1984-09-19 | |
Well Total Depth: 817.00 ft | |
Configuration: Vertical | |
Latitude: 40.880000 | |
Longitude: -82.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-08-14 | 133 QUAKER STATE OIL REF CORP GeoDate 8/14/84 |
Enhanced Recovery | 1984-08-14 | Issued Date 8/14/84 Expired Date 2/10/85 Acres 0080000 Tool Type RTA Proposed Formation BEREA Proposed Depth 00817 Proposed Drill Depth 00817 |
Original Spud | 1984-09-14 | |
Completed | 1984-09-19 | |
Reached Total Depth | 1984-09-19 | |
First Injection | 1984-12-29 | |
Completion Report Received | 1985-01-15 | |
Construction Permit Expires | 1985-02-10 | |
CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 8/14/84 |
Annulus Pressure Monitoring Approved | 1998-12-03 | |
Last Compliance Report | 1999-12-22 | |
Change of Owner | 2002-02-07 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER |
Change of Owner | 2008-04-24 | Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-05-23 | 706 | 750 | 0 |
706 | 750 | 0 | |
706 | 750 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 100 Qts | 0 | LOGS ATTACHED |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1007731448 | 2019-11-15 0:00 | ER | No Violations | |
-1039457532 | 2015-3-31 0:00: | ER | No Violations | |
-10506276 | 2015-8-28 0:00: | ER | No Violations | |
-1123671584 | 2018-4-9 0:00:0 | ER | No Violations | |
-1195094155 | 2012-9-20 0:00: | ER | No Violations | |
-1203418281 | 2010-3-30 0:00: | ER | No Violations | 0.50 |
-1259539151 | 2015-11-25 0:00 | WR | No Violations | |
-1311779396 | 2012-2-6 0:00:0 | ER | No Violations | |
-1408312008 | 2016-4-19 0:00: | ER | No Violations | |
-1556561395 | 2017-4-24 0:00: | ER | No Violations | |
-1834602117 | 2018-1-4 0:00:0 | ER | No Violations | |
-1962801391 | 2012-6-4 0:00:0 | ER | No Violations | |
-2046327248 | 2013-12-4 0:00: | ER | No Violations | |
-2095385935 | 2017-7-18 0:00: | ER | No Violations | |
-2106610115 | 2006-4-6 0:00:0 | ER | No Violations | 0.50 |
-2116648088 | 2008-12-10 0:00 | ER | No Violations | 0.50 |
-35000880 | 2013-5-22 0:00: | ER | No Violations | |
-35402959 | 2005-11-29 0:00 | ER | No Violations | 0.50 |
-360535787 | 2004-11-18 0:00 | ER | No Violations | |
-562858837 | 2018-10-2 0:00: | ER | No Violations | |
-760866115 | 2009-9-30 0:00: | ER | No Violations | 1.00 |
-851491146 | 2014-5-6 0:00:0 | ER | No Violations | |
-86920380 | 2019-4-11 0:00: | ER | No Violations | |
-891139077 | 2020-7-9 0:00:0 | ER | No Violations | |
-985955307 | 2015-9-23 0:00: | ER | No Violations | |
0010506276 | 2015-08-28 | Enhanced Recovery Project | Violations Noted | Inspect well for integrity and pressure. The well was shut in during the March 31st 2015 inspection. The Pressure testing of well is required. |
0035000880 | 2013-05-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0035402959 | 2005-11-29 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0049902880 | 2015-05-20 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. |
0060146317 | 2014-10-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0072296082 | 2003-08-14 | Enhanced Recovery Project | No Violations | |
0073308864 | 2017-01-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0084097943 | 2016-11-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0215776805 | 2008-02-15 | Enhanced Recovery Project | No Violations | Annulus and injection pressure test. |
0320234598 | 2016-07-11 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0360535787 | 2004-11-18 | Enhanced Recovery Project | No Violations | Injection pressure test. |
0404632080 | 2011-10-17 | Enhanced Recovery Project | No Violations | Inspect well. |
0414460550 | 2004-04-22 | Enhanced Recovery Project | No Violations | Injection pressure test. |
0483675578 | 2019-01-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0499533856 | 2011-04-12 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0542707232 | 2008-11-25 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure test. Pressures are equal @ 260 psi. |
0562858837 | 2018-10-02 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0585560891 | 2009-04-27 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0615983317 | 2010-11-26 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
0760866115 | 2009-09-30 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure test. |
0851491146 | 2014-05-06 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0985955307 | 2015-09-23 | Enhanced Recovery Project | No Violations | Inspect well with operator to pressure test annulus. The well was shut in upon inspection and has developed a vacuum. The annulus is also on vacuum. The well requires service. |
0992905939 | 2017-10-26 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1039457532 | 2015-03-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Pressure has equalized well temporarily shut in until annulus can be pressure tested. |
1062533949 | 2014-03-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. During morning inspection the annulus valve was frozen. Retested annulus when valve thawed out. |
1123671584 | 2018-04-09 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1159519253 | 2005-04-28 | Enhanced Recovery Project | No Violations | Injection well test. |
1195094155 | 2012-09-20 | Enhanced Recovery Project | No Violations | Inspect Well. Burried Line leak at connection near well head. |
1203418281 | 2010-03-30 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. Pressures equal at 290 psi. |
1234445271 | 2015-10-26 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well is shut in. |
