If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-24181 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.67,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Lake Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: E & J GOLF PROPERTIES | |
License Status: Producing | |
License Date: 2014-10-16 | |
Spud Date: 2015-11-02 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2015-11-10 | |
Well Total Depth: 5066.00 ft | |
Configuration: Vertical | |
Latitude: 40.670000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-16 | Proposed Formations:TREMPEALEAU, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-11-10 | |
Completion Report Received | 2016-02-01 | |
Construction Permit Expires | 2016-10-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-04 | 4950 | 4990 | 120 |
4950 | 4990 | 120 | |
4950 | 4990 | 120 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-11-19 | ACID | 15 | 4000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 291.00 | 765.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 391.00 | 709.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 473.00 | 699.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | HARLEY DRILLING & PRODUCING LT | Brine | 835 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | Brine | 185 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | Brine | 285 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | Brine | 255 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1235969444 | 2016-1-4 0:00:0 | PW | No Violations | 1.00 |
-2064956165 | 2016-1-28 0:00: | AM | No Violations | 1.00 |
-2105774686 | 2018-2-21 0:00: | PW | No Violations | |
-453247163 | 2015-11-10 0:00 | CS | No Violations | 0.50 |
-860576087 | 2015-11-4 0:00: | CS | No Violations | 3.00 |
0261710493 | 2015-11-02 | Casing String Witnessed | No Violations | Poulson Drilling is on location drilling conductor hole on freshwater mud. Drillers mixed heavy mud because 100 feet of drift was anticipated. Only 45 feet of drift was encountered. Poulson requested permission to set 2 joints of conductor casing due to less than anticipated drift and mud causing cuttings to circulate through the pump. Permission was granted. The rig tripped the drill bit out of the hole, ran 11.75 inch conductor pipe and waited on cement trucks to set casing. See the casing ticket for details. |
0453247163 | 2015-11-10 | Casing String Witnessed | No Violations | Poulson Drilling requested an inspection to witness cementing the production casing. See the casing ticket for details. |
0860576087 | 2015-11-04 | Casing String Witnessed | No Violations | Poulson Drilling requested an inspection to witness surface casing cement. Cement trucks were delayed on a plug job. See the casing ticket for details. |
1235969444 | 2016-01-04 | Production Wells | No Violations | Harley has not submitted a waiver request for his tank battery location yet. He has not contacted the Division since 12/18/15. |
1446474368 | 2015-10-30 | Surface Facility Construction | No Violations | Palmer Excavating is on location with a dozer and excavator building the lease road and rig location. Poulson Drilling will be moving their rig in over the weekend. |
1446565683 | 2015-11-03 | Drill / Deepen / Reopen | No Violations | Poulson Drilling resumed drilling at approximately 1AM. The rig is drilling on fresh water mud at 370 feet. The rig operator reports that they have not lost any fluid. The well is being drilled on a golf course; there is an unused waterwell 255 feet south of the drill rig. The water well is equipped with a hand pump that is inoperational and is located on the golf course near hole 7 tee. |
1450202278 | 2015-12-11 | Drill / Deepen / Reopen | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. ID needs to be posted. There are 2-200 barrel tanks and a 100 barrel tank in the tank battery. There is also a separator in the tank battery. The first tank measures 34 feet from the edge of the roadway and the separator measures 6 feet from the 100 barrel tank. In a phone call on 12/15/15, Steve Harley advised that the 100 barrel is a water tank. I told him spacing requirements still apply and the separator needs to be 10 feet from the tank and the tanks need to be 50 feet from the roadway. Steve stated he would go check the spacings. |
1450713792 | 2015-12-18 | Drill / Deepen / Reopen | No Violations | Steve Harley met with the inspector at the tank battery. The landowner specified the tank location. The property is a golf course and there is a tee at the rear of the tank battery. The landowner wont let the tanks any closer to the tee which prevents Steve from moving them back from the roadway. Steve was advised that if he wishes to attempt to get a variance for the tank setback, that he needs to submit a written request to the Division explaining the circumstances. |
1801178297 | 2016-03-14 | Production Wells | No Violations | ID has been posted at the tank battery. The well is equipped with a pump jack, rods and tubing and is in production. There are 2-200 barrel tanks, a 100 barrel tank and a separator in the tank battery. The operator was contacted and the heater was shut off. |
2064956165 | 2016-01-28 | Administrative Inspection | No Violations | Steve Harley requested to meet with the inspector to turn in a request for permission to leave his tank battery at its present location. The request is under review. |
2105774686 | 2018-02-21 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. Mac Oil arrived to pick up water from the tanks during inspection. Jim Jenkins of Harley Drilling arrived during inspection. The well was pumping during inspection. There are 2-200 barrel tanks, a 100 barrel tank and a separator in the tank battery. ID is posted at the tanks. |
261710493 | 2015-11-2 0:00: | CS | No Violations | 5.00 |
For data sources see[9]