If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-24143 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Perry Township | |
Operator Name: DEEP RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: GORTNER(ERP #12) | |
License Status: Active Injection | |
License Date: 2010-08-30 | |
Spud Date: 2009-10-22 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2009-11-06 | |
Well Total Depth: 770.00 ft | |
Configuration: Vertical | |
Latitude: 40.890000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-09-18 | Proposed Formations:BEREA, Issued Date:9/18/2009, Expired Date:9/18/2010 6:00:00 AM, Drilling unit acres:123.75, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2009-10-22 | CORE FROM 544-694' |
Reached Total Depth | 2009-11-06 | CORE FROM 544-694' |
APP | 2010-08-30 | Proposed Formations:BEREA, Issued Date:8/30/2010, Expired Date:8/29/2012 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:EOR, Proposed Well Class:ERP |
Completion Report Received | 2012-01-13 | CORE FROM 544-694' |
First Injection | 2012-02-01 | CORE FROM 544-694' |
Construction Permit Expires | 2012-08-29 | CORE FROM 544-694' |
Last Compliance Report | 2013-06-14 | CORE FROM 544-694' |
Record Last Modified | 2016-07-06 | CORE FROM 544-694' |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-13 | 633 | 652 | 57 |
2012-01-13 | 656 | 666 | 30 |
633 | 652 | 57 | |
656 | 666 | 30 | |
672 | 682 | 30 | |
633 | 652 | 57 | |
2012-01-13 | 672 | 682 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-10-12 | ACID | 0 | 600 Gal | 0 | Universal Well Services Inc. | |
2011-08-12 | ACID | 0 | 500 Gal | 0 | Universal Well Services Inc. |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1157182636 | 2018-1-30 0:00: | ER | No Violations | |
-1250116755 | 2017-10-19 0:00 | ER | No Violations | |
-125618304 | 2019-7-23 0:00: | ER | No Violations | |
-1467917648 | 2012-6-4 0:00:0 | ER | No Violations | |
-150279328 | 2012-3-7 0:00:0 | ER | No Violations | |
-1561942465 | 2016-4-19 0:00: | ER | No Violations | |
-1682040145 | 2020-4-22 0:00: | ER | No Violations | |
-1752362972 | 2015-8-31 0:00: | ER | No Violations | |
-1795068181 | 2016-7-11 0:00: | ER | No Violations | |
-1915300495 | 2017-1-30 0:00: | ER | No Violations | |
-2009678321 | 2020-1-30 0:00: | ER | No Violations | |
-201565215 | 2020-7-15 0:00: | ER | No Violations | |
-2132301043 | 2011-7-12 0:00: | ER | No Violations | |
-247856248 | 2018-8-15 0:00: | ER | No Violations | |
-359177336 | 2019-2-8 0:00:0 | ER | No Violations | |
-669304409 | 2019-4-22 0:00: | ER | No Violations | |
-722206087 | 2014-7-17 0:00: | ER | No Violations | |
-732797969 | 2013-3-4 0:00:0 | ER | No Violations | |
-922565145 | 2014-10-28 0:00 | ER | No Violations | |
-982514651 | 2015-5-13 0:00: | ER | No Violations | |
0099800144 | 2018-02-28 | Enhanced Recovery Project | No Violations | Re-Inspect well for integrity. Well head fittings were frozen during previous inspection. |
0150279328 | 2012-03-07 | Enhanced Recovery Project | No Violations | Inspect Well. |
0217684475 | 2010-08-03 | Enhanced Recovery Project | No Violations | Well was drilled as a production well, but never produced. I witnessed the surface casing and production casing cement jobs. Good circulation of cement on both strings. No water wells within 200 of well. This well lies in ERP# 12 area of review. Muddy Fork river lies to east of well location. Drilling pits were closed after drilling. |
0247856248 | 2018-08-15 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0301536023 | 2014-03-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Injection line is completed with a 2 inch fitting. |
0467314733 | 2015-03-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The injector line valve is leaking and requires replacement. Well temporarily shut in until repairs can be made. |
0722206087 | 2014-07-17 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0732797969 | 2013-03-04 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well has pressured up, a pump jack has been temporarily set on well. |
0836452889 | 2009-11-25 | Preliminary Restoration | No Violations | Well swedged until core sample results are back. Drilling pit is closed. Cloudy, 40 degrees. |
0902889285 | 2015-10-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The well head is in good condition. |
0907931940 | 2012-09-11 | Enhanced Recovery Project | No Violations | Inspect Well. Site ok. |
0922565145 | 2014-10-28 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
0982514651 | 2015-05-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1053449680 | 2014-05-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1059300270 | 2013-10-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Flow meter has failed and valve has slow drip. |
1090678647 | 2013-08-29 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Annulus has equalized with the injector. Well shut in for service. |
1157182636 | 2018-01-30 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The two inch shutoff valve for the injection line test port was frozen solid with water during this inspection. |
1187390908 | 2018-10-12 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1250116755 | 2017-10-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1257349842 | 2009-11-04 | Enhanced Recovery Project | No Violations | Running core samples in Berea Sandstone. |
1327081266 | 2011-11-17 | Enhanced Recovery Project | No Violations | Inspect well. Run packer and tubing. Circulate inhibitor, pressure well and test for 15 minutes at 400 psi. |
1369826054 | 2013-05-22 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. Well has been setup to produce oil temporarily and will be converted back to an injector. |
1375375206 | 2013-06-12 | Enhanced Recovery Project | No Violations | Inspect well. Tubing with new Ed DuPont home made Compression packer installed. Pressure test well and held at 380 psi. |
1380283991 | 2013-09-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity. The packer slipped due to formation pressure and was reset. A tie down was installed to hold packer in place. |
1384526884 | 2012-11-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1467917648 | 2012-06-04 | Enhanced Recovery Project | No Violations | Inspect Well. |
1561942465 | 2016-04-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1644034492 | 2017-04-13 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1752362972 | 2015-08-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. At time of inspection a 1/4 inch fitting was not on injection line. This has subsequently been resolved. |
1795068181 | 2016-07-11 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1812532555 | 2018-04-27 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1834277819 | 2017-07-31 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
1915300495 | 2017-01-30 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. The injection line test port was frozen due to cold weather and was not available during this inspection. |
1967591157 | 2016-10-19 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
2015894632 | 2011-11-17 | Salt Water Injection Well | No Violations | On site for setting of packer and new tubing. See MIT Report. |
2036717312 | 2016-01-07 | Enhanced Recovery Project | No Violations | Inspect well for integrity and pressure. |
2132301043 | 2011-07-12 | Enhanced Recovery Project | No Violations | Well not in service. |
217684475 | 2010-8-3 0:00:0 | ER | No Violations | 1.00 |
301536023 | 2014-3-17 0:00: | ER | No Violations | |
41329179 | 2019-10-24 0:00 | ER | No Violations | |
467314733 | 2015-3-31 0:00: | ER | No Violations | |
489466216 | 2019-1-14 0:00: | ER | No Violations | |
836452889 | 2009-11-25 0:00 | PL | No Violations | 0.50 |
902889285 | 2015-10-27 0:00 | ER | No Violations | |
907931940 | 2012-9-11 0:00: | ER | No Violations | |
99800144 | 2018-2-28 0:00: | ER | No Violations |
For data sources see[5]