If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-24196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.91,"lon":-82.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Orange Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: GAYLORD ELSON UNIT | |
License Status: Producing | |
License Date: 2017-10-13 | |
Spud Date: 2017-11-25 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2017-12-05 | |
Well Total Depth: 4876.00 ft | |
Configuration: Vertical | |
Latitude: 40.910000 | |
Longitude: -82.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-13 | Proposed Formations:TREMPEALEAU B ZONE, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:179.57, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2017-12-05 | |
Record Last Modified | 2018-07-24 | |
Construction Permit Expires | 2019-10-13 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-17 | ACID | 0 | 2802 Gal | 0 | Producers Service Corporation | The well was re-acidized due to concerns that the first job did not treat the upper perforations. A bridge plug was set between the upper and lower zones. |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1676775613 | 2018-6-21 0:00: | DD | No Violations | |
-1803751957 | 2018-8-27 0:00: | DD | No Violations | |
-228416417 | 2018-8-13 0:00: | PL | No Violations | |
-413282151 | 2018-5-10 0:00: | DD | No Violations | |
0228416417 | 2018-08-13 | Preliminary Restoration | No Violations | MFC has not resumed work at this location yet. The well needs to be hooked up to flow line and the location needs to be finish graded and topsoiled. |
0278736233 | 2018-07-12 | Drill / Deepen / Reopen | No Violations | The Bakerwell service rig is on the well. They are working on swabbing the well. A bridge plug has been set between the upper and lower perforations at 4831 feet. |
0316251318 | 2017-11-20 | Drill / Deepen / Reopen | No Violations | MFC personnel are on location building access road and grading the drill site. They are excavating pits as well. |
0320835384 | 2018-01-03 | Drill / Deepen / Reopen | No Violations | MFC is on location performing equipment maintenance on earthmoving equipment. The pits have been closed. |
0413282151 | 2018-05-10 | Drill / Deepen / Reopen | No Violations | No personnel on location and there is no equipment on site. The location needs to be finish graded and the road needs to be surfaced. Ground conditions are muddy. |
0413503591 | 2017-11-27 | Casing String Witnessed | No Violations | The operator requested inspection to witness surface casing cement. See the casing ticket for details. |
0641473275 | 2018-06-19 | Drill / Deepen / Reopen | No Violations | Bakerwell has moved the service rig to the well location. Randy Matheney of MFC Drilling was on location. He stated they are going to clean out the production casing to the wiper plug, spot acid and perforate the casing. The well will be stimulated on Monday, 6/25/18. |
1014676661 | 2018-07-17 | Drill / Deepen / Reopen | No Violations | The Bakerwell service rig is on the well. Producers is on location acidizing the well. Randy Matheney of MFC was on location. |
1223599679 | 2017-11-29 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 1700 feet. The Berea top was at 657 feet. The Berea is behind 8 inch casing. Cement was tagged inside the 8 inch at 988 feet. Twelve 60 pound bags of dry cement were placed down the 8 inch-11 inch annulus to top up the cement to surface. Cement fell back after pumping due to a leak from the cement head. Cement was initially displaced to 1009 feet but due to the leaking head, flowed back to 988 feet. |
1445391803 | 2018-07-13 | Drill / Deepen / Reopen | No Violations | Bakerwell swabbed fluid from the well this morning. MFC is planning to re-acidize the well next week however they dont have confirmation of a date at this time. |
1511796935 | 2017-11-27 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 700 feet. A deviation survey was ran and showed 1.4 degrees. 11.75 inch casing was set on Sunday, 11/26/17. The job was not witnessed due to insufficient notice to arrive. 24 pound per foot 8.625 inch casing is on the pipe racks for the next casing string. Casing is new. |
1512488938 | 2017-12-05 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 4814 feet. They are drilling another 30 to 40 feet of hole, conditioning hole and tripping out. Cement is planned for tomorrow. |
1512585111 | 2017-12-06 | Casing String Witnessed | No Violations | The operator requested inspection to witness production casing cement. The rig was behind schedule running casing. |
1531251899 | 2018-06-21 | Drill / Deepen / Reopen | No Violations | Bakerwell moved their service rig onto the well. They are preparing to perforate and acidize the well. The job is planned for the week of the 25th. |
1533828670 | 2018-08-09 | Preliminary Restoration | No Violations | A 100 barrel and 200 barrel tank have been delivered to the location. The operator needs to finish grade and topsoil the location to complete preliminary restoration. |
1676775613 | 2018-06-21 | Drill / Deepen / Reopen | No Violations | Bakerwell service rig is rigged up on the well. The rig crew is waiting on wireline service to perforate the production casing. |
1696707339 | 2017-12-01 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 2870 feet. |
1803751957 | 2018-08-27 | Drill / Deepen / Reopen | No Violations | The well is shut in. No personnel were working on location during inspection. Two production tanks are on location near the well. The tanks have not been connected or installed in a tank battery yet. The operator needs to finish grade the location to complete restoration. Randy at MFC was contacted following inspection to determine their plans for completing preliminary restoration. |
1950520648 | 2017-11-17 | Drill / Deepen / Reopen | No Violations | MFC is on location building access road and grading the pad. Pits have not been excavated yet. |
278736233 | 2018-7-12 0:00: | DD | No Violations | |
316251318 | 2017-11-20 0:00 | DD | No Violations | |
320835384 | 2018-1-3 0:00:0 | DD | No Violations | |
413503591 | 2017-11-27 0:00 | CS | No Violations | |
641473275 | 2018-6-19 0:00: | DD | No Violations |
For data sources see[4]