1239656789 | 2018-08-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1254318519 | 2009-09-30 | Enhanced Recovery Project | Violations Noted | Injection and annulus pressure test. |
1256149741 | 2009-10-21 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1259539151 | 2015-11-25 | Work Over Reconditioning | No Violations | The operator pulled the tubing and the packer from the borehole. The well was shut in without the tubing and packer. The operator ran in the hole with a rebuilt Parmaco style packer and tubing. The packer was constructed with the PVC lined tubing and parts accumulated in the shop. The top most joint of tubing was replaced. Total of 22 joints of PVC lined tubing were installed in the well. An eight inch tail pipe was installed on the packer. The well was loaded with about 300 gallons of fresh water with corrosion inhibitor and circulated to the surface. The annulus was pressured up to 378 psi and the pressure monitored for a period of 20 minutes. The pressure stabilized from the 5 minute reading to the 20 minute reading with a pressure loss of 4 %. The Mechanical Integrity test is within the margin of error of 5 %. The well passed and the operator was notified that the well can be put into production. |
1302955662 | 2007-05-31 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1311779396 | 2012-02-06 | Enhanced Recovery Project | No Violations | Inspect Well. |
1389526685 | 2020-1-22 0:00: | ER | No Violations | |
1408312008 | 2016-04-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1429679844 | 2016-01-05 | Work Over Reconditioning | No Violations | Operator Released packer and pulled tubing. Packer rusted through at set pin. |
1442660865 | 2014-07-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1453213438 | 2016-01-15 | Work Over Reconditioning | No Violations | The well was determined to have equalized with the annulus on 3/31/2015, the well was shut in. The operator pulled the 27 joints of 25 foot long PVC lined one inch tubing and packer on 1/5/2016. The well was temporarily shut in without the tubing and packer. The operator ran in the hole on 1/14/2016 with a rebuilt Parmaco style packer and 27 joints of 25 foot long PVC lined one inch tubing. One joint of tubing was replaced due to holes. The packer was constructed with the PVC lined tubing and parts accumulated in the shop. The well was loaded with about 300 gallons of fresh water with corrosion inhibitor and circulated to the surface on 1/15/2016. The annulus was pressured up to 420 psi and the pressure monitored for 15 minutes. There was five pounds pressure loss over a 15 minute period. This is less than 2 percent loss and within the margin of error. The well passed the Mechanical Integrity Test and the operator was notified that the well can be put into production. |
1534805472 | 2006-12-13 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1536669680 | 2015-12-01 | Work Over Reconditioning | No Violations | The service rig has been mobilized and setup at well head. |
1556561395 | 2017-04-24 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Measure the specific gravity of the water at 1.050 units. |
1728769219 | 2012-06-06 | Enhanced Recovery Project | No Violations | Packer reset and pressued up. Test mini test at 430 psi. |
1834602117 | 2018-01-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1875581349 | 2010-04-02 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1915399125 | 2013-03-05 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1927635615 | 2007-11-01 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. |
1959891090 | 2012-11-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1962801391 | 2012-06-04 | Enhanced Recovery Project | No Violations | Inspect Well. Pressure equilized. Shut in well. |
2046327248 | 2013-12-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Pump shut down during inspection. |
2086491096 | 2011-07-12 | Enhanced Recovery Project | No Violations | inspect well. |
2095385935 | 2017-07-18 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
2106610115 | 2006-04-06 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. Constructed with 2 tubing cemented at Berea cap with 1 tubing on a packer. |
2116648088 | 2008-12-10 | Enhanced Recovery Project | No Violations | Mini test on annulus. Pumped to 380 psi for 15 minutes. No decline in pressure. |
215776805 | 2008-2-15 0:00: | ER | No Violations | 1.00 |
320234598 | 2016-7-11 0:00: | ER | No Violations | |
375401871 | 2019-7-2 0:00:0 | ER | No Violations | |
404632080 | 2011-10-17 0:00 | ER | No Violations | |
414460550 | 2004-4-22 0:00: | ER | No Violations | |
483675578 | 2019-1-4 0:00:0 | ER | No Violations | |
49902880 | 2015-5-20 0:00: | ER | No Violations | |
499533856 | 2011-4-12 0:00: | ER | No Violations | 0.50 |
542707232 | 2008-11-25 0:00 | ER | No Violations | 1.00 |
585560891 | 2009-4-27 0:00: | ER | No Violations | 0.50 |
60146317 | 2014-10-28 0:00 | ER | No Violations | |
615983317 | 2010-11-26 0:00 | ER | No Violations | 0.50 |
72296082 | 2003-8-14 0:00: | ER | No Violations | |
73308864 | 2017-1-9 0:00:0 | ER | No Violations | |
84097943 | 2016-11-2 0:00: | ER | No Violations | |
858858237 | 2020-4-22 0:00: | ER | No Violations | |
992905939 | 2017-10-26 0:00 | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0010506276 | US-OH-100844 | 2016-02-12 | Failure to conduct or pass mech. integrity test | |
0542707232 | US-OH-125948 | 2008-11-25 | Failure to conduct or pass mech. integrity test | |
0760866115 | US-OH-128653 | 2009-09-30 | Failure to conduct or pass mech. integrity test | |
1254318519 | US-OH-106850 | 2009-09-30 | Failure to conduct or pass mech. integrity test |
For data sources see[5]